Little Wabash Drainage – Phase 1 Piping

Closed State & local contract opportunity Posted

Solicitation number
3422018
State
Illinois
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Mattoon is soliciting bids for Little Wabash Drainage Phase 1 Piping, a storm sewer construction project in Clinton County, Illinois, with proposals due September 9, 2026.

The scope is construction of approximately 3,130 linear feet of new 60-inch-diameter storm sewer to replace the existing 30-inch Little Wabash District Tile. Work begins at the existing 30-inch outlet to the Little Wabash River and extends north along the approximate alignment of the existing pipe to the south side of Illinois Route 16 (Marshall Avenue). The project includes a cast-in-place concrete headwall, manholes, inlets, and site restoration. Detailed technical specifications covering pipe materials, installation techniques, testing protocols, and restoration standards are provided in the attached specifications document.

No estimated contract value, contract term, set-asides, preferences, incumbent contractor, evaluation criteria, or additional procurement timeline milestones are specified in the source material.

Opportunity text

Construction of approximately 3,130 of new 60 storm sewer to replace the existing 30 Little Wabash District Tile. Sewer construction will start at the existing 30 outlet to the Little Wabash River and will continue north, following the approximate alignment of the existing pipe, to the south side of IL-16 (Marshall Avenue). The project also includes; a cast-in-place concrete headwall, manholes, inlets, and site restoration.

Files

File Type Posted
city of Mattoon Wabash Drainage Specs Rev 031826.pdf PDF