Little River-Academy S. King's Trail Street Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- 2026-118
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- John Simcik jsimcik@kpaengineers.com (254) 773-3731
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Angelina County, Texas is requesting bids for street improvements on Academy S. King's Trail, with bids due July 14, 2026. The scope comprises four work items: 2,290 square yards of 6-inch moisture-conditioned subgrade with geogrid and 5.5-inch crushed limestone base material; 1,869 linear feet of 18-inch wide ribbon curb; 1,785 square yards of 4.5-inch crushed limestone base material with 1.5-inch HMAC Type D overlay; and 1,785 square yards of 4-inch topsoil and revegetation.
Prospective bidders must review the Bid Manual, which establishes specifications, bidding procedures, evaluation criteria, and administrative requirements including bid format, pricing structure, bonding, insurance, and contractor qualifications. The manual is the controlling document for all submission and award conditions.
Opportunity text
Bids are invited for several items and quantities of work as follows: 1. 2,290 SY of 6 Moisture Conditioned Subgrade, Geogrid, and 5.5 Crushed Limestone Base Material; 2. 1,869 LF of 18 Wide Ribbon Curb; 3. 1,785 SY of 4.5 Crushed Limestone Base Material and 1.5 HMAC Type D; 4. 1,785 SY of 4 Topsoil and Revegetation.
Files
| File | Type | Posted |
|---|---|---|
| Bid Manual.pdf.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity