The Long Branch Housing Authority is requesting bids on asbestos abatement and roof replacement at Kennedy Towers, with bids due October 29, 2026. Asbestos-containing materials are present in both the top and bottom layers of the existing roof and must be abated under New Jersey Department of Environmental Protection compliance and all applicable federal, state, and local regulations before roof installation proceeds.

The scope encompasses full roof abatement per Drawing HM-101, removal or relocation of building components obstructing access to abated materials, and all work necessary to complete abatement as described in the contract documents. The contractor is responsible for field verification of all quantities before bid submission; survey quantities are reference only. A Certified Project Monitor, provided by the owner under separate contract, will conduct visual inspections of abated areas upon completion and prior to installation of temporary window infill materials. The owner will provide power and water required for the project.

Contractors must examine existing site conditions and develop their own quantity take-offs; site visits are implicit in the responsibility to verify quantities independently. All asbestos abatement not previously identified but discoverable through inspection is to be included in the base bid unless obscured from view. The contractor bears full responsibility for careful review of contract documents, HM drawing set, and existing conditions in designated areas.

No contract value, term length, incumbent contractor, evaluation criteria, or additional timeline details appear in the source.

Opportunity text

SCOPE OF WORK A. Asbestos is present in numerous building materials on the subject roof. Care must be taken when planning for renovation work to ensure asbestos containing materials are only disturbed or removed under abatement conditions. See HM drawing set. a. Asbestos containing materials present on this project are as follows. i. Top Layer Roof Main Roof ii. Bottom Layer Roof Main Roof b. Asbestos Abatement Plan - See Drawing HM-101 i. Full Roof Abatement B. Power and Water required for the project shall be provided by the Owner if abatement occurs at the project location. C. Provide abatement in accordance with definitions and descriptions of NJ DEP and all other applicable Federal, State, and local rules, regulations, and guidelines. D. Project Monitoring Monitoring provided by owner consultant under separate contract. Based on the exterior abatement scope of work, a Certified Project Monitor is required to complete visual inspections of the abated areas upon completion and prior to installation of temporary window infill materials. E. It is the Abatement Contractor's responsibility to carefully review the Contract Documents in addition to carefully examining and inspection existing conditions in area(s) indicated for abatement. Contractors must visit the site and develop their own quantity take-offs. F. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL QUANTITIES BEFORE SUBMITTING BID. QUANTITIES IN SURVEY ARE FOR REFERENCE ONLY AND ARE INTENDED TO ASSIST THE CONTRACTOR IN UNDERSTANDING THE APPROXIMATE SCALE OF THE PROJECT. ALL ASBESTOS ABATEMENT IS TO BE INCLUDED IN THE BASE BID UNLESS OBSURED FROM VIEW AND NOT PREVIOUSLY IDENTIFIED. The contractor is also required to perform any and all work necessary to complete the asbestos abatement work as described including the removal/relocation of building components that may rest on asbestos flooring, obstruct access to materials to be abated or other efforts necessary to accomplish the described work. G. The handling and disposal of all asbestos waste, except as otherwise indicated, is the sole responsibility of the Abatement Contractor and shall be removed from the premises promptly as per regulation. H. Contractor shall coordinate their work and schedules with Owner, Project Monitoring Firm and other contractors.