Las Vegas Boulevard – Flamingo Road to Spring Mountain Road (Phase G) and Flamingo Road – I-15 to Koval Lane

Closed State & local contract opportunity Posted

Solicitation number
608087-26
State
Nevada
Responses due

Opportunity facts

Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Clark County is soliciting bids for construction improvements on Las Vegas Boulevard from Flamingo Road to Spring Mountain Road (Phase G) and on Flamingo Road from I-15 to Koval Lane, with bids due November 4, 2026 at 2:15 p.m. (PT) and a pre-bid webinar on October 21 at 10:00 a.m. (PT). Questions close October 28, 2026.

The Las Vegas Boulevard project spans approximately one mile and includes cold planing, plantmix bituminous surface, UTACS, pedestrian protection device installation, curb and gutter reconstruction, sidewalk work, median reconstruction, bus turnouts, street lighting with Smart poles, LED landscape lighting conversion, landscaping and irrigation modifications, traffic signal modifications at six intersections, utility adjustments, storm sewer facilities, pavement markings, signing, and power and communication system installation. The scope includes installation of a new waterline along the entire Las Vegas Boulevard project length to replace existing infrastructure for the Las Vegas Valley Water District.

The Flamingo Road improvements span approximately three-quarters of a mile and include curb and gutter work, ADA-compliant sidewalk replacement, traffic signal modifications with detector loop installation, utility adjustments, cold planing, plantmix bituminous surface, UTACS installation, storm drain installation, permanent striping and signing, and LED street lighting luminaires.

Required bid attachments include a bid bond, a 5% subcontractors list, a 1% designation of subcontractors, an affidavit pertaining to preference eligibility, a bidder's statement of authority to submit bid, and a disclosure of ownership. Bid documents total approximately 167.84 MB. Contact Scott Basquiat-Jones at (702) 455-4441 or scott.jones@clarkcountynv.gov for questions. Bids will close via webex on November 4, 2026.

Opportunity text

The work will generally consist of improvements on Las Vegas Boulevard from Flamingo Road to Spring Mountain Road for a length of approximately one mile. The project includes cold planing, plantmix bituminous surface, UTACS, pedestrian protection device installation, curb and gutter reconstruction, sidewalk, sidewalk reconstruction/widening, sidewalk ramps, median reconstruction, bus turnouts, street lights and Smart poles, LED landscape lighting conversion, landscaping/irrigation modifications, traffic signal modifications at 6 intersections, utility adjustments, storm sewer facilities, pavement markings, signing, power and communication system installation and connection to new Smart poles. The work also includes a installation of a new waterline for the entire project length along Las Vegas Boulevard to replace an existing waterline for the Las Vegas Valley Water District. The Work also includes improvements to Flamingo Road from I-15 to Koval Lane, for a length of approximately three quarters of a mile. The Work will generally consist of improvements including curb and gutter, removing and replacing damaged sidewalk for Americans with Disabilities Act (ADA) current standards, traffic signal modifications including detector loop installation, utility adjustments, cold planing, plantmix bituminous surface, UTACS, storm drain installation, permanent striping and signing, and street lighting LED luminaires.

Files

File Type Posted
Bid Notice.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors