About this opportunity
The City of Mesquite, located in Dallas County, Texas, is soliciting bids (RFB 2025-186) for a comprehensive infrastructure improvement project on La Prada Drive, covering 1.68 miles from Motley Drive to Pinehurst Lane. The procurement involves extensive roadway and utility infrastructure construction, including 60,000 square yards of 10"-11" thick concrete pavement, 5,500 square yards of concrete trail, 4,500 square yards of concrete sidewalk, and 5,000 square yards of concrete driveway. Additional project elements include traffic signal improvements at three intersections, approximately 9,300 linear feet of drainage infrastructure (RCP and concrete box culverts), 15,600 linear feet of water lines (6"-30"), 2,500 linear feet of 8" gravity sanitary sewer, 1,000 linear feet of 4" force main sanitary sewer, and lift station reconstruction. The project is scheduled to begin in January 2026 with substantial completion targeted for December 2027, spanning approximately 700 calendar days. Key procurement dates include a pre-bid conference on October 14, 2025, bid opening on October 29, 2025, and anticipated contract award on December 1, 2025. Bidders are required to submit a 5% bid bond or cashier's check and will be evaluated based on lowest responsible bidder criteria.
The City encourages participation from Disadvantaged Business Enterprises (DBEs) and recognizes certifications from the State of Texas HUB Program and North Central Texas Regional Certification Agency. Successful bidders must provide performance and payment bonds each at 100% of the contract price, with liquidated damages of $1,000 per day for delays beyond the project timeline. The project will be funded through the City of Mesquite's public works budget, with an estimated total investment reflecting the comprehensive infrastructure improvements. Bidders must submit detailed qualification documentation, including financial statements, subcontractor lists, and compliance documents such as a Conflict of Interest Questionnaire and Certificate of Interested Parties. The geotechnical report indicates soil stabilization requirements, including a minimum of 8% hydrated lime and specific pavement design considerations to address local soil conditions. The project is designed for a 50-year performance period and incorporates engineering standards from TxDOT and local municipal guidelines, indicating a significant long-term infrastructure investment for the community.
Opportunity text
As set forth in the plans and specifications, the 1.68 mile project on La Prada Drive is to construct approximately 60,000 square yards of 10" and 11" thick concrete pavement over flexible base subgrade, 5,500 square yards of concrete trail, 4,500 square yards of concrete sidewalk, and 5,000 square yards of concrete driveway. The project includes traffic signal improvements at three intersections, approximately 9,300 linear feet of various size drainage RCP and concrete box culverts, 15,600 linear feet of 6" to 30" water line, 2,500 linear feet of 8" gravity sanitary sewer,1,000 linear feet of 4" force main sanitary sewer, and lift station reconstruction.