Joiner Road Water Treatment Plant - New Treatment Facility Well No. 4

Closed State & local contract opportunity Posted

Solicitation number
PE-75052-NONST-2025-000000001
State
Georgia
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 44

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The procurement opportunity is for the construction of a new water treatment facility well, Well No. 4, at the Joiner Road Water Treatment Plant in Tennille, Georgia, which is located in Wilcox County. The work to be performed includes site demolition, site improvements, a new filtration system and housing structure, modifications to the existing chemical building, yard and connecting piping, a new vertical turbine backwash pump, chemical feed equipment, a SCADA upgrade, an electrical standby emergency generator, and new electrical equipment. The project is being procured by the City of Tennille and is funded through a Community Development Block Grant and funds from the Georgia Environmental Finance Authority (GEFA) through the Small & Disadvantaged Communities Funding and the Emerging Contaminants Funding. Sealed bids will be received until October 16, 2024, at 3:00 pm local time. Bidding documents can be obtained from the engineer, Ingram & Associates Consulting Engineers, L.L.C., for a non-refundable fee.

This is a Section 3 Covered Project under the HUD Act of 1968, and Section 3 Residents and Business Concerns are encouraged to apply. The total budget and funding sources are not specified in the provided documents. There are no details on pricing terms, set asides, incumbents, or the current competitive environment. All requirements related to the funding sources shall apply, and the City of Tennille reserves the right to reject any or all bids.

Opportunity text

The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the project titled Joiner Road Water Treatment Plant -New Treatment Facility Well No 4 as shown on the construction drawings. The major components of construction include site demolition, site improvements, a new filtration system and housing structure, existing chemical building modifications, yard and connecting piping, a new vertical turbine backwash pump, chemical feed equipment, SCADA upgrade, electrical standby emergency generator and new electrical equipment. This is a Section 3 Covered Project under the HUD Act of 1968 and Section 3 Residents and Business Concerns are encouraged to apply.

Files

File Type Posted
Addendum 3.pdf PDF
Bid Ad Tennille Revised to include Section 3.docx DOCX document
Bid Ad Tennille Revised to include Section 3.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors