Addendum 3.pdf

PDF 70 KB Posted

Attached to
Joiner Road Water Treatment Plant - New Treatment Facility Well No. 4
Solicitation number
PE-75052-NONST-2025-000000001
Issued by
Wilcox County, Georgia

About this file

This document is an Addendum No. 3 to the plans, specifications, and contract documents for the Joiner Road Water Treatment Plant - New Treatment Facility Well No. 4 project. The project is located in the City of Tennille, Georgia, which is in Wilcox County. The work to be performed includes site demolition, site improvements, a new filtration system and housing structure, modifications to the existing chemical building, yard and connecting piping, a new vertical turbine backwash pump, chemical feed equipment, a SCADA upgrade, an electrical standby emergency generator, and new electrical equipment. The bid due date has been revised to October 16, 2024, at 3:00 pm. This is a Section 3 Covered Project under the HUD Act of 1968, and Section 3 Residents and Business Concerns are encouraged to apply.

The project is funded by the City of Tennille and is part of their water treatment plant improvements. The total budget and funding sources are not specified in the provided documents. There are no details on pricing terms, set asides, incumbents, or the current competitive environment.

View the file

Other files

File Type Posted
Bid Ad Tennille Revised to include Section 3.docx DOCX document
Bid Ad Tennille Revised to include Section 3.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 3

PLANS, SPECIFICATIONS, AND CONTRACT DOCUMENTS

October 3, 2024

PROJECT: Joiner Road Water Treatment Plant

New Treatment Facility Well No 4

I&A Project No.: 2020-005-01

OWNER: City of Tennille, Georgia

BID DATE: October 16, 2024 @ 3:00 pm

Item 1: REVISION OF BID DATE: bids for “Joiner Road Water Treatment Plant” will be received until October 16, 2024, at 3:00 pm.

END ADDENDUM NO. 3

File details come from the government source that posted it. Updated .