Johnson AVE stormwater & streetscape
Closed State & local contract opportunity Posted
- Solicitation number
- PE-62250-NONST-2027-000000015
- State
- Georgia
- Responses due
Opportunity facts
- UNSPSC codes
- Point of contact
-
- Dalton Appleby dappleby@carrollton-ga.gov (770) 830-2000
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Carrollton, Georgia is requesting sealed bids for the Johnson Avenue Stormwater & Streetscape Project, with proposals due August 11, 2026 at 10:00 a.m. and a pre-bid conference scheduled for July 28, 2026 at 10:00 a.m. at Carrollton City Hall. The City reserves the right to reject any contractor without previous experience on projects of similar nature and complexity.
The scope encompasses reconstruction of Johnson Avenue from Rome Street to Barnes Avenue and Barnes Avenue north approximately 250 feet, including installation of new 18"–60" storm sewer piping and drainage structures; new 8" sanitary sewer main piping and manholes; new 8" and 12" water mains; utility service reconnections and relocations; demolition and saw-cutting of existing pavement; milling and overlay; full-depth pavement and curb-and-gutter installation; new sidewalks; retaining wall installation; re-striping and re-signing; traffic control; and erosion control (installation, maintenance, and removal). The contractor must coordinate all utility relocations and lane/road/parking lot closures with the City Engineer and maintain ongoing communication with project stakeholders. Partial and full closures of roads and adjacent parking lots are anticipated during construction phases but must be minimized.
Proposals will be evaluated on total bid price (50% weight) and quality of work and references (50% weight), with scoring of 1 to 10 per criterion; the contractor with the highest total score will be selected. All bids must be submitted in triplicate with a bid bond equal to five percent of the bid amount, issued by a Georgia-licensed surety company listed in U.S. Treasury Circular 570, or alternatively a letter of credit or bank-guaranteed check from a local bank. The successful bidder must furnish Performance and Payment Bonds each equal to 100 percent of the bid amount. Contract documents are available from Dalton Appleby at dappleby@carrollton-ga.gov or 770-830-2000.
Opportunity text
The project consists of reconstructing Johnson Avenue and associated utilities from Rome Street to Barnes Avenue and on Barnes Avenue from Johnson Avenue north approximately 250 feet. The project will include installation of new 18''-60'' storm sewer piping and drainage structures; new 8'' sanitary sewer main piping and manholes; new 8'' and 12'' water mains; reconnecting sanitary sewer and water services; relocation of existing utilities where necessary; saw-cutting and demolition of existing road and parking lots; milling and overlay portions of existing road; new full-depth pavement and curb and gutter for road and parking lots; new sidewalks; installation of a retaining wall; re-striping and re-signing roadway and parking lots; traffic control; erosion control (installation, maintenance, and removal); and permanent stabilization. The Contractor is expected to coordinate utility relocations with the City Engineer and Utility Owner(s). The City of Carrollton anticipates that the roads and adjacent parking lots will be partially and fully closed during certain phases of construction, but closure of the roads and parking lots will need to be kept to a minimum. The Contractor is expected to coordinate all lane/road/parking lot closures necessary throughout construction with the City Engineer. The Contractor will be required to maintain good communication and coordination with the Project Engineer and the City Engineer throughout construction of the project.