John Glenn HS Flagpole Project

Closed State & local contract opportunity Posted

Solicitation number
202627-4 (Formal)
State
California
Responses due

Opportunity facts

Points of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Norwalk-La Mirada Unified School District is requesting sealed bids for the John Glenn High School Flagpole Project (Bid No. 202627-4), with bids due October 1, 2026 at 10:00 a.m. The project is subject to a 3% Disabled Veteran Business Enterprise (DVBE) participation goal and California prevailing wage requirements under Labor Code sections 1720 et seq., with Davis Bacon Act wages applying if federal funding is involved. A pre-bid job walk is scheduled for September 9, 2026 at 10:00 a.m. at John Glenn High School, 13520 Shoemaker Avenue, Norwalk, California.

The scope includes installation of a 50-foot flagpole, concrete paving around the flagpole, modifications and reconstruction of existing 6-foot chain link fencing, modifications to existing irrigation systems, and installation of artificial turf. All contractors and subcontractors must be registered with the California Department of Industrial Relations and qualified to perform public works. The successful bidder must hold a valid California Class B contractor's license.

Bid security equal to 10% of the bid amount must accompany each proposal as cash, cashier's check, certified check, or bid bond issued by a California-admitted surety. The awardee must provide separate performance and payment bonds, each in an amount equal to 100% of the total contract amount, within five calendar days of award. Bidders may not withdraw bids for 90 calendar days following the bid opening. Sealed bids are submitted to the District's Purchasing Department at 12820 Pioneer Blvd., Norwalk, California 90650. The District reserves the right to award the contract to the lowest responsive responsible bidder and may reject any or all bids. Bidding documents are available through ARC Document Solutions.

Opportunity text

This project consists of, but is not limited to, the installation of a 50 flag pole, installation of concrete paving around flag pole, modifications and reconstruction of existing 6 H chain link fencing, modifications to existing irrigation, and installation of artificial turf.

Files

File Type Posted
John Glenn HS Flagpole Project.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity