JD Cope MV/LV Switchgear
Closed State & local contract opportunity Posted
- Solicitation number
- PE-75553-NONST-2027-000000062
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 39121335 Telephone termination cabinet
- 71121649 Conductor service
- 39121700 Electrical hardware and supplies
- 26131808 Substation load control switchgears
- 26131811 Current limiting reactors
- 26131812 Gas insulated switchgears
- 39121115 Medium voltage switchgear
- 39121647 Electrostatic discharger
- 39121648 Earth additive
- 39121000 Power conditioning equipment
- Point of contact
-
- David Keaton dkeaton@dutil.com (706) 529-1025
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Dalton Utilities is soliciting bids for the design, fabrication, and delivery of medium-voltage and low-voltage arc-resistant switchgear lineups for the J.D. Cope Energy Facility, a 55.6 MW reciprocating-engine generation facility in Whitfield County, Georgia, with bids due September 11, 2026 and projected award on September 16, 2026.
The scope encompasses one 13.8 kV arc-resistant medium-voltage switchgear lineup and one 480 V arc-resistant low-voltage switchgear lineup, along with engineering submittals, manufacturer field services, spare parts, special tools, and associated documentation. Equipment must be designed for a 30-year service life in an indoor, climate-controlled environment at 101 Looper Bridge Road SE, Chatsworth, Georgia 30705. Suppliers must provide comprehensive pricing for equipment fabrication, manufacturer field services (with separate unit rates for regular time and premium time, including all expenses), special tools, and consumables. Spare parts must remain available for purchase by the Owner for two years following Substantial Completion.
Materials must originate from acceptable countries of origin, excluding China and India; pre-approved sources for structural steel, electrical wire and cable, pressure-retaining steel, pipe, castings, forgings, and welding materials are limited to North America and Western Europe. All equipment must comply with OSHA, NEC, NFPA, ASME, ASTM, and IEEE standards. Detailed submittal requirements include shop drawings, product data, equipment datasheets, operation and maintenance manuals, spare parts lists, quality control documentation, and three-dimensional model files on specified timelines. A preliminary virtual conference will be held within 20 days of the Effective Date, followed by bi-weekly engineering coordination meetings.
Dalton Utilities reserves the right to award to the vendor offering the best overall value rather than the lowest bidder. The planned delivery date is November 26, 2027.
Opportunity text
Dalton Utilities is soliciting bids for the design, fabrication, and delivery of electrical equipment for the J.D. Cope Energy Facility, a new 55.6 MW reciprocating-engine generation facility in Whitfield County, Georgia. The scope includes one 13.8 kV arc-resistant medium-voltage switchgear lineup and one 480 V arc-resistant low-voltage switchgear lineup, along with required engineering submittals, manufacturer field services, spare parts, special tools, and associated documentation. Please review the attachment for detailed specifications. The projected award date is September 16th, 2026, with a planned delivery date of November 26th, 2027. The Owner reserves the right to award the project to the Vendor whose bid is determined to be the best overall value for the Owner. This does not guarantee the award of the project to the lowest bidder.
Files
| File | Type | Posted |
|---|---|---|
| 197347_5_5310 Combined.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity