ITB - US30 Clatskanie River Bridge Project (Scour Protection Installation)

Closed State & local contract opportunity Posted

Solicitation number
S-73000-00007630
State
Oregon
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from oregonbuys.gov. Updated .

About this opportunity

The Oregon Department of Transportation (ODOT) is seeking a qualified contractor to install scour protection on the Clatskanie River Bridge located in Columbia County through an Invitation to Bid (ITB). The project requires comprehensive construction services, including temporary traffic control, erosion and sediment control, staging area construction, riprap mitigation at bridge piers, and associated incidental work. Key deliverables include installing sediment barriers, implementing traffic management plans, and completing in-water construction within a restricted timeframe of July 15 to September 15. Bidders must submit proposals through the OregonBuys eProcurement system by October 4, 2023, with substantial project completion required by October 1, 2024, and final completion by October 31, 2024. The contract will be awarded to the most responsive, responsible bidder submitting the lowest bid, with prevailing wage rates set by the Bureau of Labor and Industries (BOLI) applicable to the project. Contractors must comply with detailed environmental protection measures, including turbidity monitoring, fish protection, and specific requirements for floating structures and treated wood.

The procurement does not explicitly indicate any set-aside designations or restrictions for disadvantaged business enterprises. The project is funded through a combination of state and federal sources, which requires compliance with federal Buy America and Build America Buy America provisions. Bidders must be prepared to meet comprehensive federal and state contracting requirements, including providing various technical submittals such as Temporary Water Management Plan and Work Containment Plan. While the exact budget is not specified, the bid tabulation document reveals bid amounts ranging from $295,025 to $1,083,813, suggesting a project budget within this range. No incumbent vendors are mentioned, and the contract appears to be a new procurement for scour protection installation. The project requires technical expertise in bridge construction, environmental protection, and in-water work management, with a focus on protecting the Clatskanie River's ecological environment during bridge infrastructure improvements.

Opportunity text

ODOT is seeking one qualified contractor to install scour protection on the Clatskanie River Bridge in Columbia County.

Files

File Type Posted
00007360_Att B_Special Provisions.docx DOCX document
00007360_ITB.docx DOCX document
Bid tabulation~10.xlsx XLSX spreadsheet
00007360_Att A_Plans.pdf PDF
00007360_Att C_Bid Pricing Form.xlsx XLSX spreadsheet
SOLE SOURCE PUBLIC NOTICE Goble Sampson.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity