ITB-FAF-FY27_263-CP25006-5 SCVMC Bldg. K NPC 4, Bldg. M NPC 4 and NPC 5 Underground Storage Tank project

Open State & local contract opportunity Posted

Solicitation number
ITB-FAF-FY27_263-CP25006-5
State
California
Responses due

Opportunity facts

Jurisdictions

Opportunity details come from biddingousa.com. Updated .

About this opportunity

Santa Clara County is soliciting sealed bids through Invitation to Bid ITB-FAF-FY27_263-CP25006-5 for the SCVMC Building K NPC 4, Building M NPC 4 and NPC 5 Underground Storage Tank project, with bids due December 17, 2026 before 2:00 p.m. The County of Santa Clara Clerk of the Board of Supervisors receives bids at 10th Floor, East Wing, County Government Center, 70 West Hedding Street, San Jose, California 95110. Bids must be in the Clerk's possession by the deadline, and the source warns that an incomplete address may cause a bid not to be received.

The Building K scope includes architectural modifications for a structural upgrade and upgrades to fire sprinkler bracing with end-of-line restraints, including items cited as deficiencies in SRU-2023-0256. The building remains fully occupied during construction, so the contractor must mitigate impacts on occupants according to a phasing plan. The contractor must provide all labor, equipment, and materials for a complete, properly operating, and safe building, with the work defined by the Drawings, Project Manual, and approved addenda. The project also includes underground storage tank work at Buildings M and PS1. Work is performed at 751 South Bascom Avenue, San Jose, California 95128, at Buildings K, M, and PS1, which are part of the Santa Clara Valley Medical Center campus.

Opportunity text

NOTICE IS HEREBY GIVEN that sealed Bids will be accepted by the Clerk of the Board of Supervisors of the County of Santa Clara, State of California, in the office of the Clerk of the Board of Supervisors, 10th Floor, East Wing of the County Government Center, 70 West Hedding Street, San Jose, CA, 95110 before 2:00 PM, on December 17, 2026 for SCVMC Bldg. K NPC 4, Bldg. M NPC 4 and NPC 5 Underground Storage Tank, Project No. 263-CP25006-5, located at 751 S Bascom Avenue, San Jose, CA 95128, Bldg. K, Bldg. M and PS1, in accordance with Bid Documents on file for the Work in the Office of the Clerk of the Board of Supervisors. Failure to specify the exact address may result in the Clerk of the Board of Supervisors not receiving the bid or not receiving the bid by the deadline. All bids must be in the possession of the Clerk of the Board of Supervisors by the specified deadline. 1.02 THE WORK .A The Work will consist of: SCVMC Bldg. K NPC 4 Upgrade: Work under this contract includes the scope of work as described in the Drawings and Project Manual including but not limited to: 1. Architectural modifications as required for structural upgrade 2. Upgrading the fire sprinkler bracing to have end of line restraints and additional items noted as deficiency in SRU-2023-0256. 3. The entire building will be occupied during construction, which will require measures to mitigate impacts upon those occupants. Refer to Phasing Plan provided to identify the rooms or areas that will be occupied during construction. 4. The work specifically includes all Work as represented by the Drawings and Project Manual issued for construction and subsequent approved revisions and addenda 5. Provide all labor, equipment, and materials required to provide a complete, properly operating and safe building. The extent of the Work, as indicated on the Drawings and as prescribed in the Specifications, shall include all that may be reasonably inferred to be required for proper execution or installation of Work and for complete systems. 6. The Drawings shall be recognized as diagrammatic in nature and not completely descriptive of all requirements for construction. Whatever Work that may be specified and not drawn or drawn and not specified shall be executed as fully as if described in both these ways. Should any workmanship or material be necessary that is not either directly or indirectly noted in these Specifications or shown on the Drawings but is nevertheless necessary for properly carrying out the obvious intention thereof, Contractor shall understand it to be implied and shall provide for the same as fully as if it were particularly described or delineated. If certain features are not fully shown or called for in the Drawings, their construction shall be of the same character, quality and level of performance as for similar conditions that are shown, called for, or reasonably inferred. 7. Architectural modifications as required for structural upgrade. SCVMC Bldg. M NPC 4 Partial Upgrade: Work under this contract includes the scope of work as described in the Drawings and Project Manual including but not limited to: 1. Architectural modifications as required for structural upgrade. 2. Installation of fire sprinkler end of line restraints and anchor minor non-compliant equipment such as shelving and refrigerators. 3. Verification and documentation of the existing fire sprinkler system. 4. Below is the Building M NPC 4 Seismic Compliance Deficiency Summary (see attachment) 5. The entire building will be occupied during construction, which will require measures to mitigate impacts upon those occupants. Refer to Phasing Plan provided to identify the rooms or areas that will be occupied during construction. 6. The work specifically includes all Work as represented by the Drawings and Project Manual issued for construction and subsequent approved revisions and addenda 7. Provide all labor, equipment, and materials required to provide a complete, properly operating and safe building. The extent of the Work, as indicated on the Drawings and as prescribed in the Specifications, shall include all that may be reasonably inferred to be required for proper execution or installation of Work and for complete systems. 8. The Drawings shall be recognized as diagrammatic in nature and not completely descriptive of all requirements for construction. Whatever Work that may be specified and not drawn or drawn and not specified shall be executed as fully as if described in both these ways. Should any workmanship or material be necessary that is not either directly or indirectly noted in these Specifications or shown on the Drawings but is nevertheless necessary for properly carrying out the obvious intention thereof, Contractor shall understand it to be implied and shall provide for the same as fully as if it were particularly described or delineated. If certain features are not fully shown or called for in the Drawings, their construction shall be of the same character, quality and level of performance as for similar conditions that are shown, called for, or reasonably inferred. SCVMC NPC 5 Underground Storage Tank: Work under this contract includes the scope of work as described in the Drawings and Project Manual including but not limited to: 1. Installation of emergency sewer sanitary storage tanks for all acute buildings in SCVMC for Campus Wide NPC 5 Partial Upgrade. 2. Update accessible path of travel and parking lot at Bldg. E main entrance and providing site improvement for Bldg. E outdoor staff/visitor seating area. 3. Design storm water management (Bio-Retention) approach to cover all site improvements. 4. The buildings will be occupied during construction, which will require measures to mitigate impacts upon those occupants. Refer to Phasing Plan provided to identify the rooms or areas that will be occupied during construction 5. The work specifically includes all Work as represented by the Drawings and Project Manual issued for construction and subsequent approved revisions and addenda 6. Provide all labor, equipment, and materials required to provide a complete, properly operating and safe building. The extent of the Work, as indicated on the Drawings and as prescribed in the Specifications, shall include all that may be reasonably inferred to be required for proper execution or installation of Work and for complete systems. 7. The Drawings shall be recognized as diagrammatic in nature and not completely descriptive of all requirements for construction. Whatever Work that may be specified and not drawn or drawn and not specified shall be executed as fully as if described in both these ways. Should any workmanship or material be necessary that is not either directly or indirectly noted in these Specifications or shown on the Drawings but is nevertheless necessary for properly carrying out the obvious intention thereof, Contractor shall understand it to be implied and shall provide for the same as fully as if it were particularly described or delineated. If certain features are not fully shown or called for in the Drawings, their construction shall be of the same character, quality and level of performance as for similar conditions that are shown, called for, or reasonably inferred.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors