The County of Santa Clara is soliciting sealed bids through its Clerk of the Board of Supervisors under ITB-FAF-FY27_263-CP25006-4 for the SCVMC Building E NPC 4 Renovation and SPC 4D Upgrades project (Project No. 263-CP25006-4), with bids due December 17, 2026 before 2:00 p.m. Posted November 9, 2026, the solicitation covers construction work at Santa Clara Valley Medical Center's Building E, located at 751 S Bascom Avenue, San Jose, California.
The scope includes accessibility upgrades to the existing drop-off area and building entrance, renovation of the first-floor main entrance lobby, and interior renovation of portions of the basement and second floor for new offices and a sleep clinic. Renovation also extends to the medical library, public restrooms, corridors, stairs, and elevator lobby. Exterior work includes facade improvements with replacement of existing openings and elastomeric coating. Portions of the building remain occupied during construction, so the contractor must mitigate impacts on those occupants in accordance with the Phasing Plan. The contractor must provide all labor, equipment, and materials, per the Drawings and Project Manual, including subsequent approved revisions and addenda.
Bidders must deliver sealed bids to the Clerk's office, 10th Floor, East Wing, County Government Center, 70 West Hedding Street, San Jose, CA 95110. The county warns that failure to specify the exact address may result in the bid not being received, and all bids must be in the Clerk's possession by the deadline. The notice lists Santa Clara County and San Diego City as jurisdictions.
Opportunity text
NOTICE IS HEREBY GIVEN that sealed Bids will be accepted by the Clerk of the Board of Supervisors of the County of Santa Clara, State of California, in the office of the Clerk of the Board of Supervisors, 10th Floor, East Wing of the County Government Center, 70 West Hedding Street, San Jose, CA, 95110 before 2:00 PM, on December 17, 2026 for SCVMC Bldg. E NPC 4/Renovation and SPC 4D Upgrades, Project No. 263-CP25006-4, located at 751 S Bascom Avenue, San Jose, CA 95128, Bldg. E, in accordance with Bid Documents on file for the Work in the Office of the Clerk of the Board of Supervisors. Failure to specify the exact address may result in the Clerk of the Board of Supervisors not receiving the bid or not receiving the bid by the deadline. All bids must be in the possession of the Clerk of the Board of Supervisors by the specified deadline. 1.02 THE WORK .A The Work will consist of: SCVMC Bldg. E NPC 4 Upgrade and Renovation: Work under this contract includes the scope of work as described in the Drawings and Project Manual including but not limited to: 1. Accessibility upgrades to the existing drop-off area and building entrance, and renovation of First Floor main entrance lobby. 2. Interior renovation of portions of the basement and second floor of the client's Bldg. E for the provision of new offices and sleep clinic, as well as renovation of the medical library, public restrooms, corridors, stairs and elevator lobby. 3. Exterior façade improvements, including replacement of existing openings and provision of elastomeric coating. 4. Portions of the building will be occupied during construction, which will require measures to mitigate impacts upon those occupants. Refer to Phasing Plan provided to identify the rooms or areas that will be occupied during construction. 5. The work specifically includes all Work as represented by the Drawings and Project Manual issued for construction and subsequent approved revisions and addenda 6. Provide all labor, equipment, and materials required to provide a complete, properly operating and safe building. The extent of the Work, as indicated on the Drawings and as prescribed in the Specifications, shall include all that may be reasonably inferred to be required for proper execution or installation of Work and for complete systems. 7. The Drawings shall be recognized as diagrammatic in nature and not completely descriptive of all requirements for construction. Whatever Work that may be specified and not drawn or drawn and not specified shall be executed as fully as if described in both these ways. Should any workmanship or material be necessary, that is not either directly or indirectly noted in these Specifications or shown on the Drawings but is nevertheless necessary for properly carrying out the obvious intention thereof. Contractor shall understand it to be applied and provide for the same as fully as if it were particularly described or delineated. If certain features are not fully shown or called for on the Drawings their construction shall be of the same character, quality and level of performance as for similar conditions that are shown, called for, or reasonably inferred. SCVMC Bldg. E SPC 4D Upgrade: 1. Architectural modifications as required for structural upgrade. 2. Works include the following: Exterior/interior shotcrete, exterior FRP installation, installation of new guardrails at the roof, installation of new metal fence at the second-floor patio, replacement of slab on grade in the basement, exterior window replacements, replacement of exterior concrete sunshade in the third floor, installation of structural steel additional support. 3. Works require phasing plan coordinating with the NPC 4 Upgrade and renovation scope of work. 4. Portions of the building will be occupied during construction, which will require measures to mitigate impacts upon those occupants. 5. The work specifically includes all Work as represented by the Drawings and Project Manual issued for construction and subsequent approved revisions and addenda 6. Provide all labor, equipment, and materials required to provide a complete, properly operating and safe building. The extent of the Work, as indicated on the Drawings and as prescribed in the Specifications, shall include all that may be reasonably inferred to be required for proper execution or installation of Work and for complete systems. 7. The Drawings shall be recognized as diagrammatic in nature and not completely descriptive of all requirements for construction. Whatever Work that may be specified and not drawn or drawn and not specified shall be executed as fully as if described in both these ways. Should any workmanship or material be necessary that is not either directly or indirectly noted in these Specifications or shown on the Drawings but is nevertheless necessary for properly carrying out the obvious intention thereof, Contractor shall understand it to be implied and shall provide for the same as fully as if it were particularly described or delineated. If certain features are not fully shown or called for in the Drawings, their construction shall be of the same character, quality and level of performance as for similar conditions that are shown, called for, or reasonably inferred.