About this opportunity
El Paso County and El Paso City, Texas are soliciting bids for international bridges rehabilitation at three locations (1001 S. Stanton, 1000 S. El Paso Street, and 791 S. Zaragoza), with bids due August 5, 2026.
The scope encompasses bridge maintenance and structural repairs across four to six phases per bridge under a single prime contract. Work includes removal of miscellaneous concrete; application of penetrating concrete surface treatment; structural concrete repairs using epoxy mortar and vertical and overhead repair techniques; discrete concrete crack repairs by epoxy injection and rout-and-seal methods; cleaning and sealing of existing joints (Class 3 and Class 7) and transverse and expansion center joints; replacement of armored bridge joints; replacement of W-beam rail elements and Thrie-beam to W-beam transitions; repair of steel posts with base plates and steel pedestrian railings; replacement of luminaires with 250-watt equivalent LED fixtures; replacement of above-ground conduit; and installation and removal of construction exits (Type 1), temporary sediment control fencing, 12-inch biodegradable erosion control logs, barricades, signs, and portable changeable message signs for traffic control.
The Contractor must provide a full-time project superintendent and comply with submittal, quality control, and testing and inspection procedures. Payment is based on unit prices in the bid schedule, measured by square yard for sidewalk removal, square foot for concrete surface treatment and structural repair, and other appropriate units for remaining items. Force account work for extra items carries established markup percentages: 25% overhead for labor, 55% of labor cost for insurance and taxes, 25% overhead for materials, 15% overhead for equipment, and 5% administrative cost for subcontracting. No retainage is withheld on the prime contractor. CONSOR Engineers, LLC serves as the Owner's Representative with Civil Engineer Ricardo A. Prieto, P.E. providing design coordination.
Opportunity text
The project consists of performing bridge maintenance, structural repairs, joint rehabilitation, rail repairs, lighting improvements, and associated traffic control and environmental protection measures. Work includes removal of miscellaneous concrete; application of penetrating concrete surface treatment; and structural concrete repairs using epoxy mortar, standard repair methods, and vertical and overhead repair techniques. The project also includes discrete concrete crack repairs by epoxy injection and by rout-and-seal methods. Joint work includes cleaning and sealing of existing joints (Class 3 and Class 7), cleaning and sealing of transverse center joints and expansion center joints, and replacement of armored bridge joints. Additional improvements include replacement of W-beam rail elements and Thrie-beam to W-beam transitions; repair of steel posts with base plates and steel pedestrian railings; replacement of luminaires with 250-watt equivalent LED fixtures; and replacement of above-ground conduit. Site work includes installation and removal of construction exits (Type 1), installation and removal of temporary sediment control fencing, installation and removal of 12-inch biodegradable erosion control logs, and implementation of barricades, signs, and traffic handling measures. The project also includes use of portable changeable message signs during daytime operation
Files
| File | Type | Posted |
|---|---|---|
| 2026-0349 Specifications.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity