Intent to Single Source for Flexim Clamps

Closed State & local contract opportunity

Solicitation number
26-X-01008
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of Tampa, Florida, on behalf of the David L. Tippin Water Treatment Facility located in Hillsborough County, has issued an Intent to Single Source procurement for Flexim Clamps on March 26, 2026, with a response deadline of April 1, 2026. This procurement seeks genuine Emerson-Flexim Clamp-On flow measuring devices designed for point-to-point flow measurement between connection points throughout the water treatment facility. The deliverable consists of authentic Emerson-Flexim parts and meters required to ensure safe and reliable operation of the facility's flow measurement equipment. Prospective vendors must be authorized representatives of Emerson-Flexim and must submit documentation verifying their authorized vendor status through the City of Tampa's online supplier portal at https://procurement.opengov.com/portal/cityoftampa. Interested parties should contact Eryn Berg, Certified Procurement Analyst, at the Water Department, 2555 E Hanna Avenue, Tampa, Florida 33610, or by telephone at (813) 274-8832 for additional information. The evaluation criteria emphasize vendor authorization status and the ability to provide genuine Emerson-Flexim products to maintain equipment integrity and operational safety.

CL2 Solutions has been identified as the sole municipality representative for Emerson-Flexim in the state of Florida for parts and meters, making the company the primary candidate for this single-source award. The single-source procurement designation indicates that competitive bidding will not be conducted, streamlining the procurement process by limiting eligible respondents to authorized Emerson-Flexim distributors. No specific set-aside designations for disadvantaged enterprises are noted in the procurement documentation. The contract involves integration with existing Emerson-Flexim flow measuring infrastructure already installed at the David L. Tippin Water Treatment Facility, requiring compatibility with established equipment systems. While no explicit budget range or award value is specified in the available documentation, the procurement is limited to genuine Emerson-Flexim replacement parts and meters necessary for facility operations.

Opportunity text

The David L.Tippin Water Treatment Facility utilizes Emerson-Flexim Clamp-On flow measuring devices for point to point measuring of flow between connection points. To ensure the safe and reliable operation of the Emerson-Flexim equipment only genuine Emerson-Flexim parts should be utilized. CL2 Solutions is sole municipality representative for Emerson-Flexim in the state of Floridafor parts and meters.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity