Installing Lagging Boards to the existing Guardrail posts
Closed State & local contract opportunity Posted
- Solicitation number
- 64V16
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- IDOT Contracts Office dot.de-contracts@illinois.gov (217) 782-7806
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Illinois Department of Transportation is soliciting bids for installing treated timber lagging boards to existing guardrail posts on E. Canyon Road in Jo Daviess County, with electronic bids due July 31, 2026 at 12:00 p.m. via the iCX-Integrated Contractors Exchange system. This is an interim repair project funded through District 2 Construction Funds and is subject to federal-aid provisions under 49 CFR Part 26; the DBE participation goal is 0.00 percent, and bidders must submit a DBE Utilization Plan and applicable DBE Participation Statements demonstrating either achievement of the goal or good faith efforts to meet it.
The work is located on E. Canyon Road approximately 0.5 miles west of Fiedler Road in Section 3, Range 4E, Township 28N, Jo Daviess County, District 2. The scope includes installing treated timber lagging, treated timber lagging special with permanent formwork for Portland Cement Concrete filling of eroded surfaces and gaps in the existing stone retaining wall, biaxial geogrid geotechnical reinforcement, and associated traffic control measures. The purpose is to prevent water sheet flow over the retaining wall and slow progression of failure. The existing guardrail will remain in place.
Traffic control requirements mandate that the mainline remain open to one-way traffic during working hours and two-way traffic during non-working hours, with all lanes required to be open from 3:00 p.m. Friday until 7:00 a.m. Monday unless otherwise approved by the Resident Engineer. The contract will be awarded to the lowest responsive and responsible bidder in conformity with IDOT terms and conditions. Contract documents incorporate the Standard Specifications for Road and Bridge Construction (adopted and revised January 1, 2022 and 2026) and the Manual on Uniform Traffic Control Devices, with supplemental specifications and special provisions addressing traffic control, timber lagging installation, concrete work, admixtures, and compensable delay costs.
Opportunity text
The proposed scope of work is considered an interim repair only and includes installing lagging boards to the existing guardrail posts to prevent water from sheet flowing over the retaining wall and slow down the progression of failure. The existing guardrail along the wall will remain. Location: The work on this project is located on E. Canyon Road in Jo Daviess County in Section 3, Range 4E and Township 28N. The project is along E. Canyon Road approximately 0.5 miles west of Fiedler Road.
Files
| File | Type | Posted |
|---|---|---|
| ildot 64V16-024.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities