Installation of the Second Pedestrian Bridge at Palmer Memorial Park, Calhoun Recreational Dept

Closed State & local contract opportunity Posted

Solicitation number
PE-76500-NONST-2024-000000004
State
Georgia
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The Calhoun Recreational Department in Gordon County, Georgia has issued a Request for Proposal (RFP) for the installation of a second pedestrian bridge at Palmer Memorial Park. The project involves unloading and installing a pre-fabricated 88-foot steel pedestrian bridge, constructing abutments with helical piles, pouring bridge decking and concrete aprons, placing bollards, light grading, survey staking, crane rental, and erosion control measures. The contractor will not be responsible for furnishing the steel bridge, as it has already been procured under a separate contract and is ready for delivery. The RFP has a response due date of April 24, 2024, but the contract term is not specified.

The RFP does not provide information on any set-aside designations or restrictions on the types of organizations that can respond. Additionally, the document does not mention any incumbent vendors or current contractors, nor does it indicate the possible award value or budget range for the project. The pricing terms, funding requirements and sources, and other salient information are also not provided in the RFP document.

Opportunity text

You are invited to submit a proposal for the RFP #2024-00925 Installation of Second Pedestrian Bridge at Palmer Memorial Park, Calhoun Recreational Department located at 601 River Street. The project consists of unloading and installing a pre-fabricated steel pedestrian bridge, constructing abutments with helical piles, pouring bridge decking, pouring concrete aprons up to existing paved surfaces, placement of bollards, light grading, survey staking, crane rental, erosion control BMPs, and any other ancillary tasks necessary to complete the project. The contractor will not be responsible for furnishing the 88-foot long steel bridge. It was previously procured under a separate contract, has already been fabricated by Pioneer Bridges (Fort Payne, AL), and would be ready for delivery with 2-weeks notice.

Files

File Type Posted
RFP _2024_00925 Pedestrian Bridge for Trail a.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors