IFB/CON/DOT/2604-1260182, 2025 LMIG Street Resurfacing and Associated Activities Group 3
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66062-NONST-2027-000000440
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Bonnie Davis bdavis@atlantaga.gov (404) 327-1625
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Atlanta Department of Transportation is requesting bids on street resurfacing and associated right-of-way improvements under the 2025 Local Maintenance and Improvement Grant (LMIG) Group 3 program, IFB/CON/DOT/2604-1260182, with bids due August 3, 2026.
The scope encompasses 4.32 centerline miles or 16.59 lane miles of work across three Atlanta streets: Benjamin E Mays Drive SW (Fairburn Road to Cascade Road), Greenbriar Parkway SW (Campbellton Road to Continental Colony Parkway), and Lakewood Avenue SE (Macon Drive to Claire Drive). Work includes variable-depth milling of 1 to 2 inches of existing pavement, overlay with 1 to 2 inches of 12.5mm asphalt mix, point patching and leveling, roadway striping, loop detector repairs, ramp upgrades and ADA compliance installations, and adjustments to utility structures (manholes, water valves, and drop inlets) encased with concrete pads. All work must comply with current Georgia Department of Transportation (GDOT) standards and specifications and City of Atlanta Department of Transportation details and specifications.
All unit and lump sum prices are firm, all-inclusive, and fixed for the duration of the agreement with no escalation provisions. Quantities listed in the Schedule of Unit and Lump Sum Prices are approximations subject to variation; payment is issued for actual quantities incorporated into the work based on established unit prices. Performance and Payment Bond costs are to be distributed across work items.
Liquidated damages of $1,000 per calendar day apply for each day that substantial completion is delayed beyond the established milestone deadline unless prior written approval is obtained from the City. Contractors must submit a Contract Schedule, Safety and Health Plan, Quality Control Plan, Materials Submittals, Environmental Compliance Plan, and Traffic Control Plan within fifteen days of contract award but before site mobilization.
Opportunity text
This project consists of public right-of-way (ROW) improvements 4.32 centerline miles/ 16.59 lane miles of asphalt resurfacing, milling, point repairs, roadway striping, loop detector repairs, ramp upgrade for ADA compliance, ADA ramp installation, adjustments to utility and other miscellaneous structures in the ROW. Manhole, Water Valve, and Drop Inlet (Catch Basin) adjustments are to be encased with concrete pads around the structures. All work shall be done in accordance with GDOT standards and specifications.
Files
| File | Type | Posted |
|---|---|---|
| EXHIBIT A_ Scope of Work 2025 LMIG Group 3_04.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity