About this opportunity
The Georgia Department of Aviation (DOA) is seeking bids for the Concourse E Power Equipment Replacement - Phase 1/MV Switchgears and Substations project at the Hartsfield-Jackson Atlanta International Airport. The DOA is looking to replace all power distribution equipment, including switchgear, busway, and feeder wiring and conduit up to and inclusive of the unit substations, on Concourse E, which were installed in 1992. The DOA will provide the design documents and specifications, and the selected contractor will be responsible for installing and connecting the new equipment prior to transferring circuits and demolishing the existing equipment. The contract will be awarded for a term of three years with options to extend for two one-year terms. Bidders must comply with the pricing and data requirements, technical specifications, drawings, security requirements, schedule information, quality control programs, and federal contract provisions outlined in the Invitation for Bid (IFB).
The City of Atlanta has set aside requirements for small, disadvantaged, female, and minority firms to participate in this project. The contract will be awarded to the most advantageous bid, considering price and other factors. The project includes Davis-Bacon wage requirements, and bidders must comply with Illegal Immigration Reform and Enforcement Act (IIREA) regulations. The pre-bid conference is scheduled for October 26, and the proposal deadline is November 30, 2023. The DOA has not provided information on the incumbent vendor or the available budget range for this project.
Opportunity text
Concourse E serves as an International and Domestic Concourse for Hartsfield-Jackson Atlanta Airport. It also houses a US Customs and Border Patrol facility. The majority of the power distribution equipment for Concourse E was installed in 1992. The Planning and Development Division of the Department of Aviation (DOA) considers the life cycle of power distribution equipment to be thirty years. As we approach the end of this life cycle, the DOA recommends replacing all of the power distribution equipment at all Concourse E medium voltage switchgears and unit substations. The Power distribution equipment includes switchgear, busway, and feeder wiring and conduit up to and inclusive of the unit substations.