IFB 26-016 Ferndale Phase III Underground Power
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66073-NONST-2026-000000044
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 28028 Cathodic Cable (Protection)
- 28562 Meters, Indicating And Recording (Of Power Line Fluctuations - Voltage Or Amperage - Not Hand Tool Type)
- 28567 Power Systems Switchgears And Related Accessories
- 28586 Transformers, Power Distribution (Including Fluid Filled, Pad And Pole Mount)
- 28596 Uninterruptible Power Supplies
- UNSPSC codes
- 39121017 Power distribution units PDUs
- 39121003 Instrument transformers
- 39121706 Transformer bushings
- 39121000 Power conditioning equipment
- 39121023 Static var compensators
- 39121024 Synchronous condensers
- 39121116 Low voltage switchgear
- 39101906 Step down lamp transformer
- 39121027 Encapsulated transformer
- 39121047 Intermediate frequency transformer
Show all 38
- 39121025 Buck boost transformer
- 39121045 Modulation transformer
- 39121041 Constant voltage transformer
- 39121038 Deflecting yoke
- 39121108 Distribution or control board fixtures
- 26131815 Electric accumulator
- 39121105 Switchgear systems
- 39121001 Distribution power transformers
- 39121032 Current transformer
- 39121029 Isolation transformer
- 39121033 Potential transformer
- 39121034 Zero phase current transformer
- 39121720 Transformer handles
- 26131808 Substation load control switchgears
- 26131811 Current limiting reactors
- 26131812 Gas insulated switchgears
- 39121115 Medium voltage switchgear
- 39101904 Low voltage lighting transformer
- 39121002 Power supply transformers
- 39121026 Control power transformer
- 39121028 Harmonic mitigation transformer
- 39121030 Pad mount transformer
- 39121037 Limiting transformer
- 39121042 Filament transformer
- 39121043 Rotary transformer
- 39121044 Audio frequency transformer
- 39121046 Matching transformer
- 39121109 Transmission transformers
- Point of contact
-
- Kadi-Anne McGlashan - Cole kmcglashancole@fairburn.com (770) 964-2244
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Fairburn, Georgia is requesting bids for the Ferndale Phase III Underground Power installation project under IFB 26-016, with bids due July 22, 2026 at 2:30 p.m. EST through the Bidnet website. A utility contracting license is a mandatory submission requirement; bidders lacking one face disqualification.
The scope includes installation of 1/0 underground primary wire on a 12470/7200V loop-feed system with 2-inch HDPE-SDR 13.5 innerduct and tape for all primary runs; 25 kV rated primary cable with associated rubber goods for pad-mount transformers and terminating cabinets; secondary wire in conduit per drawing specifications; and street lighting per Electric Cities of Georgia approved plans (72 fixtures across the subdivision). Approximately 12,000 feet of conduit and associated electrical components such as arresters, bushings, elbows, fault indicators, transformer pads, and grounding materials are included.
Bidders must carry commercial general liability insurance with a minimum $1,000,000 combined single limit per occurrence, automobile liability insurance with a minimum $1,000,000 combined single limit per accident, workers' compensation and employer's liability insurance, and professional liability insurance with a minimum $1,000,000 per claim. All insurance and bonds must be issued by a corporate surety authorized to do business in Georgia and appearing on the Treasury Department's Circular 570 list.
A bid bond equal to five percent of the base bid is required with submission. The successful bidder must provide a performance bond and payment bond each equal to 100 percent of the contract price, plus a maintenance bond equal to one-third of the contract price, guaranteeing defect repair or replacement for one year from completion.
The contractor must comply with the Georgia Security and Immigration Compliance Act through E-Verify participation, maintain a drug-free workplace, and employ only qualified electric distribution workers. All work will be inspected by Electric Cities of Georgia engineering and the City of Fairburn Power Department. Questions are due July 9, 2026 at 4:00 p.m. EST via email to Purchasing Specialist Kadi-Anne Cole at Purchasing@fairburn.com. Site visits are encouraged prior to bidding.
Opportunity text
This project consists of the installation of 1/0 underground primary wire on a 12470/7200V system in a loop feed. There will be 2¿ HDPE-SDR 13.5 innerduct with tape required for all primary wire on the project. The primary cable will consist of a 25 KV rating as well as all corresponding rubber goods required in all pad mount transformers and terminating cabinets. All secondary wire required will also be in conduit with the above specifications and size as denoted on the drawings.
Files
| File | Type | Posted |
|---|---|---|
| Ferndale Ph3 _ Power Plan _ 204201R27.pdf | ||
| IFB 26_016 Ferndale Phase III Underground Pow.pdf | ||
| Ferndale_Fairburn_ lighting.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity