Ferndale Ph3 _ Power Plan _ 204201R27.pdf

PDF 639 KB Posted

Attached to
IFB 26-016 Ferndale Phase III Underground Power
Solicitation number
PE-66073-NONST-2026-000000044
Issued by
Fulton County, Georgia

About this file

This is a power plan drawing for the Ferndale Phase III Underground Power installation project in the City of Fairburn, Georgia, prepared by Electric Cities of Georgia. The drawing (Sheet 1 of 1, dated April 21, 2026) illustrates the underground electrical distribution system layout for Phase 3 of the Ferndale Subdivision, depicting the installation of one pad-mounted underground transformer, approximately 12,000 feet of 4-inch PVC conduit, and multiple distribution lines rated at 25 kVA, 37.5 kVA, and 50 kVA serving parcels numbered 18 through 164. The project includes street lighting luminaires distributed throughout the subdivision and existing overhead primary service connections. Key streets shown on the plan include Ferndale Drive, Meinert Court, Crover Cove, Weise Street, and Jarrett Street, with a 30-foot access easement along Ferndale Drive. A 1/0 underground primary wire system operates on a 12470/7200V loop-feed configuration with 2-inch HDPE-SDR 13.5 innerduct and tape specified for all primary wire runs. The plan denotes Phase 2 and Phase 3 installation areas with an open point marked for system connectivity. Engineers G. Lee and D. Koppes prepared the drawing at a scale of 1 inch equals 100 feet.

The drawing serves as the technical specification document for IFB 26-016, with bids due July 22, 2026 at 2:30 p.m. EST. The project scope requires 25 kV rated primary cable with associated rubber goods, secondary wire in conduit per specifications, and 72 street lighting fixtures across the subdivision. All work will be inspected by Electric Cities of Georgia engineering and the City of Fairburn Power Department. Bidders must possess a utility contracting license and maintain commercial general liability insurance ($1,000,000 minimum combined single limit), automobile liability insurance ($1,000,000 minimum), workers' compensation and employer's liability coverage, and professional liability insurance ($1,000,000 per claim). A bid bond equal to five percent of the base bid is required, along with performance, payment, and maintenance bonds (the latter equal to one-third of contract price, guaranteeing one-year defect coverage). Successful contractors must comply with Georgia Security and Immigration Compliance Act requirements through E-Verify participation, maintain drug-free workplaces, and employ only qualified electric distribution workers. Questions regarding the project are due July 9, 2026 at 4:00 p.m. EST and should be submitted to Purchasing Specialist Kadi-Anne Cole at Purchasing@fairburn.com, with site visits encouraged prior to bidding.

View the file

Other files

File Type Posted
Ferndale_Fairburn_ lighting.pdf PDF
IFB 26_016 Ferndale Phase III Underground Pow.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

30' ACCESS EASEMENT

FERN DALE DRIVE

FERN DALE DRIVE

M

EI

NE

RT

C

OU

RT

CROVER COVE

WEISE STREET

JARRETT STREET

142143144145

155 156 157 158 159 160 161

163164

37.5 kVA

37.5 kVA

P

25 kVA

25 kVA

P

50 kVA

50 kVA

CØ

OPEN POINT

P

P

P

50 kVA

P

P

37.5 kVA

P

50 kVA

P

50 kVA

P

P

INSTALL

(1) 4" PVC

3L X F L X T P A U T

P O S T

T O P

4L X F L X T P A U T

P O S T

T O P

6L X F L X T P A U T

P O S T

T O P

8L X F L X T P A U T

P O S T

T O P

0L X F L X T P A U T

P O S T

T O P

3L X F L X T P A U T

P O S T

T O P

4L X F L X T P A U T

P O S T

T O P

5L X F L X T P A U T

P O S T

T O P

6L X F L X T P A U T

P O S T

T O P

PH

ASE 3PH

ASE 2

PH

ASE 2

PH

ASE 2

PH

ASE 3

PH

ASE 3

37.5 kVA

50 kVA

P

EXISTING 3Ø O.H. PRIMARY

PARCELS

EXISTING WOOD POLE

Sheet No.:Drawing No.:

THIS IS A CAD DRAWING, DO NOT REVISE MANUALLY.

OF

Engineer: Drafter:

Scale:Date:

CI

TY

O F

FA

IR

BU

RN

FE

RN

DA

LE

S

UB

DI

VI

SI

ON

PH

AS

E

UG

S

UB

DI

VI

SI

ON

IN

ST

AL

L

FU

LT

ON

C

OU

NT

Y

EL

EC

TR

IC

AL

D

IS

TR

IB

UT

IO

N

SE

RV

IC

ES

G. Lee D. Koppes

4/21/26 1" = 100'

204201R27 1 1

INSTALL 1Ø PAD MOUNTED U.G. TRANSFORMER

LEGEND

LIGHTING LUMINAIR

EXISTING SERVIVE

https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ AutoCAD SHX Text C:\USERS\JVANDENBERG\ELECTRIC CITIES OF GEORGIA\ENGINEERING - DOCUMENTS\PROJECTS\FAIRBURN\FERNDALE SUBDIVISION\204201R27.DWG, Plotted on: 4/21/26 1:12 PM by JVANDENBERG, Plotted on: 4/21/26 1:12 PM by JVANDENBERG4/21/26 1:12 PM by JVANDENBERG by JVANDENBERGJVANDENBERG

Sheets and Views
204201R27-PHASE 3 - 24x36 (2)

File details come from the government source that posted it. Updated .