Ferndale Ph3 _ Power Plan _ 204201R27.pdf
PDF 639 KB Posted
- Attached to
- IFB 26-016 Ferndale Phase III Underground Power
- Solicitation number
- PE-66073-NONST-2026-000000044
- Issued by
- Fulton County, Georgia
About this file
This is a power plan drawing for the Ferndale Phase III Underground Power installation project in the City of Fairburn, Georgia, prepared by Electric Cities of Georgia. The drawing (Sheet 1 of 1, dated April 21, 2026) illustrates the underground electrical distribution system layout for Phase 3 of the Ferndale Subdivision, depicting the installation of one pad-mounted underground transformer, approximately 12,000 feet of 4-inch PVC conduit, and multiple distribution lines rated at 25 kVA, 37.5 kVA, and 50 kVA serving parcels numbered 18 through 164. The project includes street lighting luminaires distributed throughout the subdivision and existing overhead primary service connections. Key streets shown on the plan include Ferndale Drive, Meinert Court, Crover Cove, Weise Street, and Jarrett Street, with a 30-foot access easement along Ferndale Drive. A 1/0 underground primary wire system operates on a 12470/7200V loop-feed configuration with 2-inch HDPE-SDR 13.5 innerduct and tape specified for all primary wire runs. The plan denotes Phase 2 and Phase 3 installation areas with an open point marked for system connectivity. Engineers G. Lee and D. Koppes prepared the drawing at a scale of 1 inch equals 100 feet.
The drawing serves as the technical specification document for IFB 26-016, with bids due July 22, 2026 at 2:30 p.m. EST. The project scope requires 25 kV rated primary cable with associated rubber goods, secondary wire in conduit per specifications, and 72 street lighting fixtures across the subdivision. All work will be inspected by Electric Cities of Georgia engineering and the City of Fairburn Power Department. Bidders must possess a utility contracting license and maintain commercial general liability insurance ($1,000,000 minimum combined single limit), automobile liability insurance ($1,000,000 minimum), workers' compensation and employer's liability coverage, and professional liability insurance ($1,000,000 per claim). A bid bond equal to five percent of the base bid is required, along with performance, payment, and maintenance bonds (the latter equal to one-third of contract price, guaranteeing one-year defect coverage). Successful contractors must comply with Georgia Security and Immigration Compliance Act requirements through E-Verify participation, maintain drug-free workplaces, and employ only qualified electric distribution workers. Questions regarding the project are due July 9, 2026 at 4:00 p.m. EST and should be submitted to Purchasing Specialist Kadi-Anne Cole at Purchasing@fairburn.com, with site visits encouraged prior to bidding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Ferndale_Fairburn_ lighting.pdf | ||
| IFB 26_016 Ferndale Phase III Underground Pow.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
30' ACCESS EASEMENT
FERN DALE DRIVE
FERN DALE DRIVE
M
EI
NE
RT
C
OU
RT
CROVER COVE
WEISE STREET
JARRETT STREET
142143144145
155 156 157 158 159 160 161
163164
37.5 kVA
37.5 kVA
P
25 kVA
25 kVA
P
50 kVA
50 kVA
CØ
OPEN POINT
P
P
P
50 kVA
P
P
37.5 kVA
P
50 kVA
P
50 kVA
P
P
INSTALL
(1) 4" PVC
3L X F L X T P A U T
P O S T
T O P
4L X F L X T P A U T
P O S T
T O P
6L X F L X T P A U T
P O S T
T O P
8L X F L X T P A U T
P O S T
T O P
0L X F L X T P A U T
P O S T
T O P
3L X F L X T P A U T
P O S T
T O P
4L X F L X T P A U T
P O S T
T O P
5L X F L X T P A U T
P O S T
T O P
6L X F L X T P A U T
P O S T
T O P
PH
ASE 3PH
ASE 2
PH
ASE 2
PH
ASE 2
PH
ASE 3
PH
ASE 3
37.5 kVA
50 kVA
P
EXISTING 3Ø O.H. PRIMARY
PARCELS
EXISTING WOOD POLE
Sheet No.:Drawing No.:
THIS IS A CAD DRAWING, DO NOT REVISE MANUALLY.
OF
Engineer: Drafter:
Scale:Date:
CI
TY
O F
FA
IR
BU
RN
FE
RN
DA
LE
S
UB
DI
VI
SI
ON
PH
AS
E
UG
S
UB
DI
VI
SI
ON
IN
ST
AL
L
FU
LT
ON
C
OU
NT
Y
EL
EC
TR
IC
AL
D
IS
TR
IB
UT
IO
N
SE
RV
IC
ES
G. Lee D. Koppes
4/21/26 1" = 100'
204201R27 1 1
INSTALL 1Ø PAD MOUNTED U.G. TRANSFORMER
LEGEND
LIGHTING LUMINAIR
EXISTING SERVIVE
https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ https://ecoga.org/ AutoCAD SHX Text C:\USERS\JVANDENBERG\ELECTRIC CITIES OF GEORGIA\ENGINEERING - DOCUMENTS\PROJECTS\FAIRBURN\FERNDALE SUBDIVISION\204201R27.DWG, Plotted on: 4/21/26 1:12 PM by JVANDENBERG, Plotted on: 4/21/26 1:12 PM by JVANDENBERG4/21/26 1:12 PM by JVANDENBERG by JVANDENBERGJVANDENBERG
| Sheets and Views |
| 204201R27-PHASE 3 - 24x36 (2) |
File details come from the government source that posted it. Updated .