IFB-2025-WA-2104 N. Purcell Water Transmission Main
Closed State & local contract opportunity Posted
- Solicitation number
- IFB-2025-WA-2104
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- UNSPSC codes
- 90000000 Travel and Food and Lodging and Entertainment Services
- 71100000 Mining services
- 73140000 Fibers and textiles and fabric industries
- 93150000 Public administration and finance services
- 72121603 Offshore wind farm geotechnical survey
- 72121604 Offshore wind farm installation and commissioning
- 72154062 Hot tapping service
- 80150000 Trade policy and services
- 82110000 Writing and translations
- 72154063 Stopple or line stopping service
Show all 26
- 83000000 Public Utilities and Public Sector Related Services
- 73130000 Food and beverage industries
- 78140000 Transport services
- 90120000 Travel facilitation
- 72121602 Offshore wind farm environmental survey
- 72000000 Building and Facility Construction and Maintenance Services
- 76000000 Industrial Cleaning Services
- 72140000 Heavy construction services
- 78120000 Material packing and handling
- 81120000 Economics
- 90140000 Commercial sports
- 93170000 Trade policy and regulation
- 72121600 Offshore wind farm service
- 72121601 Offshore wind farm development and project management
- 72121605 Offshore wind farm operation, maintenance and service
- 72121606 Offshore wind farm decommissioning
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The Pueblo West Metropolitan District (PWMD) has issued an Invitation for Bid (IFB-2025-WA-2104) for a critical water infrastructure project in Pueblo County and Pueblo City, Colorado. The procurement involves constructing a new 16-inch C900 PVC potable water transmission line spanning approximately 11,400 linear feet between E. Industrial Blvd. and E. Gold Dr. The base bid requires installation of water transmission infrastructure, including appurtenances, fittings, isolation valves, tie-ins, and thrust blocks. Bid Alternate No. 1 includes a trenchless horizontal boring crossing of N. Purcell Blvd., involving steel casing, fittings, and an isolation valve installation. The project demands comprehensive site work, including open trench methods, erosion control, earthwork, road cutting and patching, and road repair to establish a fully functional water transmission system. The bid is due on April 7, 2025, with a contract timeline extended from 120 to 180 calendar days. Contractors must obtain a Right-of-Way Use Permit from Pueblo County and a Stormwater Construction Discharge Permit from CDPHE Water Quality Division.
The solicitation does not explicitly outline specific set-aside designations or restrictions for disadvantaged enterprises. The project requires contractors to provide a Stormwater Management Plan and conduct stormwater management inspections, with PWMD performing periodic inspections to meet MS4 permittee requirements. Liquidated damages are established at $4,500 per day, consistent with CDOT's Schedule of Liquidated Damages. While specific budget ranges are not disclosed, the project involves substantial infrastructure work with anticipated rock excavation and specific technical requirements such as concrete encasement at E. Ranch Dr. and in the Williams Creek area. The district will provide testing services through a third-party contractor and has designated one staging area for the project. Builder's Risk Insurance will not be required, and no construction trailer is needed. Contractors must be prepared to handle complex infrastructure installation, including water transmission line construction, trenchless boring, and comprehensive site restoration.
Opportunity text
The Work will include all necessary labor, supervision, equipment, tools, and materials for the construction of a new sixteen-inch (16") C900 PVC potable water transmission line between E. Industrial Blvd. and E. Gold Dr. including all appurtenances, and installation of fittings, isolation valves, tie-ins, and thrust blocks (Base Bid). The Work also includes Bid Alternate No. 1 which consists of, but is not limited to, the construction of a new sixteen-inch (16") C900 PVC potable waterline crossing N. Purcell Blvd. via trenchless horizontal boring, including the tie- in, and installation of fittings, isolation valve, steel casing and thrust block. The main running alongside N. Purcell Blvd. involves placing new waterline via open trench methods, erosion control, earthwork, cutting, patching, paving/repair of roads, and all appurtenances as specified and required for a complete and functional system. The pipeline crossing N. Purcell Blvd. will involve a trenchless horizontal bore under the roadway. All materials as indicated on the drawings will be provided by the contractor and must be installed, along with the completion of all associated site work relating to the new potable water transmission line.
Files
| File | Type | Posted |
|---|---|---|
| IFB-2025-WA-2104 Purcell Transmission Main.pdf | ||
| Addendum No. 1.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity