IEPA SRF Census Tract 9 - Block Level Lead Service Line Replacements

Open State & local contract opportunity Posted

Solicitation number
1347465
State
Illinois
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The IEPA SRF program is inviting proposals for block-level lead service line replacements in Census Tract 9 of Cook County, Illinois, with proposals due November 25, 2026. No set-aside, preference, or eligibility restriction appears in the source.

Scope includes but is not limited to replacing lead service lines from the water main in the street to the point of connection inside each residence. Work covers excavation and removal or abandonment of the existing line; a new corporation stop; a new copper service line of at least 1 inch in diameter, or matching a larger existing diameter; a curb stop, shut-off box, insulation, and PVC casing as required; and installation of a new meter, which the Chicago Department of Water Management provides. Where the Chicago Plumbing Code (latest edition) is not met, the scope adds removal and replacement of residential sanitary sewer and/or mainline sanitary at those locations. Testing, flushing, backfill, and temporary pavement are included as defined in the plans and specifications. Contractors must also handle permitting, pre-construction meetings, site mobilization, traffic control and protection, trenching, grading, compaction, tree protection, trench maintenance, and debris removal. All work must follow City of Chicago project standards.

Opportunity text

The work for which proposals are invited includes but is not limited to the replacement of lead services lines, from the water main in the street to the point of connection located inside each residence; excavation, removal or abandonment of the existing lead service line, installation of a new corporation stop, installation of a new copper service line (1-inch diameter minimum or match existing diameter if larger) and curb stop, shut-off box, insulation and PVC casing as required; installation of a new meter (meter provided by Chicago Department of Water Management), removal and replacement of residential sanitary sewer and/or mainline sanitary at those locations where the requirement of the Chicago Plumbing Code (latest edition) are not met, testing and flushing, backfill and temporary pavement as defined in the plans, detailed specifications and in accordance with all City of Chicago project standards. The work also includes but is not limited to permitting, pre-construction meeting(s), site mobilization, providing traffic control and protection for the duration of the work, trenching, grading, backfilling, compaction of excavations, protection of trees, maintenance of trenches and removal of all construction debris.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors