IDF Buildout & Network Infrastructure Upgrade: Hansen O&M 1st Floor
Closed State & local contract opportunity Posted
- Solicitation number
- PU26-005
- State
- Kansas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
WaterOne, a quasi-municipal water district serving Johnson County, Kansas, is requesting proposals for IDF buildout and network infrastructure upgrade services at its Hansen Operations & Maintenance facility's first floor under RFP PU26-005, with proposals due September 30, 2026 by 2:00 PM CST/CDT. Attendance at a mandatory site walk on August 11, 2026 at 8:30 AM (7601 Holliday Drive, Kansas City, KS) is required; failure to attend results in automatic disqualification. RSVP and signed confidentiality acknowledgment must be submitted by August 4, 2026 by 4:00 PM.
The scope encompasses furnishing all labor, materials, equipment, coordination, supervision, testing, labeling, cleanup, and documentation for a complete, operationally ready IDF environment. The contractor installs cabling and supporting rack infrastructure (including UPS and PDUs) and physically racks two new WaterOne-furnished network switches; switch configuration and programming are excluded. Work includes a 45U 2-post rack, ladder tray/pathway system, Category 6A copper cabling and terminations for 50 connected device locations, two duplex OM4 fiber runs, patch panels, LIUs, PDUs, UPS (minimum 2000VA/1800W), testing and certification, labeling, documentation, and decommissioning of legacy infrastructure. All work must be completed within 90 calendar days of Notice to Proceed.
Pricing is submitted using WaterOne's standardized template: firm fixed Base Bid for Category 6A cabling, a deduct alternate for Category 6 cabling, and unit pricing for future changes covering copper and fiber cable runs, patch cords, patch panels, LIUs, rack installation, ladder tray, PDUs, UPS, and labor (standard and after-hours). Proposals are evaluated 25% technical approach and scope understanding, 25% project team and execution/coordination ability, 20% experience and qualifications, 15% cost, and 15% quality/compliance/risk management. Best Value criteria govern award recommendation to WaterOne's Board. Questions are due August 28, 2026 by 4:30 PM, with responses issued by September 4. Insurance requirements include workers' compensation, commercial general liability ($1 million per occurrence / $2 million aggregate), automobile liability, excess/umbrella ($5 million), and installation floater at full replacement cost.
Opportunity text
Scope of services: The Contractor shall be responsible for furnishing all labor, materials, equipment, coordination, supervision, testing, labeling, cleanup, and documentation necessary to deliver a complete, operationally ready IDF environment (cabling and supporting rack infrastructure, including the UPS and PDUs. Contractor Scope includes installation of the cabling and supporting rack infrastructure (including the UPS and PDUs) and the physical racking/mounting of two (2) new network switches only. Switch configuration and programming are excluded from Contractor scope, Existing switches will be retained by WaterOne and are not relocated; the two (2) new WaterOne furnished switches are racked under this scope.
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice-IDF Buildout _ Network Infrastructure Upgrade- Hansen O_M 1st Floor.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity