Howard Avenue Pumping Station Improvements - Sub Bidders
Closed State & local contract opportunity Posted
- Solicitation number
- 25439121-SUB
- State
- Massachusetts
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- UNSPSC codes
- 31350000 Fabricated tube assemblies
- 31230000 Machined raw stock
- 31340000 Fabricated sheet assemblies
- 40175311 Pipe Tube
- 31330000 Fabricated structural assemblies
- 40175502 Pipe accessories
- 30000000 Structures and Building and Construction and Manufacturing Components and Supplies
- 31360000 Fabricated plate assemblies
- 30260000 Structural materials
- 30103800 Metallic fibers and filaments
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The City of New Bedford's Purchasing Department and Department of Public Infrastructure is seeking sealed bids for the Howard Avenue Pumping Station Improvements project located at 1000 Rodney French Boulevard. This comprehensive infrastructure project involves significant upgrades to an existing pumping station, including decommissioning and filling existing underground wet and dry wells, repurposing the existing building for a new generator and odor control equipment, constructing a new submersible pumping station, and installing a precast electrical building. The project also encompasses replacing approximately 900 feet of influent sewer with 36-inch PVC pipe, rehabilitating 935 feet of storm drain pipe and 400 feet of forcemain using cured-in-place pipe (CIPP) lining, and implementing roadway improvements. Only prequalified bidders may submit proposals, with a non-mandatory pre-bid conference scheduled for May 14th, 2025, and bid opening set for July 8th, 2025. The total contract time is 540 calendar days, commencing 20 days after the agreement's effective date, and bidders must submit various certifications, including DCAMM certificates and compliance with federal and state regulations.
The procurement includes specific set-aside requirements for Disadvantaged Business Enterprise (DBE) participation, with mandatory goals of 4.2% D/MBE and 4.5% D/WBE at the Commonwealth level, and 11.0% D/MBE and 5.0% D/WBE at the City of New Bedford level. The project is partially funded by the Massachusetts Clean Water Trust through a Clean Water State Revolving Fund (CWSRF) loan, with an estimated project cost of $17,300,000. Contractors must comply with Davis-Bacon prevailing wage requirements, Massachusetts minimum wage rates, and the American Iron and Steel requirement, which mandates that all iron and steel products be produced in the United States. The prequalification tracking document reveals multiple qualified contractors across various trade categories, with Waterline Industries notably prequalified in multiple disciplines including General Contractors, Electrical, HVAC, Miscellaneous and Ornamental Iron, and Plumbing. Bidders must also submit additional documentation including OSHA certification forms, non-collusion certifications, tax compliance forms, and contractor immigration status verifications to be considered for the contract.
Opportunity text
The City of New Bedford (Owner) Purchasing Department, in conjunction with Department of Public Infrastructure, is soliciting sealed bids for the Howard Ave Pumping Station Improvements, located at 1000 Rodney French Boulevard New Bedford MA 02744. Only bidders that have been prequalified may submit bids for this project.
Files
Show all 11
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity