HMA Resurfacing Project
Open State & local contract opportunity Posted
- Solicitation number
- 97893
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- IDOT Contracts Office dot.de-contracts@illinois.gov (217) 782-7806
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Illinois Department of Transportation is soliciting electronic bids under Contract No. 97893 for HMA resurfacing, sidewalk, curb and gutter, and related reconstruction on East Market Street in Troy, Madison County, Illinois, with bids due November 6, 2026 at 12:00 p.m. through the iCX-Integrated Contractors Exchange system. Bids will be publicly opened at that time, and the contract will be awarded to the lowest responsive and responsible bidder. No exclusive set-asides are identified in this contract.
The project covers a 1,412-foot (0.268-mile) segment of East Market Street (Route FAP 586A) from Hickory Street to Dewey Street in District 8. Work includes removals, earthwork, aggregate base, HMA binder and surface courses, concrete sidewalk, curb and gutter, driveway pavement, storm sewer construction, thermoplastic pavement markings, and seeding. Construction proceeds in two stages to maintain vehicle access. The contractor must prepare a traffic control plan, submit shop drawings for review, comply with NPDES storm water permit requirements, and maintain a designated on-site safety representative. Removal and disposal of regulated substances at 201 E. Market Street requires soil contamination monitoring.
Utility coordination includes City of Troy water and sewer improvements, Ameren pole relocation, AT&T fiber optic facilities, and Charter Communications telecommunications facilities. Prevailing wage and Equal Employment Opportunity provisions apply, and the contractor must submit weekly certified payroll and compliance statements. An IDOT Training Program Graduate on-the-job training incentive of $15.00 per hour is available for certified program graduates.
The project is funded through Construction Funds, and the source does not state a contract value.
Opportunity text
The proposed reconstruction project is located on E. Market Street from Hickory Street to Dewey Street in Troy, Illinois. The project length is 1,412 feet (0.268 miles). The work on this project consists of removals, earthwork, aggregate base, HMA binder and surface courses, sidewalk, curb and gutter, driveway pavement, thermoplastic pavement markings, seeding and all incidental and collateral work necessary to complete the work in the above-described Section according to the plans, specifications and special provisions.
Files
| File | Type | Posted |
|---|---|---|
| ildot 97893-126.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity