Helicopter Utility Line Inspection in Post Disaster Environment - 2026 and 2027
Closed State & local contract opportunity
- Solicitation number
- 2026-07
- State
- Florida
- Responses due
Opportunity facts
- UNSPSC codes
- 25132200 Safety and rescue aircraft
- 25131605 Rotary wing training aircraft or helicopter trainer
- 78111504 Sightseeing service by air
- 25131604 Medical or rescue helicopters
- 25132201 Rescue and firefighting aircraft, 150 gallon
- 78111506 Medical evacuation by air ambulance
- 86101901 Avionics training
- 25132203 Rescue and firefighting aircraft,1500 gallon
- 78111900 Space transportation
- 78142207 Flight operations automation, design and construction
Show all 21
- 25131600 Civilian and commercial rotary wing aircraft
- 25131800 Specialty aircraft
- 25131601 Passenger transport helicopters
- 25131602 Cargo transport helicopters
- 25131603 Agricultural helicopters
- 25132202 Rescue and firefighting aircraft, 3000 gallon
- 25201521 Trim tab for rotor blade
- 25201522 Helicopter universal pod
- 78111500 Passenger air transportation
- 78111502 Commercial airplane travel
- 81161714 Aeronautical information service
- Point of contact
-
- Wesley Sims wsims@gladeselectric.com
Updated .
About this opportunity
DEADLINE HAS PASSED. Gulf Coast Electric Cooperative (GEC) issued an RFP for helicopter utility line inspection services in post-disaster environments for 2026 and 2027, with proposals due July 17, 2026 — a date that has already elapsed as of the current date (July 21, 2026).
The scope covers post-disaster helicopter utility line inspection flights over GEC's transmission and distribution lines in Florida, with assigned GEC employees aboard to document damage locations and prioritize immediate repairs. Work activates via Notice to Proceed, Task Order, or Task Release following storms or weather events, commencing within 24 to 48 hours of authorization and continuing 24 hours per day, seven days per week (including holidays if requested) until power restoration is complete. Operations must comply with local, state, and federal law, including requirements imposed by FEMA, FDEM, and the FAA. The contractor shall not conduct inspections during sustained winds exceeding 30 knots.
The contractor must provide a helicopter capable of carrying up to three GEC employees plus pilot, with sustained-hover capability for damage documentation. A pilot with utility-line inspection experience is preferred. The contractor must mobilize rapidly and maintain continuous availability throughout the contract term.
GEC will engage the contractor through a Master Service Agreement (MSA) supplemented by task-specific authorizations detailing work locations and scope. The RFP documents include an MSA template, a detailed scope-of-work attachment, and a rate-sheet template for pricing.
This opportunity is closed to new proposal submissions.
Opportunity text
I. General The scope of services under this RFP includes post-disaster helicopter utility line inspection services for major storm restoration activities (the Services). GEC will activate the MSA through a Notice to Proceed, Task Order, or Task Release (Authorization) with the specific details of the work, including exact locations within its territory requiring assessments. The Services described below are non-exhaustive examples of services that may be requested; however, GEC may request less than all the services described, or additional services not specifically listed below but within the general scope of the RFP. II. Services • Duties will include flying over GEC's transmission and distribution lines with assigned GEC employee(s) as passengers to determine where immediate repairs are needed allowing GEC employee(s) ample time to document such damages. Contractor will not be expected to perform work until it is safe to do so (sustained winds of 30 knots or below) during storm restoration efforts; • Work to start as soon as it is safe to begin, immediately after storm or event has passed, and work will end when all power is restored. • Participation in meetings with key stakeholders if necessary; • Contractor shall have the ability to mobilize within 24-48 hours of Authorization and provide all services 24-hours a day, seven (7) days a week, including holidays (if requested) for the term of the Contract. • Contractor shall perform all requested activities in accordance with local, State, and Federal law, including those imposed by FEMA, FDEM, the Federal Aviation Administration, and any other State or Federal agencies. Personnel • Helicopter Pilot - Pilot with experience of inspecting electric utility lines is preferred. Equipment • Helicopter - Contractor should provide a helicopter capable of carrying up to 3 GEC employees, plus the helicopter pilot. The helicopter needs to have the capability to hover in a certain area for a sustained amount of time in order to allow GEC employees to access the damage and take necessary notes. Contract Terms In addition to compliance with applicable Federal, State, and local rules and regulations, Contractor must also comply with the MSA and the terms and conditions in the Authorization, which will dictate the anticipated effort needed to complete the Services and include applicable terms and conditions for the Services. Fee Structure Given the uncertain nature of the quantity of work required and the percentage of service territory that will be impacted by the disaster, Contractor will have a time and materials fee structure at the rates proposed in response to this RFP. Please provide an hourly rate of the services and please include if there is a minimum hour requirement for the service. Documentation Management & Support Contractor shall provide data management and support as a part of the Services, including use of a compatible system for clearly tracking and documenting all elements identified above. Contractor must also substantiate its costs. Contractor must maintain all records pertaining to work performed consistent with the requirements set forth in the MSA and Authorization. Contractor shall submit a report by close of business each day with, at a minimum, the following information: • Contractor's Name; • Contract Number; • Daily and cumulative hours for personnel, by position, if appropriate; • Other operational and complaint tracking information, as requested. Failure to provide audit quality information by 5:00 p.m. of the following day of operation may result in financial penalty to the Contractor.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline