- The Board of County Commissioners of Okaloosa County, Tourist Development Department is requesting bids for parking expansion at two county parks in Fort Walton Beach, Florida under ITB TDD 65-26, with bids due August 12, 2026 at 3:00 p.m. and a mandatory pre-proposal meeting on July 22, 2026 at 9:00 a.m. This is a federally grant-funded project subject to Davis-Bacon prevailing wage requirements, Buy America provisions for iron and steel products, and related federal compliance obligations. The...
- The City of Pensacola Department of Public Works and Facilities Engineering and Construction Services is requesting sealed bids on construction of the Hollice T. Williams Stormwater Park under ITB 26-046, with bids due August 3, 2026 at 2:30 p.m. local time at City Hall. Bidders must hold a Florida Licensed General Contractor or Florida Licensed Underground Utilities Contractor license at time of submission and must comply with E-Verify requirements and Davis-Bacon wage determinations — core...
- The Board of County Commissioners of Okaloosa County, Florida, Tourist Development Department is requesting proposals for parking expansion at John Beasley Park (114 spaces) and Ross Marler Park (113 spaces), with proposals due August 12, 2026, and a mandatory pre-bid meeting required before submission. The scope encompasses site clearing, demolition, excavation and fill, finish grading, concrete sidewalk and step construction, flexible asphalt paving, stormwater gravity piping, riprap...
- Walton County, Florida is requesting bids for multi-use path and rights-of-way maintenance services under ITB 26-20, with bids due August 6, 2026 at 2:00 p.m. and a mandatory pre-bid conference on July 22, 2026 at 9:00 a.m. at Walton County Beach Operations in Santa Rosa Beach. The scope encompasses routine maintenance of county-owned multi-use paths and associated rights-of-way across designated areas on County Highways 30A, 283, 393, 395, and 83 and local routes, with maintenance...
- Hillsborough County Parks and Recreation Department is requesting sealed bids for construction of Phase 2 of the Southshore Sports Complex at 6110 Waterset Boulevard, Apollo Beach, Florida under IFB 16-IFB-26-00279, with bids due August 11, 2026 at 2:00 p.m. Eastern Time. An 8% Small Business Enterprise (SBE) subcontractor participation goal applies to this contract. The project scope encompasses six baseball/softball synthetic turf fields with dugouts and sports lighting, one concession...
- The Okaloosa Board of County Commissioners is requesting bids on Project Opal Phase 2 Bid Package #2 Phase 1 Improvements under ITB PW 45-26, with bids due August 5, 2026 at 3:00 p.m. CST. All submissions must be made electronically through OpenGov at https://procurement.opengov.com/portal/myokaloosa; no other submission method is accepted. The scope encompasses civil infrastructure: excavation and embankment, erosion control, maintenance of traffic, stormwater facilities, potable water lines,...
- The City of Pensacola is requesting sealed bids for construction of a 12-foot-wide concrete multi-use path and associated sidewalks spanning approximately 1.31 miles through Hollice T. Williams Park from Jordan Street to Gonzalez Street under ITB 26-042, with bids due July 30, 2026 at 2:30 p.m. and public bid opening July 31 at 10:00 a.m. The project is federally funded through the Florida Department of Transportation's Transportation Alternatives grant program and carries federal compliance...
- Okaloosa County Board of County Commissioners is requesting bids for Project Opal Phase 2, a civil-infrastructure project in Crestview, Florida encompassing excavation, embankment, stormwater facilities, potable water and sanitary sewer systems, road extension, loop road, parking lots, sidewalks, lighting, and fencing, with bids due August 5, 2026 at 3:00 p.m. Central Standard Time and a mandatory pre-bid conference on July 27, 2026 at 9:00 a.m. at the Okaloosa County Public Works Office. The...
- The City of Thomasville, Georgia is requesting sealed bids for Balfour Park Phase 1 Improvements with bids due August 5, 2026 at 10:00 a.m. local time, and a mandatory pre-bid conference on July 15, 2026 at 2:00 p.m. EST at the City Engineer's Office. The scope encompasses site development, construction of a pre-engineered restroom and pavilion building, foundations, utilities, parking areas, access drives, sidewalks, site lighting, fencing, and landscaping. The project includes site preparation...
- Okaloosa County Board of County Commissioners is requesting bids on construction of a southbound right-turn lane on PJ Adams Parkway at State Road 85 in Crestview, Florida under ITB PW 02-26, with sealed bids due August 5, 2026 at 3:00 p.m. CST and a mandatory pre-bid conference on July 16, 2026 at 9:00 a.m. CST at the Okaloosa County Public Works Office, 1759 S. Ferdon Boulevard. The scope includes roadway widening to construct a second dedicated southbound right-turn lane, with work elements...
Walton County Board of County Commissioners, Florida is requesting sealed bids for Helen McCall Park Expansion Phase 1, a heavy-civil construction project in Santa Rosa Beach, under ITB #26-01, with bids due July 30, 2026 at 2:00 p.m. The project scope encompasses six new baseball and t-ball fields, a press box with concessions and restrooms, expanded parking, stormwater management, water and sanitary sewer infrastructure, irrigation, and landscaping on approximately 15.6 acres west of Moll Drive. Bidders must be Florida-licensed general contractors, hold Walton County Building Permits, and be prequalified by the Florida Department of Transportation in work classes 7 (Drainage), 10 (Flexible Paving), 11 (Grading), 12 (Grassing/Seeding/Sodding), and 40 (Sidewalk). This is a central qualification filter; FDOT prequalification is mandatory. Key quantities include approximately 27,866 cubic yards of import borrow material, 12,052 cubic yards of excavation, 15,317 square yards of stabilized subgrade, 6,333 square yards of concrete sidewalk, and 28,889 square yards of athletic field sod. The project presents material construction challenges: significant earthwork, a live forcemain sanitary sewer installation with pump stations, and a pending DEP water and sewer permit anticipated before Notice to Proceed. Critical coordination dependencies exist with MUSCO Lighting (field and parking lighting via State contract) and Choctawhatchee Electric Cooperative for electrical integration; bidders must account for staking and scheduling lead time with both entities from rough grading forward. The contract term is 540 calendar days to substantial completion, plus 30 days for punch list completion. Liquidated damages are $3,813.00 per calendar day for failure to meet either deadline. Bid security of five percent of base bid price (certified check or bid bond) is required. The County reserves the right to reject any or all bids and to value engineer if the low bid exceeds budget; award goes to the lowest responsive and responsible bidder. The non-mandatory pre-bid conference is scheduled June 23, 2026 at 9:00 a.m. at the Walton County Central Purchasing Office in DeFuniak Springs, with a teleconference option. Questions are due July 16, 2026 at 12:00 p.m. All bids must be submitted electronically through the County's e-Procurement Portal. Four bid alternates address Building C restroom, concrete slab for future batting cages, Building B equipment storage, and complete field underdrainage systems. The County is tax-exempt from federal excise and state sales tax.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Helen_McCall_Park_Expansion_Phase_1_(Addendum__3_Revision).pdf | 588KB | 7/16/26 | ||
Job Order Mechanical Services.pdf | 281KB | 5/13/26 |