Heartland Behavioral Healthcare - Admin Air Handler Fan Cubes project

Solicitation # SRC0000032472
Posted 7/18/25, 9:06 AM
No Updates
Due 8/5/25, 4:00 AM
State
Ohio
Source
View
Similar Opportunities
The Huron County jurisdiction in Michigan is seeking proposals for a comprehensive HVAC system replacement project at Fulton Schools, specifically targeting the high school and middle school facilities. The procurement involves a mechanical replacement of existing HVAC infrastructure, including rooftop units (RTU-1, HV-1), unit heaters, exhaust fans, and associated ductwork and electrical systems. The project scope encompasses multiple building units, with work planned for first and second...
The State of Indiana, specifically Correctional Industries for the Plainfield Correctional Facility's ICI Distribution Center in Hendricks County, is seeking a procurement for a replacement Roof Top Unit (RTU) #7, which is a 25-ton HVAC unit located at 757 Moon Road in Plainfield. The solicitation requires a comprehensive replacement process that includes disconnecting, draining, and removing the existing old unit (Serial Number 336101138D) and installing a new American Standard or equivalent...
The Ohio Department of Mental Health and Addiction Services, specifically Heartland Behavioral Healthcare (HBH), is seeking qualified dealers to procure and install a critical infrastructure upgrade involving Uninterruptible Power Supply (UPS) systems. The procurement centers on one 15KVA/15 KW UPS System, specifically the APC Model #GVUPS15K0BB4FS, which requires 208V input and 120/208V output with three-phase, four-wire configuration operating at 60 HZ. Key deliverables include the UPS...
The State of Ohio is seeking procurement of an Airmax SolarSeries Aeration System with specific technical requirements for an aquatic environment. The solicitation (ID: 686d98f4697033b879097696) involves a comprehensive solar-powered aeration system that includes an American-made solar panel setup, Bluetooth smart controller, and two ProAir 2 weighted diffusers. The system requires professional installation, which will take approximately two days and includes placement of a lockable...
The state of Ohio has initiated a procurement opportunity for the Dynatron HOLO120 Holo Fan 120mm PWM RGB 3D Holographic Display Case Fan, a specialized PC cooling component. This contract opportunity, identified by the unique ID 68767e5cf2b7f6ed600896fc, was posted on July 15, 2025, with proposals due by July 16, 2025. The procurement appears to be focused on acquiring a high-performance computer cooling fan with advanced holographic display capabilities, specifically targeting RGB-enabled...

Heartland Behavioral Healthcare is seeking proposals for a mechanical system upgrade at its administrative facility in Massillon, Ohio, specifically soliciting contractors to provide and install a Mainstream IntelliCUBE direct drive fan array system. The procurement involves replacing existing fan infrastructure with a high-efficiency unit capable of delivering 19,000 CFM at 6.88" static pressure, utilizing two CDP-630-20-460 fan units with 20 HP premium efficiency motors. Contractors must be licensed and insured to perform mechanical and electrical work in Ohio, with demonstrated experience in similar fan array installations. The project requires precise logistics, including transporting equipment through constrained access areas and integrating the new system with existing electrical and control infrastructures. Proposal submissions must include a project understanding, work plan, timeline, itemized cost proposal, and proof of licenses and certifications. A mandatory site visit is scheduled for July 23, 2025, from 7am to 5pm at the facility located at 3000 Erie Street South in Massillon. Proposals are due by August 5, 2025, and should be submitted to Thomas "Mac" McMillan, Maintenance Supervisor, via the provided contact information.

The solicitation does not specify specific set-aside designations or restrictions for disadvantaged enterprises. No incumbent vendors or current contractors are mentioned in the documentation. The existing infrastructure involves an administrative mechanical room with current airflow and static pressure requirements that need upgrading. While a specific budget range is not disclosed, the project involves complex mechanical and electrical work with specialized fan array equipment, suggesting a potentially significant investment. The procurement is specific to Stark County, Ohio, and will require precise technical capabilities for installation, including navigating space constraints and performing comprehensive startup and commissioning procedures. The successful contractor will need to verify proper fan operation, confirm specified airflow performance, and make necessary adjustments to ensure optimal system functionality. Interested bidders should carefully review the technical specifications and site visit requirements to prepare a comprehensive and competitive proposal.

Generated 7/18/25, 12:35 PM