- The City of Kissimmee, Florida cancelled RFQ No. 5 for the installation of an exterior fiber cement siding system at Haven on Vine Apartments on July 20, 2026, without award. The solicitation originally closed on July 8, 2026. The project scope required installation of a complete James Hardie fiber cement siding system or City-approved equivalent on one four-unit apartment building (Building #D) located at 1815 W. Vine Street, Kissimmee, Florida. Work included removal of existing exterior wall...
- The City of Kissimmee is requesting quotations for exterior stucco demolition, preparation, installation, and finishing at Haven on Vine under RFQ No. 3, with quotations due July 8, 2026 (deadline has passed as of today, July 21, 2026). The scope includes furnishing all labor, materials, supervision, equipment, permits, disposal, scaffolding, and incidentals necessary to remove and replace the exterior stucco system, including demolition, preparation, installation, finishing, cleanup, and...
- The City of Kissimmee is requesting electronic quotations for window and door replacement at Haven on Vine, with quotations due July 8, 2026. This solicitation is subject to Davis-Bacon prevailing-wage requirements and Build America Buy America (BABA) compliance — both decision-flipping constraints that restrict bidder pools and impose material-sourcing and labor-cost obligations. The scope encompasses removal and replacement of all exterior windows and doors, including demolition, installation,...
- The City of Kissimmee is requesting quotations for roof replacement at Haven on Vine, with quotes due July 8, 2026. This procurement is subject to Davis-Bacon prevailing-wage requirements and the Build America Buy America Act, both indicated by attached documents. The scope requires complete roof replacement including labor, supervision, equipment, materials, permits, and disposal. The specified roofing system consists of GAF Timberline UHDZ shingles, double synthetic underlayment, GAF...
- The City of Kissimmee is requesting electronic quotations for a complete electrical system upgrade at Haven on Vine Apartments, a four-unit building in Lake Harbor CDP, Polk County, Florida, with quotations due July 8, 2026. The scope includes demolition, installation, testing, labeling, startup, and final inspection of a new electrical service system. The contractor must furnish all labor, supervision, materials, equipment, permits, testing, inspections, utility coordination, and incidentals...
- Brevard County Housing and Human Services solicited bids on rehabilitation of a single-family home at 1027 Woodsmere Parkway, Rockledge, Florida under SHIP (State Housing Initiative Partnership) program funding, with bids due May 28, 2026 at 2:00 p.m. The project has moved to award: 2W Solutions of Ocoee, Florida was selected as the lowest responsive bidder at $96,500.00 on June 8, 2026, and the protest period has opened. The scope encompasses comprehensive home rehabilitation including roof...
- Miami-Dade County Water and Sewer Department (WASD) is requesting price quotations for hazard mitigation and storm hardening improvements to Pump Station 683 under RPQ No. P16176, with bids due August 18, 2026 at 10:00 a.m., and a mandatory pre-bid and site meeting on July 16, 2026 at 10:00 a.m. at the project location (4801 SW 117th Ave., Miami, FL 33175). No set-asides, DBE participation requirements, Davis-Bacon wages, or SBE restrictions apply. The scope encompasses furnishing all materials,...
- The Orlando Housing Authority is soliciting bids to establish a contractor pool for interior painting and minor wall-surface repairs at ten public housing properties across Orlando and Orange County, with sealed bids due August 17, 2026 at 2:00 p.m. EST and a mandatory pre-bid conference and site walkthrough on July 22, 2026 at 10:30 a.m. EST at 325 N. Hillside Avenue, Orlando, Florida. This is an indefinite-quantity contract with no minimum work volume guaranteed. The scope encompasses...
- City of Orlando is requesting sealed bids for Water Conserv II WRF Equalization Pump Station Improvements under IFB26-520, with bids due August 20, 2026 at 2:00 p.m., and a non-mandatory pre-bid meeting on July 30, 2026 at 10:00 a.m. at the project site (5420 L.B. McLeod Road, Orlando, FL 32811). The scope encompasses furnishing and installing equalization pumping equipment, electrical equipment, instrumentation and controls systems, and related work at the Water Reclamation Facility. The...
- The St. Johns River Water Management District is requesting submittals from general contractors for exterior rehabilitation of the Palm Bluff Security Residence at 1275 N State Road 415, Osteen, Florida, with proposals due July 21, 2026 at 1:30 p.m. The scope includes removing and replacing seven exterior windows, wood siding, corner boards, filler boards, and support timbers; pressure washing the entire exterior structure; painting with exterior-grade latex paint; installing gutters and...
The City of Kissimmee, Florida issued RFQ No. 4 for foundation waterproofing at Haven on Vine Apartments with quotations due July 8, 2026, but cancelled the solicitation without award as of July 20, 2026. The project is subject to Davis-Bacon prevailing wage requirements and Build America, Buy America (BABA) compliance — both decision-flipping federal requirements tied to the project's federal funding source. The scope encompasses below-grade foundation waterproofing for a four-unit apartment building at 1815 W. Vine Street, Kissimmee, Florida, including excavation, concrete surface preparation, crack repair, waterproofing membrane installation, protection board installation, termination bars, backfill, grading, landscape restoration, cleanup, and final inspection. Work quantities include approximately 630 square feet of pressure washing and waterproofing membrane, 850 square feet of surface sounding for delaminated concrete, 100 linear feet of crack routing and sealing, 200 linear feet each of protection board and termination bar, and 20 square feet of concrete repair allowance. Contractors must hold a current Florida Contractor License, provide a Certificate of Insurance, submit three references for similar waterproofing projects, and obtain manufacturer certification for the proposed waterproofing system. Quotations must include lump sum pricing, proposed project schedule, earliest mobilization date, warranty information (minimum one-year workmanship plus manufacturer warranty), material lead times, waterproofing system description with manufacturer documentation, and certification of Davis-Bacon and BABA compliance. Davis-Bacon prevailing wage rates for Osceola County apply, with minimum wages ranging from $9.00 to $39.01 per hour depending on labor classification; contractors must also provide one hour of paid sick leave per 30 hours worked, up to 56 hours annually. A non-mandatory site visit was available for contractors to verify existing conditions. The successful contractor was required to mobilize during the second week of July 2026 upon award. One quotation from Western Specialty Contractor was submitted on July 9, 2026 with a base bid of $57,650, but the solicitation was subsequently cancelled.