This opportunity has been awarded to Frontier Design-Build and is no longer an open solicitation. The Award Information document confirms contract execution for a gymnasium and facility upgrade project in Georgia with a proposal due date of December 29, 2021.

The scope encompasses construction of a new Nucor American Buildings structure measuring 75 feet long, 40 feet wide, and 20 feet tall, fully insulated with structural supports for six basketball goals and complete door and lighting systems. The HVAC package includes two 5-ton Trane RTUs with UV sanitizers, four 15-ton Trane gas package units, three 10-ton units, one 20-ton unit, and one 5-ton split system — all rated 14 SEER with new curb adapters, UV lights per unit, new thermostats, duct cleaning and sanitization, testing and balancing, and user orientation. Electrical work comprises demolition of existing ceiling infrastructure (acoustical tile, registers, and fixtures), fumigation and sanitization of open ceiling areas to mitigate airborne contaminants, and installation of 300 new 2-foot by 4-foot LED fixtures, 22 exit lights with individual switching, and 195 new supply and return registers integrated into new acoustical ceilings. The facility includes a fully operational fire alarm system compatible with existing panels and interior wall panels up to 10 feet above finished floor. The fire alarm system must be compatible with existing infrastructure.

No contract value, contract term, set-asides, evaluation criteria, or incumbent predecessor is identified in the available documents.

Opportunity text

New gymnasium shall be Nucor - American Buildings structure 75' long, 40' wide and 20' tall. • Gymnasium shall be fully insulated. • Structural supports for (6) basketball goals. • Installation of (6) basketball goals. • (2) sets of double doors. • (1) roll up door. • LED lighting package with keyed switch and guards. • Emergency/exit lighting. • Fully operational fire alarm system to be compatible with existing panel. • (2) 5-ton Trane RTU's with UV sanitizers. • Interior wall panels up to 10' AFF. Remove and dispose of existing HVAC units. • (4) Trane 14 seer 15 ton gas package units with new curb adapters. • (3) Trane 14 seer 10 ton gas package units with new curb adapters. • (1) Trane 14 seer 20 ton gas package unit with new curb adapters. • (1) new Trane 5 ton split system. • Remove, replace, and reconfigure ducting for 20 ton unit. • (1 each) UV lights per unit for mitigation of airborne contaminants. • New thermostats throughout building. • Clean and sanitize all existing duct work remaining in building. • Testing, balancing and new user orientation. • Demo and remove all existing acoustical tile ceilings in building. • Demo and remove all existing HVAC return and supply registers located in existing ceiling. • Demo and remove all existing lights and exit signs located in existing ceiling. • Fumigate and sanitize open ceiling areas after removal of ceiling, prior to new installations to mitigate any air born contaminants. . • New acoustical ceilings throughout building. • (300) new 2' X 4' LED light fixtures and (22) new exit lights with new switching at each location. • (195) new air condition and supply and return registers in new ceilings.