This Award Information document pertains to a Gym and Facility Upgrade Project in Georgia that has been awarded to Frontier Design-Build. The project encompasses the construction of a new gymnasium utilizing a Nucor American Buildings structure measuring 75 feet long, 40 feet wide, and 20 feet tall, with full insulation and structural supports for six basketball goals. The facility will include two sets of double doors, one roll-up door, LED lighting with keyed switches and guards, emergency and exit lighting, and a fully operational fire alarm system compatible with existing infrastructure. The HVAC scope includes installation of two 5-ton Trane RTUs with UV sanitizers, four 15-ton gas package units, three 10-ton gas package units, one 20-ton gas package unit, and one 5-ton split system, all featuring 14 SEER ratings and new curb adapters. Additional work includes interior wall panels up to 10 feet above finished floor, removal and disposal of existing HVAC units, UV lights per unit for airborne contaminant mitigation, new thermostats throughout the building, and complete duct work cleaning and sanitization with testing and balancing services.
The project also requires comprehensive ceiling and electrical work, including demolition and removal of all existing acoustical tile ceilings, HVAC registers, and lighting fixtures, followed by fumigation and sanitization of open ceiling areas to mitigate airborne contaminants prior to installation of new materials. The new ceiling installation will include 300 two-foot by four-foot LED light fixtures, 22 exit lights with individual switching at each location, and 195 new air condition supply and return registers integrated into the new acoustical ceilings. No specific pricing terms, set-asides, incumbent information, funding sources, or contract renewal options are detailed in this award information document.
Text of this file
PROJECT AWARDED, to Frontier Design-Build!! New gymnasium shall be Nucor � American Buildings structure 75� long, 40� wide and 20� tall. � Gymnasium shall be fully insulated. � Structural supports for (6) basketball goals. � Installation of (6) basketball goals. � (2) sets of double doors. � (1) roll up door. � LED lighting package with keyed switch and guards. � Emergency/exit lighting. � Fully operational fire alarm system to be compatible with existing panel. � (2) 5-ton Trane RTU�s with UV sanitizers. � Interior wall panels up to 10� AFF. Remove and dispose of existing HVAC units. � (4) Trane 14 seer 15 ton gas package units with new curb adapters. � (3) Trane 14 seer 10 ton gas package units with new curb adapters. � (1) Trane 14 seer 20 ton gas package unit with new curb adapters. � (1) new Trane 5 ton split system. � Remove, replace, and reconfigure ducting for 20 ton unit. � (1 each) UV lights per unit for mitigation of airborne contaminants. � New thermostats throughout building. � Clean and sanitize all existing duct work remaining in building. � Testing, balancing and new user orientation. � Demo and remove all existing acoustical tile ceilings in building. � Demo and remove all existing HVAC return and supply registers located in existing ceiling. � Demo and remove all existing lights and exit signs located in existing ceiling. � Fumigate and sanitize open ceiling areas after removal of ceiling, prior to new installations to mitigate any air born contaminants. . � New acoustical ceilings throughout building. � (300) new 2� X 4� LED light fixtures and (22) new exit lights with new switching at each location. � (195) new air condition and supply and return registers in new ceilings.
NIGP Codes
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .