The City of Roseburg Public Works Department is soliciting bids on an extension of the city's storm water conveyance system in Douglas County, Oregon under Project #24PW11, with bids due June 25, 2026 at 2:00 p.m. at City Hall, 900 SE Douglas Avenue. All bidders must be pre-qualified with the Oregon Department of Transportation at least ten days prior to bid opening and must hold a valid Construction Contractors Board license.

The scope includes installation of curb, gutters, six manholes, four catch basins, and 12-inch storm pipe with associated appurtenances; furnishing, installation, and removal of temporary traffic control and erosion control measures; and alternates for either conventional trenching or directional drilling in deep-section pipe installation (approximately 11 feet) where rock is expected. Construction duration is 60 calendar days after notice to proceed, with all work completed by October 31, 2026.

Oregon Prevailing Wage Law (ORS 279C.800-279C.870, effective April 5, 2026) applies; workers are paid at the higher of prevailing wage or the federal Davis-Bacon Act rate. Contractors must have an employee drug testing program in place and file a $30,000 Public Works Bond with the Construction Contractors Board before beginning work. Contractors with 50 or more employees on contracts exceeding $500,000 must provide proof of pay equity compliance training. A bid bond equal to 10% of the total bid amount is required. First-tier subcontractor disclosure forms are due by 4:00 p.m. on June 25, 2026. Liquidated damages of $500 per day apply for failure to meet the completion deadline. Technical questions should be directed to Jesten Brenner, PE, City Project Engineer, at (541) 492-6730 or jbrenner@roseburgor.gov.

Opportunity text

Project Description: The proposed work consists of furnishing all labor, equipment, and materials for the installation of an extension of the Citys storm water conveyance system. Project includes the installation of curb, gutters, six manholes, four (4) catch basins, 12-in storm pipe, and other associated appurtenances. In a deep section of storm pipe installation (+/-11 feet) where rock is expected, alternates will be provided for either conventional trenching installation, or for directional drilling. Other tasks required may include: Furnish, install and remove temporary traffic control devices and temporary erosion control measures.