Bid Notice-Grandview Ave. Storm Water Improvements.pdf

PDF 2 MB Posted

Attached to
Grandview Ave. Storm Water Improvements
Solicitation number
24PW11
Issued by
Douglas County, Oregon

About this file

Summary: Bid Notice for Grandview Ave. Storm Water Improvements

This is a bid notice and contract document package issued by the City of Roseburg Public Works Department in Douglas County, Oregon, for the construction of stormwater infrastructure improvements (Project #24PW11). The project involves furnishing all labor, equipment, and materials for installing an extension of the city's storm water conveyance system, including curbs, gutters, six manholes, four catch basins, and 12-inch diameter storm pipe with associated appurtenances. The work also encompasses temporary traffic control devices and erosion control measures. Bids are due by 2:00 p.m. on Thursday, June 25, 2026, with bid opening at the same time at City Hall, 900 SE Douglas Avenue, Roseburg, Oregon 97470. First-tier subcontractor disclosure forms must be submitted by 4:00 p.m. the same day. The construction duration is 60 calendar days after the contractor receives the notice to proceed, with all work to be completed no later than October 31, 2026. Technical questions should be directed to Jesten Brenner, PE, the City's Project Engineer, at (541) 492-6730 or jbrenner@roseburgor.gov.

Bids will be evaluated on a unit price basis for the base bid plus either Alternate A (conventional trenching for deep pipe installation) or Alternate B (horizontal directional drilling). A bid bond equal to 10% of the total bid amount is required. All bidders must be pre-qualified with the Oregon Department of Transportation at least ten days prior to bid opening and must hold a valid Construction Contractors Board license. The project is subject to Oregon Prevailing Wage Law (ORS 279C.800-279C.870) effective April 5, 2026, and potentially the federal Davis-Bacon Act, with workers paid at the higher applicable rate. Contractors must have an employee drug testing program in place and file a $30,000 Public Works Bond with the Construction Contractors Board before beginning work. Contractors with 50 or more employees on contracts exceeding $500,000 must provide proof of pay equity compliance training. Liquidated damages of $500 per day apply for failure to complete the project within the specified timeframe. The City reserves the right to reject any or all bids and may cancel the invitation in accordance with Oregon Administrative Rules.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DOCUMENTS

FOR THE

CONSTRUCTION OF

Grandview Ave. Storm Water Improvements

Project # 24PW11

THE CITY OF

ROSEBURG

TIMBER CAPITAL OF THE NA

CITY OF ROSEBURG

PUBLIC WORKS DEPARTMENT

DOUGLAS COUNTY, OREGON

PROFESSIONAENGINEERCG

IS

TE

RE

D

83682 RE

PREPARED BY:

Jesten Brenner, PE

City of Roseburg

900 SE DOUGLAS AVE.

Roseburg, OR 97470

541-492-6730

OREGON

JESTEN D. BRENNER

JULY 11, 2017

EXPIRES 12-31-2027

Page 1 – (Prevailing Wage Projects) Revised 05/2026

TABLE OF CONTENTS

ADVERTISEMENT FOR BID

INVITATION TO BID

INFORMATION TO BIDDERS

BIDDER'S CHECK LIST

BID FORM

STANDARD BID BOND

FIRST TIER SUBCONTRACTOR DISCLOSURE FORM INSTRUCTIONS

FIRST TIER SUBCONTRACTOR DISCLOSURE FORM

EMPLOYEE DRUG TESTING PROGRAM

PAY EQUITY COMPLIANCE TRAINING

PUBLIC WORKS BOND - PRE-BID NOTICE AND CERTIFICATION

CONSTRUCTION CONTRACT

STANDARD CONTRACT PROVISIONS

PUBLIC WORKS BOND FILING CERTIFICATION

STANDARD PERFORMANCE BOND

PAYMENT BOND

LOWEST BIDDER RESPONSIBILITY DETERMINATION FORM

PREVAILING WAGE RATES FOR PUBLIC WORKS CONTRACTS

GENERAL CONDITIONS

TECHNICAL PROVISIONS

DESIGN DRAWINGS

ODOT STANDARD DRAWINGS

Page 2 – (Prevailing Wage Projects) Revised 05/2026

CITY OF ROSEBURG

ADVERTISEMENT FOR BID

Project Name: Grandview Ave. Storm Water Improvements Project Number: 24PW11 Project Description: The proposed work consists of furnishing all labor, equipment, and materials for the installation of an extension of the City’s storm water conveyance system.

Project includes the installation of curb, gutters, six manholes, four catch basins, 12-in storm pipe, and other associated appurtenances. Construction duration is 60 days.

Bids are due by 2:00 p.m. on Thursday June 25, 2026 All bids will be opened at 2:00 p.m.

Additional forms disclosing first tier subcontractors are due by 4:00 p.m.

No bids shall be received after this date and time.

Contact – Submit bids to: Address Technical Questions to:

City of Roseburg City Recorder Jesten Brenner, PE 900 SE Douglas City of Roseburg Project Engineer Roseburg OR 97470 900 SE Douglas Ave.

(541) 492-6866 Roseburg, OR 97470 bids@roseburgor.gov (541) 492-6730 jbrenner@roseburgor.gov

SOLICITATION DOCUMENTS: Solicitation documents, including contract terms, conditions, specifications, all attachments and/or addenda for the Invitation to Bid are available for review at the above contact address. Bid documents will not be mailed to prospective bidders, but may be downloaded from OregonBuys through the following internet address:

https://www.oregon.gov/das/Procurement/Pages/oregonbuys.aspx. Bidders without access to OregonBuys may download the documents at a Plan Center or the City of Roseburg’s website at www.cityofroseburg.org under “Bidding Opportunities.”

Bidders must be pre-qualified in accordance with the laws of Oregon and the Information to Bidders at least ten days prior to the date of bid opening. Bidders must be licensed with the Oregon Construction Contractors Board and comply with City of Roseburg Municipal Code.

The resulting public works contract is subject to ORS 279C.800 to 279C.870 or the Davis- Bacon Act (40 U.S.C. 3141 to 3148). No bid will be considered unless the bid contains a statement that the bidder will comply with the provisions of ORS 279C.840 (Prevailing Wage Rates).

Page 3 – (Prevailing Wage Projects) Revised 05/2026

INVITATION TO BID

The City of Roseburg will receive sealed bids or bids submitted via email marked "Bid for Grandview Ave. Storm Water Improvements, Project # 24PW11 " until the hour of 2:00 p.m.

on Thursday June 25, 2026, at which time they will be publicly opened and read in person or virtually. If opened virtually, a link will be posted on the City’s website at https://www.cityofroseburg.org/bidding no later than 24 hours prior to the opening. When required by ORS 279C.370, bidders must submit a list of their first-tier subcontractors providing labor, or labor and materials, no later than 4:00 p.m. that same day. Bids shall be addressed and delivered to Amy Nytes, City Recorder, City Hall, 900 SE Douglas Avenue, Roseburg, Oregon 97470, or emailed to bids@roseburgor.gov. Any and all bids received after the 2:00 p.m. deadline for submission, or for which the list of first-tier subcontractors has not been submitted by 4:00 p.m. that same day, shall be considered non-responsive and returned to the bidder. All bidders must list their "Construction Contractors Board" or “State Landscape Contractors Board” license number as required by ORS 701.021 or 671.530 on the bid form.

The proposed work consists of furnishing all labor, equipment, and materials for the installation of an extension of the City’s storm water conveyance system. Project includes the installation of curb, gutters, six manholes, four catch basins, 12-in storm pipe, and other associated appurtenances. In a deep section of storm pipe installation (+/-11 ft) where rock is expected, alternates will be provided for either conventional trenching installation, or for directional drilling. Other tasks required may include, but are not limited to:

1. Furnish, install and remove temporary traffic control devices and temporary erosion control measures.

2. Perform additional and incidental Work as called for by the Specifications and Plans

The bids will be evaluated as unit price pursuant to OAR 137-049-0380(2)(b). The proposed work will require the bidder to meet the highest standards prevalent in the industry or business related to the work to be performed. Failure to meet such standards may result in a reduction or withholding of payment; require bidder to provide, at bidder’s own expense, additional work required to meet such standards; or termination of the contract, with damages being sought.

Technical questions regarding the work to be performed should be addressed to:

Jesten Brenner, PE 900 SE Douglas Ave.

Roseburg, OR 97470

(541) 492-6730 jbrenner@roseburgor.gov

Bids must be accompanied by a certified check, cashier's check, irrevocable letter of credit or Bid Bond in an amount equal to not less than ten percent (10%) of the total amount of the bid.

Bidders shall state as part of the bid that the provisions of ORS 279C.800 to 279C.870 (Prevailing Wage Rates) shall be complied with; provided however, if the project is subject to the federal prevailing rates of wage under the Davis-Bacon Act (40 U.S.C. 3141 et seq.) or if the project is subject to both the state and federal prevailing rates of wage, the bid must contain a statement by the bidder that contractor and every subcontractor shall pay the higher of the applicable state or federal prevailing rate of wage to all workers on the project. Bidders must also certify as part of the bid that the requirements of ORS 279C.505(2) (Employee Drug Testing Program) shall be complied with. Bidders must be pre-qualified in accordance with the

Page 4 – (Prevailing Wage Projects) Revised 05/2026 laws of Oregon and the Information to Bidders. Each bid must contain a statement as to whether the bidder is a resident bidder, as defined in ORS 279A.120. Bidders are not required to be licensed under ORS 468A.720 (Asbestos Abatement). However, the successful bidder shall at all times during the project provide qualified staff on site that is able to identify asbestos containing material. Bidders are hereby notified there are underground pipelines and structures containing asbestos within the City of Roseburg. If any such material is encountered during the project, the bidder shall thereupon be required to notify the City and comply with all requirements of applicable laws and regulations. Unless exempt under ORS 279C.800 to 279C.870, the successful bidder must file a $30,000 Public Works Bond with the Construction Contractors Board prior to beginning work on the project, and certify that all sub-contractors have also filed such bond. Bidders must agree to use recyclable products to the maximum extent financially feasible. Bidders with 50 or more employees and for contracts over $500,000, are required to possess a certificate issued by the Department of Administrative Services for completion of pay equity training (NEW).

The City of Roseburg may reject any bid not in compliance with all public bidding procedures and requirements, including the requirement to demonstrate the bidder’s responsibility under ORS 279C.375(3)(b), may waive any irregularities, and may reject for good cause any or all bids upon a finding of the City it is the public interest to do so. The City may also cancel this invitation in accordance with OAR 137-049-0270.

Dated this 29th day of May, 2026

CITY OF ROSEBURG, DOUGLAS COUNTY, OREGON

/s/ Amy Nytes, City Recorder

Page 5 – (Prevailing Wage Projects) Revised 05/2026

INFORMATION TO BIDDERS

1. FORM OF BID

All bids must be made upon the blank Bid Form attached hereto and must give a price for each item and an aggregate amount or a lump sum price as required in the Bid Form.

The City reserves the right to reject any or all bids or to accept the bid deemed in the best interest of the City. Without limiting the generality of the foregoing, the City may reject any bid which is incomplete, obscure or irregular; which omits any one or more items in the price sheet; in which unit prices are obviously unbalanced; or which is accompanied by an insufficient or irregular Bid Bond.

The bidder shall sign the Bid Form in the blank space provided therefore. All bids must contain the bidder’s tax identification number. Bids made by a corporation, general or limited partnership, or L.L.C., shall contain the name and address of such organization, together with names and addresses of officers, partners or managing members. If the bid is made by a corporation, it must be signed by one of the corporate officers with the authority to sign for the corporation; if made by a partnership, by one of the partners.

All bids must be submitted at the time and place, and in the manner prescribed in the Invitation to Bid.

2. BID PROTEST; REQUEST FOR CHANGE OR CLARIFICATION

A bidder may protest, or request a change in items in the bid documents, including contract terms and conditions or specifications, by filing a written protest with the City not less than ten (10) calendar days prior to the bid submission deadline. Such written protest or request for change must include a detailed statement of the grounds for the protest and a statement of the desired changes to the contract terms and conditions or specifications.

The City shall not consider a bidder’s protest or request for change after the deadline for submitting such protest or request. The City shall provide notice to the bidder if it entirely rejects the bidder’s protest or request for change. If the City agrees with the bidder’s protest or request, in whole or in part, the City shall issue a written Addendum to the bid documents or specifications.

Prior to the deadline for submitting a written protest or request for change, a bidder may request that the City clarify any provision of the bid documents. The City’s clarification to a bidder, whether orally or in writing, shall not change the bid documents and is not binding on the City unless the City amends the bid documents by issuing a written addendum.

If a written addendum is issued by the City, all bidders must provide written acknowledgement, with their bids, of receipt of all issued addenda.

Page 6 – (Prevailing Wage Projects) Revised 05/2026

3. CONTRACT DOCUMENTS

The Contract Documents for this Project consist of, but are not necessarily limited to, the Invitation to Bid, Information to Bidders, Bid Form, Construction Contract including Exhibit “A” Standard City Contract Provisions, First-Tier Subcontractor Disclosure Form, Drug Testing Program Certification Form, Bidder’s Responsibility Form, Performance Bond, Payment Bond, Public Works Bond Filing Certification form (when required), Pay Equity Compliance Certification (when applicable), General Conditions, Technical Provisions, Special Conditions, Standard Drawings, Specifications and Plans and Supplemental Specifications, all as required for the full execution and satisfactory completion of the Project. Any person contemplating the submission of a bid and being in doubt as to the meaning or intent of said Contract Documents should request of the City, in writing, an interpretation thereof. Any interpretation of said Contract Documents shall be made only in writing by the City.

4. ESTIMATE OF QUANTITIES

The estimate of quantities of work to be done as stated in the Bid Form, although stated with as much accuracy as possible, is approximate only and is assumed solely for the purpose of comparing bids. The quantities on which payments will be made to the Contractor are to be determined by measurement of the work actually performed and paid at the unit price bid, regardless of the amount of increase or decrease in the estimated quantities as specified in the Contract Documents. The City reserves the right to increase or diminish the amount of any class of work as may be deemed necessary.

5. CONSTRUCTION CONTRACTORS' BOARD - STATE LANDSCAPE

CONTRACTORS’ BOARD

All contractors bidding on public contracts must be licensed with the Construction Contractors' Board or the State Landscape Contractors Board as required by ORS

701.021 or 671.530. Bids must be identified with the Contractors' Board license number.

No bids will be considered without this information.

6. DISCLOSURE OF FIRST-TIER SUBCONTRACTORS

When a public improvement contract value is greater than $100,000, all bidders are required to disclose information about first-tier subcontractors, providing labor or labor and materials, when the contract amount of such first-tier subcontractor is equal to or greater than:

1) 5% of the project bid, or $15,000, whichever is greater; or

2) $350,000 regardless of the percentage of the total bid.

Bidders must disclose the following information about such subcontracts, on the First- Tier Subcontractor Disclosure Form provided by the City and included herein, within two hours of the bid submission deadline:

1) The subcontractor’s name;

Page 7 – (Prevailing Wage Projects) Revised 05/2026

2) The subcontract dollar value; and

3) The category of work to be performed by the subcontractor.

Any bidder not using subcontractors subject to the above disclosure form, must write “NONE” on the Disclosure Form and sign and submit the form. The City will reject a bid if the bidder fails to submit the Disclosure Form before the deadline.

7. DRUG TESTING PROGRAM

ORS 279C.505(2) requires public improvement contracts to include a provision requiring contractors to demonstrate that they have an employee drug and alcohol testing program in place. All bidders are required to certify, on the Drug Testing Program Certification Form provided by the City and included herein, that they have such program in place. This certification will become part of the Contract if awarded and contractor will be required to maintain such program throughout the performance of the Contract.

Failure to maintain a program shall constitute a material breach of the Contract.

8. PROMPT PAY POLICY - TIMELY PROGRESS PAYMENTS

ORS 279C.570 and 279C.580 require prompt payment to contractors and subcontractors and provides for settlement of compensation disputes between the parties. The City is required to automatically calculate and pay interest on invoices from the contractor when payments become overdue. The interest commences thirty (30) calendar days after receipt of the invoice from the contractor, or fifteen (15) calendar days after the payment is approved by the City, whichever is earlier. The rate of interest charged to the City on the amount due shall equal three times the discount rate on 90-day commercial paper, but shall not exceed 30 percent.

The City is also required to ensure that the contractor includes a clause in each subcontract that obligates the contractor to pay first-tier subcontractors for satisfactory performance under its contract. Contractors must pay subcontractors within ten (10) calendar days of receiving payment from the City. Contracts between primary contractors and subcontractors must also contain an interest penalty clause that obligates the contractor, if payment is not made to the subcontractor within thirty (30) calendar days after receipt of payment from the City, to pay the first-tier subcontractor an interest penalty on amounts due in the case of each payment not made in accordance with the subcontract payment clause. The contractor is also required to ensure that first-tier subcontractors include these requirements in each of its subcontracts with lower-tier subcontractors or suppliers.

If requested in writing by a first-tier subcontractor, within ten (10) calendar days after receiving the request, the contractor must provide the first-tier subcontractor, a copy of that portion of any invoice or request for payment submitted to the City, or pay document provided by the City to the contractor, specifically related to any labor or materials supplied by the first-tier subcontractor.

9. PRE-QUALIFICATION OF BIDDERS

Page 8 – (Prevailing Wage Projects) Revised 05/2026

Bidders shall pre-qualify under ORS 279C.430 and 279C.435, by completing the Oregon Department of Transportation (ODOT) Prequalification Application online at:

https://www.oregon.gov/odot/business/procurement/pages/bid_award.aspx Proof of prequalification shall be submitted to the City at least ten (10) calendar days prior to the date of bid opening.

10. BID BOND, PUBLIC WORKS BOND, PAYMENT BOND AND PERFORMANCE BOND

A Bid Bond, Public Works Bond Filing Certification, Payment Bond and Performance Bond shall be provided as specified in Subsection 5.4 of the General Conditions. No waivers, special requirements or emergency provisions have been established for this Contract.

11. PAY EQUITY COMPLIANCE CERTIFICATION (NEW)

ORS 279A.167 requires businesses with fifty (50) or more employees, and a contract valued at more than $500,000, to provide proof they are properly trained on Oregon’s pay equity laws. A certificate proving the contractor has completed the training shall be provided as specified in Subsection 26 of the “Bid Form”.

12. HIGHEST STANDARDS OF WORK AND CONSEQUENCES FOR FAILURE

The work to be performed must meet the highest standards prevalent in the industry or business most closely related to the work to be performed. Failure to meet such standards may result in consequences including, but not limited to a reduction or withholding of payment; a requirement that bidder perform, at bidder’s own expense, additional work required to meet such standards; or termination of the contract, with damages being sought.

13. CONDITIONS OF WORK

Bidders must make their own determination of the nature of the work proposed under this Contract, the local conditions which can be encountered in this area, and all other matters which can in any way affect the work proposed under this Contract. It shall also be the bidder's responsibility to be thoroughly familiar with the Contract Documents.

Failure to make the examination necessary for this determination or to examine any form, instrument or document of the Contract shall not release the bidder from the obligations of this Contract.

14. REVIEW OF BIDS; BASIS FOR AWARD; NOTICE OF INTENT TO AWARD; AND

RIGHT TO PROTEST AWARD

In reviewing all bids received and determining the lowest responsible bidder, the City reserves the right to take into account and give reasonable weight to the extent of the bidder's experience on work of the nature involved, on the bidder's record as to dependability in carrying out of contracts, and evidence of present ability to perform the Contract in a satisfactory manner.

Page 9 – (Prevailing Wage Projects) Revised 05/2026

The City may make such investigations as deemed necessary to determine the ability of the bidder to perform the work, and the bidder shall furnish to the City all such information and data for this purpose as the City may request. The City reserves the right to reject any bid if the evidence submitted by, or investigation of, such bidder fails to satisfy the City that such bidder is properly qualified to carry out the obligations of the Contract, to complete the work contemplated therein, and to do so in a timely manner.

The City specifically reserves the right to reject a bid from a bidder who, at the time bids are opened, has failed to complete work in a timely manner under a contract previously awarded to the bidder by the City. Conditional bids will not be accepted.

In accordance with ORS 279A.120(2)(b), in determining the lowest responsible bidder, the City shall, for the purpose of awarding the Contract, add a percentage increase on the bid of a non-resident bidder equal to the percent, if any, of the preference given to that bidder in the state in which the bidder resides.

Within forty-five (45) calendar days after the bid opening, the City will accept one of the bids or reject all of the bids received. If the City intends to accept one of the bids, it shall issue a Notice of Intent to Award the Contract to all bidders. The City’s award will not be final until seven (7) calendar days after the date of the notice if no protest is filed; or if a protest is filed, until the City provides a written response to all timely-filed protests that denies the protest and affirms the award.

A bidder may submit a formal written protest to the City’s Notice of Intent to Award the Contract within seven (7) calendar days of the date of the City’s Notice of Intent. The written protest must specify the grounds upon which the protest is based and must show that the protesting party is an adversely affected or aggrieved bidder. A bidder is adversely affected or aggrieved only if the bidder is eligible for award of the Contract as the responsible bidder submitting the lowest responsible bid, is next in line for award and claims that all lower bidders are ineligible for award in accordance with law.

Such protest must be submitted to the City Recorder, 900 SE Douglas, Roseburg, OR 97470 or by email at info@roseburgor.gov. Any protest received after the 7-day deadline will not be considered. The City Recorder shall forward such protest to the City Manager who shall have the authority to settle or resolve the protest by written decision.

15. EXECUTION OF CONTRACT, BONDS AND DAMAGES FOR FAILURE TO

EXECUTE

The bidder whose bid is accepted will be required to appear within ten (10) calendar days after notice that the Contract has been awarded to bidder and to execute the Contract with the City for the full and complete performance of all work specified, and as required by Subsection 5.4 of the General Conditions, deliver the Public Works Bond Filing Certification form, the Payment Bond to assure payment of the obligations incurred in the performance of the Contract and the Performance Bond and to ensure performance of the Contract.

Should the successful bidder fail or refuse to execute the Contract and furnish the Public Works Bond Filing Certification form, Payment Bond and/or Performance Bond when

Page 10 – (Prevailing Wage Projects) Revised 05/2026 required, then the Bid Bond deposited by said bidder shall be retained by the City as liquidated damages.

16. COMMENCEMENT DATE AND EXPIRATION DATE OF CONTRACT

This Contract shall be in effect from the time the Contract is signed until the Project is completed. The Contractor must be capable of commencing construction on the work contemplated in the Contract Documents within ten (10) calendar days after the execution of the Contract and receipt of the City's notification to proceed and shall complete the same within the time specified in the bid.

17. DURATION OF BIDS; RETURN OF BID BONDS

All bids will be binding until the later of:

1) the day the contract is executed; or

2) sixty (60) calendar days after the date of bid opening.

Bid bonds will be returned to unsuccessful bidders not later than the date on which the bids are no longer binding.

18. PUBLIC RECORDS

These Contract Documents and each bid received in response to it, together with copies of documents pertaining to the award of a contract shall be kept on file as a public record by the City Recorder; provided however, such records shall not be disclosed until after the notice of intent to award the contract has been issued.

19. RECORDS REVIEW; CONFIDENTIALITY

After notice of intent to award the resulting contract has been issued, all bids shall be available for public inspection except for those portions of a bid that the bidder designates in its bid as trade secrets or as confidential proprietary data in accordance with applicable state law. If the City determines such designation is not in accordance with applicable law, the City shall make those portions available for public inspection.

The bidder shall separate information designated as confidential from other non-confidential information at the time of submitting its proposal. Prices, makes, models or catalog numbers of items offered, scheduled delivery dates and terms of payment are not confidential, and shall be publicly available regardless of a bidder’s designation to the contrary.

20. MATERIALS CONTAINING ASBESTOS

Materials containing asbestos may be present in underground pipe systems. All appropriate Federal, State, County and Municipal rules, regulations and guidelines must be followed when working with asbestos containing material. Non friable material must be handled, transported and disposed of in a way that prevents it from becoming friable and releasing asbestos fibers. If AC pipe is shattered, damaged or badly weathered, it is considered to be friable and will likely release asbestos fibers. A DEQ licensed

Page 11 – (Prevailing Wage Projects) Revised 05/2026 asbestos abatement contractor using DEQ certified workers must remove all friable asbestos material. Any and all permits and fees that are required by the DEQ, Douglas County and any other regulatory agency must be obtained and paid for by the Contractor prior to disposing of the asbestos containing material. For information about asbestos rules, contact the DEQ Western Region office in Medford, Oregon.

Page 12 – (Prevailing Wage Projects) Revised 05/2026

BIDDER'S CHECK LIST

Bidder's attention is called to the following forms, which must be executed in full as required with the bid:

A. BID FORM(S): Each bidder shall complete the bid form(s). Prices must be shown in the spaces provided and must be expressed in figures.

B. BID BOND: This form is to be executed by bidder and bidder's Surety. The amount of cash, certified check, cashier's check, irrevocable letter of credit or Bid Bond shall not be less than 10% of the total Bid amount.

C. FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM: When required by law, this form must be submitted by the bid submission deadline, at which time bids will be opened and read, or within two (2) working hours of such submission deadline. If no subcontractors for labor or for labor and materials will be used, the bidder must write “NONE” on the disclosure form, sign and submit the form as required. Failure to submit this form within two hours of the bid submission deadline will result in the bid becoming non-responsive and such bid will be returned to the bidder.

D. DRUG TESTING PROGRAM CERTIFICATION FORM: This form must be submitted with the bid to demonstrate that bidder has an employee drug and alcohol testing program in place and will continue to keep the program in place throughout the duration of performing the Contract awarded.

E. PUBLIC WORKS BOND PRE-BID NOTICE & CERTIFICATION FORM: This form must be submitted with the bid to demonstrate contractor’s awareness of and intended compliance with the requirement to file a Public Works Bond with the Construction Contractors Board prior to beginning work on the project if awarded the bid.

F. PAY EQUITY COMPLIANCE CERTIFICATION FORM (NEW): If applicable pursuant to Section 11 of “Information for Bidders”, this form must be submitted with the bid to demonstrate contractor has completed required training regarding pay equity and the prohibition against discrimination in compensation or wage benefits.

The following forms are to be executed after the Contract is awarded, prior to beginning work on the project:

A. CONSTRUCTION CONTRACT: This agreement is to be executed by the successful bidder.

B. PERFORMANCE BOND AND PAYMENT BOND: Both a Performance Bond and a Payment Bond are to be executed by the successful bidder and bidder's Surety Company and submitted at the time the Contract is executed.

C. PUBLIC WORKS WAGE CERTIFICATION FORM: This form is to be completed in accordance with state law and submitted monthly during the duration of the contract, by the fifth business day of the following month, with request for payment.

D. CERTIFICATE OF INSURANCE: This certificate is to be executed by the successful bidder and bidder's insurance company and submitted at the time the Contract is executed.

E. PUBLIC WORKS BOND FILING CERTIFICATION: This form is to be executed by the successful bidder and submitted at the time the Contract is executed to certify if

Page 13 – (Prevailing Wage Projects) Revised 05/2026

Contractor has filed the required Public Works Bond or elected not to file the Bond due to qualifying under ORS 200.055.

Page 14 – (Prevailing Wage Projects) Revised 05/2026

BID FORM

City of Roseburg 900 SE Douglas Avenue Roseburg, Oregon 97470

The undersigned bidder has carefully examined the Contract Documents for the construction of the

Grandview Ave. Storm Water Improvements Project # 24PW11 referred to in the Invitation to Bid dated May 27, 2026, inviting bids on such Project and also the site of the Project. Bidder will provide all necessary labor, equipment, tools, apparatus and other means of construction, do all the work and furnish all the materials called for by said Contract Documents in the manner prescribed therein to provide a complete Project.

The undersigned bidder understands that the quantities of work as shown herein are approximate only, unless noted otherwise, and are subject to increase or decrease. The bidder offers to perform the work, at the unit price stated in the following schedule, whether the quantities are increased or decreased.

BASE BID:

Item Spec. Item Description Unit Qnty Unit Price (in figures)

Total Price (in figures)

1 00210 Mobilization LS 1

2 00221 Temporary Protection and Direction of Traffic LS 1

3 00280 Erosion Control LS 1

4 00305 Construction Survey Work LS 1

5 00310 Removal of Surfacings SY 370

6 00310 Removal of Curbs LF 25

7 00320 Clearing and Grubbing SY 140

8 00350 Sub-grade Geotextile SY 140

9 00405 Rock Excavation CY 100

10 00415 Mainline Video Inspection FOOT 975

11 00445 12 Inch, Corrugated HDPE Pipe, All Depth – Class B backfill LF 1015

12 00445 6 Inch, Corrugated HDPE Pipe, All Depth – Class B backfill LF 10

13 00445 Pipe Slope Anchor EA 2

14 00470 Concrete Manhole - Depth 5 - 10ft EACH 5

Page 15 – (Prevailing Wage Projects) Revised 05/2026

15 00470 Concrete Manhole - Depth 2.5 - 4.9ft

EACH 1

16 00470 Concrete Inlets - Type G1MA EACH 1

17 00470 Concrete Inlets - Type G1 EACH 2

18 00490 Connection to Existing Structures EACH 2

19 00495 Trench Resurfacing - Aggregate SY 50

20 00495 Trench Resurfacing - Temp Surfacing - Aggregate SY 370

21 00610 Aggregate Surfacing 3/4" to 1" Minus

TON 22

22 00610 Aggregate Surfacing 2" to 3" Minus TON 22

23 00744 Level 2, 1/2" Dense ACP Mixture TON 80

24 00759 Concrete Curbs, Standard Curb & Gutter LF 25

25 00759 Valley Gutter SF 575

26 00940 Signs, Storm Drainage Inlet Medallion EA 6

27 01020 Roadside Restoration LS 1

BASE BID TOTAL =

ALTERNATE A:

1A 00310 Removal of Surfacing SY 36

2A 00445 12 Inch, Corrugated HDPE Pipe, All Depth – Class B backfill – STA 1+81 to

STA 3+23

LF 145

3A 00744 Level 2, 1/2" Dense ACP Mixture TON 7

4A 00495 Trench Resurfacing - Aggregate SY 20

4A 00495 Trench Resurfacing - Temp Surfacing - Aggregate SY 36

5A 00405 Rock Excavation CY 230

ALTERNATE A TOTAL =

ALTERNATE B:

1B 00406 Horizontal Directional Drill - 12" ID HDPE STA 1+81 to STA 3+23

LS 1

ALTERNATE B TOTAL =

Page 16 – (Prevailing Wage Projects) Revised 05/2026

*Abbreviations (Add other abbreviations as required for the project):

LS – Lump Sum CY – Cubic Yard EA – Each

LBS – Pounds LF – Lineal Feet IN – Inches

SY – Square Yard TONS – Tons

BIDS WILL BE EVALUATED ON THE BASE BID PRICE PLUS EITHER ALTERNATE A OR

ALTERNATE B. THE ORDER OF THE SCHEDULES LISTED ABOVE DOES NOT REPRESENT

THE ORDER IN WHICH ANY OF THESE SCHEDULES MAY BE CHOSEN.

SCHEDULES LISTED IN THE BID FORMS WILL BE REVIEWED AND ACCEPTED OR

REJECTED AT THE OWNERS OPTION. ACCEPTED SCHEDULES WILL BE IDENTIFIED IN

THE CONSTRUCTION CONTRACT.

The undersigned also declares and agrees as follows:

1. That the only persons or parties interested in this bid are those named herein, that the bid is in all respects fair and without fraud, and that it is made without any connection or collusion with any person making another bid on this Contract.

2. That the bidder, and any subcontractor upon which the bidder is relying, have carefully examined and had an opportunity to comment on, the Contract Documents for the construction of the proposed improvements including a full set of the plans and specifications, including all addenda thereto; that bidder has personally inspected the contemplated construction area or areas; that bidder is satisfied as to the adequacy and completeness of the plans and specifications, the feasibility of the work described therein, quantities of materials, items of equipment and conditions of work involved, including the fact that the description of work and materials as included herein are approximate only; and that this bid is made according to the provisions and under the terms of the Specifications which are hereto attached and hereby made a part of this bid.

3. All of the Specifications and Plans which are listed herein have been examined by the undersigned bidder and the terms and conditions thereof are hereby accepted.

4. It is understood that the Plans may be supplemented by additional Drawings and Specifications in explanation and elaboration of the Plans and it is agreed that such Supplemental Drawings, when not in conflict with those referred to in Paragraph 3 above, will have the same force and effect as if completed and attached hereto, and that when received, will be considered a part of the Contract Documents.

5. It is understood that all work will be performed under the price schedule outlined herein and that all services, materials, labor and equipment and all work necessary to complete the Project in accordance with the Plans and Specifications shall be furnished for the prices named in the bid. If there is a change in the scope of work or work which cannot be properly classified under the price schedule then bidder agrees to do this work as "extra work". The undersigned bidder agrees to do any extra work and furnish materials, Page 17 – (Prevailing Wage Projects) Revised 05/2026 and to accept as full compensation therefore at such prices as may be agreed upon in writing by the City and the Contractor before extra work begins. Each party binds itself to agree to reasonable prices.

6. It is understood the work to be performed must meet the highest standards prevalent in the industry or business most closely related to the work to be performed. It is further understood that failure to meet such standards may result in consequences including, but not limited to, a reduction or withholding of payment; a requirement that bidder perform, at bidder’s own expense, additional work required to meet such standards; or termination of the contract, with damages being sought.

7. The bidder agrees that if this bid is accepted, the bidder will, within ten (10) calendar days after the notification of acceptance, execute the Construction Contract with the City in the form of Contract specified, and will, at the time of execution of the Contract, deliver to the City the Performance Bond, Payment Bond and Public Works Bond Filing Certification form as required herein, and will furnish all the materials necessary to complete the Project in the manner, in the time and according to methods as specified in the Specifications and required by the City.

8. The cash, certified check, cashier's check, irrevocable letter of credit or Bid Bond shall be payable to the City to the extent of 10% of the amount of the bid in case this bid is accepted by the City and the undersigned shall fail or refuse to execute the Contract and furnish a Payment Bond, a Performance Bond or the Public Works Bond Filing Certification form as required by the Specifications within the time limit named therein after notification that said bid is accepted, all in accordance with the provisions of this bid and the Plans and Specifications which are a part hereof.

9. All items for the Contract for which forms are provided herein have been completed in full by the showing of prices for each and every item thereof, and for the showing of other information indicated by the Bid Form.

10. The Contractor agrees that the work under this Contract shall be completed within Sixty

(60) calendar days after construction related work has begun. Construction related work includes potholing, saw cutting, traffic control and excavation activities. Work shall be completed no later than October 31, 2026.

11. In the event the bidder is awarded the Contract and fails to complete the Project within the time limit or extended time agreed upon, as more specifically set forth in the General Conditions, liquidated damages shall be paid to or withheld by the City pursuant to Paragraph 4 of the Construction Contract (Time of Performance - Liquidated Damages) at the rate of five hundred dollars ($ 500) per day, until the Project has been completed as provided in the General Conditions.

12. The undersigned bidder hereby states, as part of this bid, that the applicable provisions of Oregon’s Prevailing Wage Law (ORS 279C.800 to 279C.870) and the Federal Prevailing Wage Law (Davis-Bacon Act, 40 U.S.C. 3141-3148), shall be complied with.

When the Project is subject to both the State and Federal Prevailing Wage Laws and rates, workers in each trade will be paid the higher of the two rates.

Page 18 – (Prevailing Wage Projects) Revised 05/2026

13. The undersigned bidder and bidder's subcontractors shall comply with ORS 656.017, which requires them to provide Workers' Compensation coverage for all their subject workers.

14. The undersigned bidder hereby states, as part of this bid, that bidder shall comply with

ORS 279C.505(2) which requires bidder to have an employee drug testing program in place.

15. The undersigned bidder and bidders’ subcontractors shall comply with ORS 279C.570 and 279C.580, which require timely progress payments for public improvement projects and provide interest penalties for late payment.

16. The undersigned bidder hereby states, as part of this bid, bidder and bidder's subcontractors shall comply with the provisions of Exhibit "A" - "Standard City Contract Provisions".

17. If applicable pursuant to Section 11 of “Information for Bidders”, the undersigned bidder hereby states, as part of this bid, that bidder has completed pay equity compliance training and received a certificate of completion from the Oregon Department of Administrative Services.

18. If the bidder is awarded the Contract for this work, the name and address of the Surety who will provide the Payment Bond, Performance Bond and Public Works Bond (if required) will be: .

19. The name and address of the bidder who is submitting this bid is:

, which is the address to which all communications pertinent to this bid and the Contract shall be sent. The bidder’s email address is: .

20. The names of the principal officers of the corporation submitting this bid or of the partnership, or of all parties interested in this bid as principals are as follows:

21. The undersigned bidder acknowledges that Addenda No. through have been delivered to bidder and have been examined as part of the Contract Documents.

22. In the prosecution of this work, the bidder proposes to use the subcontractors listed on the First-Tier Subcontractor Disclosure Form presented within two working hours of the bid submission deadline as set forth in the Invitation to Bid. Any bidder not using subcontractors subject to the above referenced Disclosure Form shall indicate “NONE” on the Disclosure Form and sign and submit the form as required.

23. Declaration of Residency: I "am" or "am not" (circle one) a "resident bidder"* as defined by ORS 279A.120, a contractor that has paid unemployment taxes or income taxes in Oregon during the 12 calendar months immediately preceding submission of the bid, has a business address in this state and has stated in the bid whether the bidder is a "resident bidder" pursuant to ORS 279A.120.

Page 19 – (Prevailing Wage Projects) Revised 05/2026

24. The bidder's Construction Contractors Board License Number or Landscape Contractors Board License Number is: .

25. Bidder’s Tax Identification Number: . Email: .

26. Public Works Bond: If the bid is accepted, prior to beginning work on the project, the bidder will file with the Construction Contractors Board, a Public Works Bond in the amount of $30,000 with a corporate surety authorized to do business in the State of Oregon; and before permitting a subcontractor to begin work on the project, the bidder will verify that the subcontractor has also filed the aforementioned bond. If the bidder, as a certified disadvantaged, minority, women or emerging small business enterprise, elects not to file the Public Works Bond, bidder will file written verification of such certification with the Construction Contractors Board and provide the Board and the City of Roseburg with notice of such election.

If sole Proprietor or Partnership:

In witness hereto, the undersigned as set his/her hand this day of , 2026.

Printed name of bidder:

Signature of bidder:

Title:

If Corporation:

In witness whereof, the undersigned corporation has caused this instrument to be executed and its seal affixed by its duly authorized officers this day of , 2026.

Name of Corporation:

Printed name of person signing:

Signature:

Title:

Attest:

Secretary

Page 20 – (Prevailing Wage Projects) Revised 05/2026

STANDARD BID BOND

We, , “as Principal,” (Name of Principal) and , an Corporation, (Name of Surety) authorized to transact Surety business in Oregon, as “Surety,” hereby jointly and severally bind ourselves, our respective heirs, executors, administrators, successors and assigns to pay unto the City of Roseburg (“Obligee”) the sum of ($ ) dollars.

WHEREAS, the condition of the obligation of this bond is that Principal has submitted its proposal or bid to an agency of the Obligee in response to Obligee’s procurement document (No.

) for the project identified as:

which proposal or bid is made a part of this bond by reference, and Principal is required to furnish bid security in an amount equal to ten percent (10%) of the total amount of the bid pursuant to the procurement document and ORS 279C.365(5) for competitive bidding or 279C.400(5) for competitive proposals.

NOW, THEREFORE, if the proposal or bid submitted by Principal is accepted, and if a contract pursuant to the proposal or bid is awarded to Principal, and if Principal enters into and executes such contract within the time specified in the procurement document and executes and delivers to Obligee its good and sufficient performance bond, payment bond and public works bond as required by Obligee within the time fixed by Obligee, then this obligation shall be void; otherwise, it shall remain in full force and effect.

IN WITNESS WHEREOF, we have caused this instrument to be executed and sealed by our duly authorized legal representatives this day of , 2026.

PRINCIPAL: SURETY:

By BY ATTORNEY-IN-FACT:

Signature

Official Capacity Name

Corporation Secretary Signature

Address

City State Zip

Phone Email

Page 21 – (Prevailing Wage Projects) Revised 05/2026

FIRST TIER SUBCONTRACTOR DISCLOSURE FORM INSTRUCTIONS

Instructions for First-Tier Subcontractor Disclosure:

Bidders are required to disclose information regarding certain first-tier subcontracts (ORS 279C.370). Specifically, when the contract amount of a first-tier subcontract furnishing labor or labor and materials would be great than or equal to: (1) 5% of the project bid, but at least $15,000; or (2) $350,000 regardless of the percentage, the bidder must disclose the following information about that subcontract either in its bids submission, or within two hours after bid closing:

(A) The subcontractor’s name;

(B) The category of work that the subcontractor would be performing; and

(C) The dollar value of the subcontract.

If the bidder will not be using any subcontractors that are subject to the above disclosure requirements, the bidder is required to indicate “NONE” on the accompanying form.

THE CONTRACTING AGENCY MUST REJECT A BID IF THE BIDDER FAILS TO SUBMIT

THE DISCLOSURE FORM WITH THIS INFORMATION BY THE STATED DEADLINE (OAR

137-049-0360).

* The subject form is on the following page.

Page 22 – (Prevailing Wage Projects) Revised 05/2026

FIRST TIER SUBCONTRACTOR DISCLOSURE FORM

PROJECT NAME:

BID#:

BID CLOSING: DATE: TIME:

This form must be submitted at the location or email specified in the Invitation to Bid on the advertised bid closing date and within two working hours after the advertised bid closing time.

List below: the name of each subcontractor that will be furnishing labor or labor and materials and is required to be disclosed, the category of work that the subcontractor will be performing and the dollar value of the subcontract. Enter “NONE” if there are no subcontractors that need to be disclosed. (ATTACH ADDITIONAL SHEETS IF NEEDED)

NAME OF

SUBCONTRACTOR

DOLLAR

VALUE

CATEGORY OF

WORK

Failure to submit this form by the disclosure deadline will result in a nonresponsive bid. A nonresponsive bid will not be considered for award.

Form submitted by (bidder name):

Contact name: Phone #:

Form Received in the City Recorder’s Office:

Time: Date: By:

Page 23 – (Prevailing Wage Projects) Revised 05/2026

EMPLOYEE DRUG TESTING PROGRAM

CERTIFICATION FORM

BIDDER’S NAME:

PROJECT NAME & NUMBER:

ORS 279C.505 (2) provides that every public improvement contract contain a condition that the Contractor shall demonstrate that an employee drug testing program is in place. The City’s award of the Contract for which this certificate is required is conditioned, in part, upon the Bidder’s demonstration of compliance with the provisions of ORS 279C.505(2). If the Bidder named above is awarded the Contract, this certificate shall become a part of, and shall constitute a continuing representation and warranty under, the Contract.

To induce the City to award the Contract to the Bidder, the undersigned, as the duly authorized representative of the Bidder, hereby represents and warrants, on behalf of the above named Bidder:

1. That Bidder has and enforces, and at all times during the term of the Contract will have and enforce, a written employee drug testing policy that at a minimum, requires compliance with the Oregon Department of Transportation Commercial Drivers License drug testing regulations;

2. A copy of the Bidder’s current written employee drug testing policy will be available for inspection by the City at any time upon the City’s request; and

3. The Bidder understands and agrees that its representations and warranties herein will become a continuing part of the Contract and that breach of any of the foregoing will be sufficient grounds for disqualification under 279C.440(2)(d).

The City shall not be liable, either directly or indirectly, in any dispute arising out of the substance or procedure of Bidder/Contractor’s drug testing program. Nothing in this drug testing provision shall be construed as requiring Bidder/Contractor to violate any legal, including constitutional rights of any employee, including but not limited to, selection of which employees to test and the manner of such testing. The City shall not be liable for Bidder/Contractor’s negligence in establishing or implementing, or failure to establish or implement, a drug testing policy, or for any damage or injury caused by Bidder/Contractor’s employees acting under the influence of drugs while performing work covered by the Contract.

These are Bidder/Contractor’s sole responsibilities.

In Witness whereof, the Bidder has caused this document to be executed by its duly authorized representative on the date shown below.

Signature:

Printed Name, Title:

Date:

Page 24 – (Prevailing Wage Projects) Revised 05/2026

PAY EQUITY COMPLIANCE TRAINING

CERTIFICATION FORM

(NEW)

BIDDER’S NAME:

PROJECT NAME & NUMBER:

ORS 279A.167(1) provides that the Oregon Department of Administrative Services shall establish a program to certify that a person that intends to submit a bid or proposal for a public contract understands the prohibition set forth in ORS 652.220 and in other laws or rules that prohibit discrimination in compensation or wage payments. Following completion of the course, a certificate of completion will be provided. This certification is recommended for ANY contractor in the state of Oregon, and required for any contractor who employs fifty (50) or more people, and for a contract valued at more than $500,000. Information on how to receive this certification can be found by clicking here.

To induce the City to award the Contract to the Bidder when the certification is required, the undersigned, as the duly authorized representative of the Bidder, hereby represents and warrants, on behalf of the above named Bidder:

1. That Bidder has completed the training on pay equity as outlined in ORS 652.220; and

2. A copy of the Certificate of Completion of the pay equity compliance training will be available for inspection by the City at any time upon the City’s request.

In Witness whereof, the Bidder has caused this document to be executed by its duly authorized representative on the date shown below.

Signature:

Printed Name, Title:

Page 25 – (Prevailing Wage Projects) Revised 05/2026

PUBLIC WORKS BOND - PRE-BID NOTICE AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .