Grading and Surfacing - RS 2039 Ottawa County
- The Kansas Department of Transportation is requesting sealed bids for grading, bridge, and surfacing work on K-68 from US-169 east 6.8 miles to 0.8 miles west of US-69 in Louisburg, Miami County, with bids due June 17, 2026. The project spans 6.678 linear miles and includes two bridge structures (Bridges 68-61-52.54 and 68-61-52.55), concrete and asphalt surfacing, drainage systems, guardrails, fencing, signing, pavement markings, lighting, traffic signals, intelligent transportation systems,...
- The Kansas Department of Transportation is requesting sealed bids for grading and surfacing work on RS 315 at the intersection of NW Carlson Road and NW Rossville Road in Shawnee County, with bids due June 17, 2026. The project encompasses 0.52 miles of roadway improvement. The scope involves standard grading and surfacing operations in compliance with Kansas Department of Transportation specifications and standards. Bidders must attend a pre-bid site visit and bidders' conference prior to...
- Kansas Department of Transportation is requesting bids on signing installation and maintenance at various locations on K-27, US-160, and US-400 across Hamilton, Greeley, Kearney, and Stanton Counties (93.5 miles total), with proposals due June 17, 2026 and the letting date also June 17 at 1:00 p.m. Local Time via Bid Express. Prequalified contractors only; KDOT will not accept paper bids. All bidders must hold a current Tax Clearance Certificate from the Kansas Department of Revenue at...
- The Kansas Department of Transportation is requesting proposals for the installation and setup of Continuously Operating Reference Stations (CORS) at 18 designated locations across Kansas, with proposals due June 17, 2026 at 1:00 p.m. local time and bid opening at 3:00 p.m. at the Eisenhower State Office Building in Topeka. KDOT has issued Addendum 1 (correcting a typographical error and introducing special provision 08-12-24-R01) and Addendum 2 (revising CORS unit cost requirements), both...
- The Kansas Department of Transportation is requesting bids for construction of pedestrian and bicycle paths totaling 4.352 miles in Osawatomie, Miami County, with proposals due June 17, 2026 at 1:00 p.m. Local Time via Bid Express. This is a federally and locally funded project (Federal Project TA-T052(901), State Project 061 TE 0529-01) subject to Davis-Bacon wage requirements and federal-aid construction contract provisions including Equal Employment Opportunity and nondiscrimination...
- The Kansas Department of Transportation is requesting sealed bids for grading, bridge, and surfacing work on US-77 in Cowley County spanning 8.805 miles from 1.86 miles north of the US-77/US-166 junction past South Winfield city limits to the south edge of the wearing surface of Walnut River Bridges #009 and #074, with bids due June 17, 2026. The scope includes grading, bridge work, and surfacing operations across the project corridor. Addendum 2, posted May 29, 2026, revises four required...
- The Kansas Department of Transportation is requesting proposals for an Intelligent Transportation System installation project on Interstate 35 southbound in Johnson County, with proposals due June 17, 2026 and project letting at 3:00 p.m. at the Eisenhower State Office Building in Topeka. Prequalified contractors only are eligible; all proposals must be submitted electronically through Bid Express no later than 1:00 p.m. local time on the letting date. The scope includes installation of...
- The Kansas Department of Transportation (KDOT) is soliciting bids for construction of pedestrian and bicycle paths totaling 0.433 miles on Main Street (North Railroad Avenue to Warren Avenue) and Russell Avenue (4th Street to 6th Street) in the City of WaKeeney, Trego County, with electronic proposals due June 17, 2026 at 1:00 p.m. local time and opening at 3:00 p.m. Contractors must be prequalified and submit electronic proposals via the Bid Express website using AASHTO's Project Bids software....
- The Oklahoma Department of Transportation is requesting sealed bids for asphalt resurfacing on State Highway 24 from 3.0 miles north of the SH-39 Junction extending east and north near Washington, with bids due June 11, 2026 at 10:30 a.m. The project spans 1.97 miles in Muskogee County and adjoining Welty CDP. The DBE goal is zero. Work includes machine grading (4,341 linear feet), cold milling pavement (20,624 square yards), tack coat application (4,996 gallons), Superpave asphalt placement...
- The Kansas Department of Transportation is soliciting bids for highway signing work at various locations on K-44, K-49, US-81, US-160, US-166, and US-177 across Sumner, Sedgwick, Cowley, and Harper counties, spanning 135.30 miles, with electronic proposals due June 17, 2026 at 1:00 p.m. through Bid Express. Contractors must notify KDOT of intent to bid by 5:00 p.m. on the Monday preceding the letting date. The scope includes mobilization, installation and removal of highway signs, removal of...
The Kansas Department of Transportation is requesting bids on grading and surfacing of RS 2039 from Ottawa Road to K-18 in Ottawa County spanning 3.30 miles, with electronic proposals due June 17, 2026 at 1:00 p.m. local time and opened at 3:00 p.m. the same day. Contractors must be prequalified with KDOT and hold a current Tax Clearance Certificate from the Kansas Department of Revenue. The scope includes common construction items (staking, field office setup, mobilization, traffic control), clearing and grubbing, common excavation (8,865 cubic yards), earthwork compaction, temporary surfacing, saw cuts (34,878 linear feet), mailbox installation, temporary erosion and pollution control (fertilizer, seed, sediment removal, geotextile, mulching), HMA-Commercial Grade asphalt surfacing (9,014 tons), aggregate shoulders (7,751 square yards), special surfacing material (56 tons), and pavement marking in white (34,175 linear feet) and yellow (13,363 linear feet). Pricing is submitted via unit prices on the accompanying Unit Prices List. The project is funded through federal and county sources under the Highway Safety Improvement Program (HSIP-C532(101)). The project has 85 restricted days to open to unrestricted traffic and 105 contract working days total for completion, with an earliest start date of June 14, 2027. The contractor must execute the contract within ten business days of award. Contractors must notify KDOT of intent to bid as a prime contractor by 5:00 p.m. on Monday, June 9, 2026. Proposals are submitted electronically through Bid Express using AASHTO's Project Bids software. Contractors must comply with noncollusion certification, financial prequalification, federal restrictions on foreign unmanned aerial systems, affirmative action and equal employment opportunity requirements, and specified material and equipment standards.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Bid Notice-Grading and Surfacing - RS 2039.pdf | 1MB | 5/29/26 |