Grading and Surfacing - Kingman, KS
- The Kansas Department of Transportation is requesting bids for grading, bridge, and surfacing work on K-8 at Bridge 031 (Middle Beaver Creek) in Smith County, 12.120 miles north of the US-36/K-8 junction, with proposals due July 22, 2026 at 1:00 p.m. local time. The scope encompasses clearing and grubbing, common excavation, rock excavation, earthwork compaction, removal of existing structures, bridge construction (Class I and II excavation, concrete, reinforcing steel, prestressed concrete...
- The Kansas Department of Transportation (KDOT) is soliciting bids for grading and surfacing with pavement restoration on US-281 from Union Pacific Railroad East 15th Street in the City of Russell, Russell County, spanning 0.344 miles under State Project U281-084 KA 7260-01, with proposals due July 22, 2026 at 1:00 p.m. via Bid Express and electronic opening at 3:00 p.m. local time on the same date. Contractors must be financially prequalified with KDOT and hold a current Tax Clearance...
- The Kansas Department of Transportation is requesting bids for grading and bridge construction over the East Branch of Fall River, 6.0 miles south and 2.5 miles east of Teeterville in Greenwood County, with proposals due July 22, 2026 at 1:00 p.m. local time through Bid Express. Contractors must be prequalified with KDOT and must obtain a current Tax Clearance Certificate from the Kansas Department of Revenue at the time of contract award. The project encompasses grading, bridge construction,...
- <p>Sedgwick County, Kansas is requesting bids on grading, bridge, and surfacing work for US-54 Bridge 132 (Flood Control Canal) located 0.20 miles east of Hoover Road, with bids due July 22, 2026. The project covers 0.175 miles.</p> <p>No additional details regarding set-asides, preferences, scope specifications, contract value, evaluation criteria, or procurement timeline are available in the source beyond the bid due date.</p>
- The Kansas Department of Transportation (KDOT) is requesting sealed bids for asphalt crack repair on US-166 in Sumner County, spanning 9.0 miles from the US-81 junction to mile post 9, with proposals due July 22, 2026 at 1:00 p.m. local time. Contractors must be prequalified with KDOT and provide notice of intent to bid by 5:00 p.m. on the Monday preceding the letting date. The scope includes mobilization, traffic control, and sealing of asphalt cracks greater than 1/8 inch across 151,726 linear...
- The Kansas Department of Transportation (KDOT) is requesting sealed bids for grading and bridge construction over Little Labette Creek near Thayer in Neosho County, with proposals due July 22, 2026 at 1:00 p.m. local time through the Bid Express website. Contractors must be prequalified with KDOT — a mandatory eligibility requirement. The scope includes grading, bridge construction, guardrail installation, erosion control, and associated site improvements. The bridge spans 0.133 miles and is...
- The Kansas Department of Transportation is soliciting bids on pedestrian and bicycle paths construction in the City of Wamego, Pottawatomie County, with proposals due July 22, 2026 at 1:00 p.m. local time through Bid Express. Contractors must be prequalified with KDOT and hold a current Kansas Department of Revenue Tax Clearance Certificate. The scope encompasses sidewalk construction (4-inch depth), sidewalk ramps, curb and gutter, concrete pavement (6-inch uniform), aggregate base, flashing...
- The Kansas Department of Transportation (KDOT) is soliciting bids for milling and hot mix asphalt overlay work on U.S. Route 40 in Logan County, with proposals due July 22, 2026 at 1:00 p.m. through Bid Express. Contractors must hold current KDOT prequalification and a valid Tax Clearance Certificate from the Kansas Department of Revenue at time of award. The scope covers 14.71 miles of milling and HMA overlay on U.S. 40 from Road 140 NE to Road 270, including 51,683 tons of HMA overlay...
- The Kansas Department of Transportation is requesting sealed bids for crack seal work on asphalt roads across three sections totaling 37.704 miles in Butler County, with proposals due July 22, 2026 at 1:00 p.m. local time and bid opening at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and submit electronic proposals through Bid Express using AASHTO Project Bids software. The three project sections are US-54 from 159th Street...
- The Kansas Department of Transportation (KDOT) is requesting electronic bids for pedestrian and bicycle path construction in Wamego, Pottawatomie County, with proposals due July 22, 2026 at 1:00 p.m. local time through the Bid Express website. Contractors must be prequalified with KDOT and provide notice of intent to bid by 5:00 p.m. on the Monday preceding the letting date. The project is federally funded through the Federal Highway Program and requires compliance with federal and state...
The Kansas Department of Transportation is requesting bids for grading and surfacing on US-54/US-400 from Broadway Street to K-14 in Kingman, Kingman County, with proposals due July 22, 2026 at 1:00 p.m. local time through Bid Express. Only prequalified contractors may bid and must identify themselves as bid holders by 5:00 p.m. on the Monday preceding the letting date. The 0.213-mile project scope includes construction staking, field office and laboratory services, mobilization, removal of existing structures, foundation stabilization, excavation and compaction, flowable fill, utility adjustments, storm sewer installation in multiple sizes, sidewalk construction and ramps, temporary erosion and sediment control, concrete pavement with aggregate base and geotextile separation, fencing, signing, pavement markings, seeding, and traffic control. The contractor must open the project to unrestricted traffic within 90 restricted working days and complete all work within 120 total contract working days, with an earliest start date of March 15, 2027. The project is federally funded through the Federal Highway Program (ACNHP-A645(201)) with state and city contributions. Selected line items carry set unit prices: foundation stabilization at $40 per cubic yard, flagger services at $30 per hour, and water at $40 per thousand gallons; other items are priced individually by the bidder. Contractors must provide a current Tax Clearance Certificate from the Kansas Department of Revenue at contract award and comply with KDOT's Standard Specifications for State Road and Bridge Construction (2015 Edition), special provisions, environmental protections under the Migratory Bird Treaty Act, stormwater pollution management, minimum wage rate requirements for Kingman County, and mandatory affirmative action and equal employment opportunity provisions. Contractors must also certify noncollusion, financial prequalification, debarment history clearance, federal lobbying restrictions compliance, and prohibition on foreign unmanned aerial systems. The contract must be executed within ten business days of award notification.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Bid Notice-Grading and Surfacing - Kingman_ KS.pdf | 2MB | 6/24/26 |