Grading and Bridge - Miami County
- The Kansas Department of Transportation (KDOT) is requesting bids for grading, bridge, and surfacing work on I-70 Bridge 002 over Milford Lake Road in Geary County, with proposals due August 19, 2026 at 1:00 p.m. through the Bid Express website and bids to be opened at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and notify the department of intent to bid by 5:00 p.m. on the Monday preceding the letting date. The project...
- The Kansas Department of Transportation (KDOT) is requesting bids for grading, bridge, and surfacing work on K-61 in McPherson County, with electronic proposals due August 19, 2026 at 1:00 P.M. Local Time via Bid Express. Prequalified contractors only are eligible to bid — this is a mandatory eligibility filter. The project covers repair and reconstruction of Bridge 100 (0.19 miles east of the K-153 Spur) and Bridge 102 (US-81 ALT, at the junction of US-81 ALT/K-61) over a project length of...
- The Kansas Department of Transportation (KDOT) is requesting bids for grading, bridge, and surfacing work on I-70 Bridge 017 over Franks Creek and B Road (3.13 miles east of I-70/US-40B West Junction) and Bridge 019 over US-40B/K-57 at the K-57/I-70 Junction in Geary County, with proposals due August 19, 2026 at 1:00 p.m. Local Time. The scope encompasses excavation, concrete work, structural steel fabrication, bridge construction and repair, asphalt and concrete surfacing, rumble strips,...
- The Kansas Department of Transportation is requesting bids on grading and bridge construction over East Fork Rattlesnake Creek in Kiowa County, with proposals due by 1:00 p.m. Local Time on August 19, 2026 through the Bid Express electronic platform. Bidders must be prequalified with KDOT and must hold a current Tax Clearance Certificate from the Kansas Department of Revenue at contract award; subcontractors must obtain Tax Clearance Certificates before approval. The project is federally...
- The Kansas Department of Transportation (KDOT) is requesting electronic bids for pedestrian and bicycle paths construction on Main Street and Russell Avenue in the City of Wakeeney, Trego County, with proposals due August 19, 2026 at 1:00 p.m. Local Time through Bid Express; bids open at 3:00 p.m. at the Eisenhower State Office Building in Topeka. Only prequalified contractors may bid, a capability filter that eliminates unvetted competitors. The project spans 0.433 miles and includes clearing...
- The Kansas Department of Transportation is requesting bids for pedestrian and bicycle paths construction in the City of Sedgwick in Harvey County, with electronic proposals due August 19, 2026 at 1:00 PM Local Time via Bid Express, and bids opening and reading at 3:00 PM the same day at the Eisenhower State Office Building in Topeka. The scope encompasses 0.08 miles of pedestrian and bicycle paths west of North Commercial Avenue from 5th Street to 6th Street, including site clearing and...
- The Kansas Department of Transportation is requesting bids for grading and surfacing pavement restoration on US-69A from 23rd Street to 20th Street in Baxter Springs, Cherokee County, with proposals due August 19, 2026 at 1:00 p.m. local time. Contractors must be prequalified and registered as bid holders by 5:00 p.m. on the Monday preceding the letting date and submit proposals electronically through Bid Express at ui.bidx.com. The scope includes clearing and grubbing, common and rock...
- The Kansas Department of Health and Environment is requesting competitive proposals for construction of the Russian Stotts Abandoned Mine Land reclamation project in Crawford County, with proposals due September 10, 2026 at 2:00 p.m. CST and mandatory pre-bid conference and site walk-through on August 26, 2026 at 8:30 a.m. at 4033 Parkview Drive, Frontenac, Kansas. The project is federally funded through the Department of Interior's Office of Surface Mining Reclamation and Enforcement and...
- The Kansas Department of Transportation is requesting bids for pedestrian and bicycle paths construction in Labette County, with proposals due August 19, 2026 at 1:00 p.m. local time and bid opening at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and submit electronic proposals through Bid Express using AASHTO's Project Bids software. The project encompasses 1.25 miles of pedestrian and bicycle paths on Ness Road from 5th...
- The Nebraska Department of Transportation is soliciting sealed bids for repair and replacement of aging bridges along I-80 and I-180 in the Lincoln area on behalf of the City of Lincoln, with the letting (bid opening) scheduled for August 27, 2026 at 1:30 p.m. via online meeting platform. Bidders must be prequalified for NDOT Classes 6 and 10 (Bridges and General). The scope spans seven bridge locations (O Street, North 27th Street, Southwest 40th Street, Sheridan Boulevard, North 10th Street,...
Kansas Department of Transportation (KDOT) is requesting bids on a bridge replacement and grading project in Miami County (located 1.5 miles south and 1.8 miles west of New Lancaster), with proposals due August 19, 2026 at 1:00 p.m. local time via Bid Express. Contractors must be prequalified and registered as bid holders on KDOT's website no later than 5:00 p.m. on the Monday preceding the letting date. The scope includes bridge replacement over Middle Creek (total project length 0.142 miles), grading, common and rock excavation, earthwork compaction, guardrail installation, pipe and end sections, concrete pavement surfacing, signing, and associated infrastructure. Pricing is established through unit prices; set-price items include foundation stabilization at $40.00 per cubic yard, granular backfill at $60.00 per cubic yard, and water for grading at $40.00 per million gallons. The project is funded entirely through the Federal Aid Highway Program under Federal Project Number BRO-C535(301). The contract term includes 75 restricted working days to open the project to unrestricted traffic and 95 total contract working days for completion. Contract execution is required within ten business days following award notification. Contractors must submit proof of a current Tax Clearance Certificate from the Kansas Department of Revenue at contract award. Mandatory certifications include noncollusion, financial prequalification, limitations on federal funds for lobbying, and contractual services with legislators. Special provisions address affirmative action and EEO requirements, federal restrictions on foreign drones, environmental compliance including stormwater pollution management and temporary erosion and sediment control, and minimum wage rates for Miami County. Proposals will be opened and read at 3:00 p.m. local time at the Eisenhower State Office Building in Topeka on August 19, 2026.