Fy2026 Njdot Surface Welchville Road Resurfacing And Safety Improvements, Nj Route 45 To Railroad Tracks County Road #540 In Alloway And Mannington Townships

Open State & local contract opportunity Posted

Solicitation number
Bid # 26-30
State
New Jersey
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The New Jersey Department of Transportation is soliciting bids for FY2026 resurfacing and safety improvements on Welchville Road (County Road #540) from NJ Route 45 to the railroad tracks, with bids due December 2, 2026. The 2.97-mile project runs through Alloway and Mannington Townships, and the opportunity lists Sussex County as its jurisdiction.

Scope includes milling the existing HMA surface course, repairing and replacing failing HMA sections, and overlaying the roadway with HMA Surface Course Mix 9.5M64. Pavement grades must be laid out by a New Jersey Licensed Surveyor using survey-level techniques. Safety work includes traffic signs, long-life traffic stripes, raised pavement markers, and replacement of beam guide rail at specified locations. Traffic control must conform to the FHWA Manual on Uniform Traffic Control Devices. When required, the awardee provides two certified traffic directors and flaggers at all times, controlling both ends of the work zone, and alternates traffic within a maximum work zone length of 2,000 feet under NJDOT traffic control rules. The contractor obtains a Highway Occupancy Permit for any work affecting NJ Route 45, including temporary signage placed on it.

Fuel and asphalt price adjustments are included. Work items called for in the plans but lacking a specific bid item are priced within the other listed bid items. Items designated "if and where directed" are conditional and depend on field direction.

The attached bid document is Bid 26-30, a 28MB file. The opportunity was posted November 7, 2026.

Opportunity text

Welchville Road, County Road #540, from Route 45 to the Railroad Tracks, for a total distance of 2.97 miles (+/-), in Mannington and Alloway Townships. Work includes but is not limited to the milling of the existing HMA surface course, repair and replacement of specific failing HMA surface and surface materials, and overlay of the roadway with HMA Surface Course, Mix Designation 9.5M64. Proposed pavement grades shall be laid out by the Contractor using a survey level and acceptable survey techniques by a NJ Licensed Surveyor. A fuel price adjustment and an asphalt price adjustment are provided. Safety improvements as called for in the plans shall consist of construction of traffic signs, long-life traffic stripes, and RPMs, and replacement of beam guide rail at specific locations along the project. All traffic control devices and measures required shall be in place in a satisfactory manner before construction work begins. All traffic control devices as called for in the plans or specifications shall conform to the current Manual on Uniform Traffic Control Devices (MUTCD) of the Federal Highway Administration (FHWA). When required, the successful bidder shall provide two (2) certified traffic directors, flaggers, at all times, controlling both ends of the work zone. During all work, the contractor shall conform to the standard NJDOT traffic control rules & regulations for alternating traffic flow within a maximum work zone length of 2,000 feet. It is the responsibility of the contractor to obtain a Highway Occupancy Permit for any and all work affecting NJ Route 45, including but not limited to temporary traffic control signage placed on NJ Route 45. Any item of work that is called for in the plans or specifications that is not covered by a specific construction item, the price thereof shall be included in the cost of the various other bid items listed in the proposal of this contract. Any construction items that are designated "if and where directed," the actual quantity thereof shall be determined in the field by the engineer. The Contractor will be required to submit a progress schedule, which shall be in accordance with the standard specifications. The progress schedule is to be submitted to the County Engineer for approval at or before the required pre-construction meeting. The Contractor is also required to produce a pre-construction video which documents the existing site conditions within the limits of the project prior to any construction operations. The Contractor is to submit this video to the County Engineers Office prior to beginning any work for the project. The Traffic Control Plan is based on the requirements provided in the current MUTCD and in the 2019 NJDOT Standard Roadway Construction Traffic Control Bridge Construction Details booklet. It shall be the responsibility of the Contractor to have the utilities located before any excavation takes place and to exercise caution when excavating. Any damage to existing utilities caused by construction shall be repaired by the Contractor at his expense. The milling and paving operation shall be performed in such a manner to limit the milled surface exposure to 48 hours at any given time. Therefore, the paving shall be performed in echelon, with a maximum length of cold joint equal to the total possible length of milling in a single eight (8) hour workday, thus allowing enough time to clean, repair, level, and resurface the roadway within two (2) days. The Contractor shall perform base repair, on an if and where directed basis as required by the Owner and his or her engineer, with no negotiations in the contract prices. Driveway access shall be maintained at all times during construction. If it becomes necessary to close a driveway for a short period of time, the property owner shall be notified well in advance of the closure and must be agreeable to the time frame. Any driveway disturbed must be restored to usable condition by the end of the workday. Prior to the construction of any HMA material on the existing pavement, the surface shall be swept clean of all dirt and debris and any other material that would be detrimental to the construction of the new pavement surface. There is no bid item for sweeping; the cost thereof shall be included in the cost of the various other bid items. The existing pavement and surface paving shall be tack coated after it is cleaned just prior to construction of the new surface. Tack coat shall be applied immediately before the placement of leveling course HMA, and immediately before the final overlay of the entire roadway surface. Tack coat shall mean RS-1 or RC-70 Tack Coat unless otherwise directed; Emulsion shall be prohibited. The proposed turf repair strip as called for in this contract shall be constructed as soon as possible after the overlay has been constructed. This work shall be done concurrently with the overlay work, not as a separate phase after the overlay work has been completed. The Contractor shall utilize a mechanical plate tamper during the turf repair strip operation along the shoulder of the road in order to satisfactorily compact the soil to an elevation equal to the new pavement surface. Any settled areas shall be filled in and re-compacted by the Contractor. The Contractor shall finish one (1) section of roadway at a time completely before starting the next section. Roadway sections shall not exceed the total possible length of milling in a single 8-hour workday as designated in these supplemental specifications under scope of work. There will be no deviation from this procedure without the express permission of the County Engineer. It shall be the responsibility of the Contractor to prepare a letter to the bus transportation department, school districts, local offices, and all adjacent property owners on the project indicating the type of work to be done and the approximate time it will take to complete the work; this shall include any tree or hedge trimming required or mailbox resetting to perform the contracted work. The letter shall be submitted to the County Engineer for approval. After approval by the County Engineer, the Contractor shall deliver the letters a minimum of three (3) days prior to the start of construction. The Contractor shall maintain the flow of traffic through this area to the maximum extent possible. Nighttime work is not permitted. The Contractor shall make contact with the appropriate school officials a minimum of one (1) week prior to the start of construction and discuss any impacts that the project will have on their school bus routes. Every effort shall be made to accommodate construction time restrictions that the schools might require due to bus schedules, special events, etc. The Train Method shall be used in milling and paving the roadway, thus requiring full mobilization of both the milling and level-paving crews, starting and lagging each other, by no more than four (4) crew hours. The top course shall not be placed upon one (1) lane before the entire roadway surface is milled and leveled. The sloped plate-paving operation shall be used at all times for the final course of paving, with no deviations.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors