The Village of Tarrytown, New York, is soliciting bids for Contract 2026-12, the Franklin Courts Infrastructure Improvements Project, with proposals due December 1, 2026. The Inter-Municipal/Developer Agreement requires the Village to award the construction contract through public competitive bidding within 120 days of the agreement's October 2026 execution, and Westchester County is funding the work through its Housing Implementation Fund with tax-exempt general obligation bonds. No set-aside or preference program appears in the source.
The scope includes rough grading, excavation, and soil management; stormwater, sanitary, and water main installation; segmental retaining walls; site electrical trenching, conduit, light poles, and EV charger setting; asphalt striping; landscape plantings and topsoil placement; and parking garage concrete, masonry, and fire protection systems. The source describes these items as "including but not necessarily limited to" the listed work. The site is a Brownfield Cleanup Program property under NYSDEC Site No. C360252, approved for Track 4 restricted-residential use, so work must follow the approved Remedial Action Work Plan. That plan calls for excavating and disposing off-site of approximately 9,300 cubic yards of contaminated soil, installing a minimum two-foot soil cover with a demarcation layer, and applying green remediation practices. DEC requires seven days' notice before field work begins. The project schedule also includes removal of approximately 22 underground storage tanks and phased demolition of existing buildings.
The schedule spans 622 days, from November 17, 2026, through April 4, 2029. Phase 1 runs 424 days, from November 18, 2026, to July 3, 2028, and Phase 2 runs 190 days, from June 28, 2028, to March 20, 2029. The contractor coordinates its work with other contractors on site.
The project redevelops 50 White Street in Tarrytown, a 70-unit public housing property, into 90 affordable rental units across four buildings. Franklin Courts JV Partners L.P. is the developer. If the lowest acceptable bid exceeds the County HIF Funds, the developer must cover the excess through escrow or provide evidence of alternative funding. The source does not state a contract value.
Opportunity text
The project consists of infrastructure improvements related to the redevelopement of Franklin Courts; including but is not necessarily limited to: Rough grading, excavation and soil management Utility installation: stormwater, sanitary and water main installation Segmental retaining wall installation. Site electrical trenching, conduit, light poles and EV Charger setting Asphalt striping Landscape plantings, and topsoil placement Parking garage concrete, masonry, and fire protection systems Business enterprises awarded an identical or substantially similar procurement contract within the past five years: None