FPS 2023 Bond - BP#8 Twain, Dooley and Salk Renovations
Closed State & local contract opportunity Posted
- Solicitation number
- RFP FRA 260000002596 1
- State
- Michigan
- Responses due
Opportunity facts
- Jurisdiction
- UNSPSC codes
- 72152904 Exterior metal wall system installation service
- 72151200 Heating and cooling and air conditioning HVAC construction and maintenance services
- 72151202 HVAC process piping construction service
- 72151003 Heating system maintenance and repair service
- 72151004 Hydronics heating system maintenance and repair service
- 72151203 HVAC solar energy construction service
- 72151205 HVAC refrigeration construction service
- 72151201 HVAC mechanical construction service
- 72151204 HVAC ventilation and duct work construction service
- 72151206 HVAC heating system construction service
Updated .
About this opportunity
Fraser Public Schools is requesting bids for renovations at Twain, Dooley, and Salk school facilities under the 2023 Bond BP#8, with electronic proposals due by 12:00 p.m. on September 22, 2026 and public bid opening that same day. Pre-bid conferences and site visits are scheduled September 9 at 7:00 a.m. for Mechanical and Electrical trades and September 10 at 7:00 a.m. for General Trades and Roofing, both at Salk Elementary School, 17601 15 Mile Road, Clinton Township, Michigan.
The project comprises four bid categories — General Trades, Mechanical, Electrical, and Roofing — across multiple school facilities. Barton Malow Builders serves as Construction Manager; Wakely Associates Architects is the Architect/Engineer. Prevailing wage rates do not apply. Pre-qualification may be required; bidders with an Experience Modification Rate exceeding 1.0 will not be considered for award.
Bid security of 5% of the base bid, furnished by a surety authorized to do business in Michigan, is required. Bidders must include state sales and use taxes in proposals. Successful bidders must furnish Performance Bonds, Payment Bonds, and Certificates of Insurance per the Project Manual. The contract will be executed using AIA Document A132-2019, Standard Form of Agreement between Owner and Contractor (Construction Manager as Advisor Edition). Bid proposals may not be withdrawn or revoked for 90 days after bid receipt. Bidding documents dated June 22, 2026 are available for examination beginning September 8, 2026 through Building Connected and CAM/Plan rooms. Fraser Public Schools reserves the right to accept or reject any or all offers.
Files
| File | Type | Posted |
|---|---|---|
| BP8 Long Form Ad-for-bid.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity