Fort Fremont Stairs and Rails Design/Build
Closed State & local contract opportunity
- Solicitation number
- 070226
- State
- South Carolina
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 909 Building Construction Services, New, Including Maintenance And Repair Services
- 910 Building Maintenance, Installation And Repair Services
- 912 Construction Services, General, Including Maintenance And Repair Services)
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 914 Construction Services, Trades, New Construction
- UNSPSC codes
- Point of contact
-
- Gillian Murray gmurray@bcgov.net (843) 255-2290
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Beaufort County, South Carolina is soliciting sealed Design-Build proposals for the Fort Fremont Stairs and Rails project at Fort Fremont Preserve on St. Helena Island, with proposals due July 2, 2026 at 3:00 p.m. EST and a non-mandatory site visit on June 16, 2026 at 10:00 a.m.
The scope encompasses design, engineering, fabrication, and installation of four stair systems (ranging from 15.5 to 104 feet in length and 4 to 6 feet wide), one 98-foot landing railing section, three metal security window bar assemblies (approximately 42" x 42"), and two metal security doors (approximately 48" x 84"), all to be painted black or weather-treated as appropriate. The contractor must provide all labor, supervision, materials, equipment, transportation, permitting assistance, site protection, demolition, and incidentals necessary for completion in accordance with applicable codes and standards. The project objectives include improving public safety and pedestrian circulation, enhancing accessibility along the fort battery, protecting historic structures, providing secure exhibit room enclosures, and maintaining the historic and visual character of the preserve.
The County will select the proposal offering best overall value. Evaluation criteria are weighted as follows: Experience & Qualifications (25 points), Design & Technical Approach (25 points), References & Similar Project Performance (25 points), Project Schedule & Capacity (15 points), and Price Proposal (10 points). Proposals must be submitted as a not-to-exceed amount with design and construction portions itemized separately across twelve line items. Maximum proposal length is 15 double-sided pages.
Required insurance includes Worker's Compensation, Commercial General Liability ($1 million per occurrence / $2 million aggregate), Comprehensive Automobile Liability ($500,000 combined single limit), Umbrella Liability ($2 million), and Professional Liability ($1 million). Questions are due June 17, 2026 at 5:00 p.m. EST. A non-mandatory pre-proposal meeting is scheduled for June 11, 2026 at 2:00 p.m. EST.
Opportunity text
Beaufort County is soliciting sealed proposals from qualified Design-Build firms for the design, engineering, fabrication, and installation of stairs, railings, security doors, and security window systems at Fort Fremont Preserve located in St. Helena Island, South Carolina.
The selected Design-Build contractor shall provide all labor, supervision, materials, equipment, transportation, engineering, fabrication, permitting assistance, site protection, demolition, and incidentals necessary to complete the project in accordance with the Scope of Work and all applicable codes and standards.
The improvements are intended to:
- Improve public safety and pedestrian circulation;
- Enhance accessibility and visitor flow along the fort battery;
- Protect historic structures and features from damage;
- Provide secure enclosures for designated exhibit rooms; and
- Maintain the historic and visual character of Fort Fremont Preserve.
The County intends to select the proposal that provides the best overall value based upon qualifications, technical approach, experience, schedule, price, and understanding of the project requirements.
Files
| File | Type | Posted |
|---|---|---|
| Fort_Fremont_Stairs_and_Rails_Design_Build_(Addendum_#2_Revision).pdf | ||
| Stairs_and_Rails_Map.pdf | ||
| ZIP_-_Fort_Freemont_SOW_and_Images.zip | ZIP file | |
| 00_Stairs_and_Rails_SOW.pdf | ||
| 18_door_sketch.png | PNG image | |
| 17_door_sketch.png | PNG image | |
| 05_stairs2_crossing.jpeg | JPEG file | |
| 16_windows.jpeg | JPEG file | |
| 15_door_and_window.jpeg | JPEG file | |
| 19_Door_Design_Example.pdf | ||
| 01_stairs1.jpeg | JPEG file | |
| 11_railings.jpeg | JPEG file | |
| 02_stairs2.jpeg | JPEG file | |
| 09_stairs4.jpeg | JPEG file | |
| 03_stairs2.jpeg | JPEG file | |
| 10_stairs4.jpeg | JPEG file | |
| 07_stairs3.jpeg | JPEG file | |
| 06_stairs3_crossing.jpeg | JPEG file | |
| 12_railings.jpeg | JPEG file | |
| 14_door.jpeg | JPEG file | |
| 13_railings.jpeg | JPEG file | |
| 04_stairs2.jpeg | JPEG file | |
| 08_stairs4_crossing.jpeg | JPEG file |
Show all 23
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity