About this opportunity

The City of Springfield, Illinois, Department of City Water, Light & Power is soliciting sealed bids under RFP UE27-29 for limestone calcium carbonate for the Flue Gas Desulfurization System at the V.Y. Dallman Power Station, with bids due November 12, 2026 at 3:00 p.m. local time. All limestone suppliers must be prequalified for use in the FGDS system.

Prequalification is the decisive filter. If a non-prequalified supplier is the low bidder, a 45-day trial period is required to establish product compatibility. Bidders must provide a detailed chemical analysis of the limestone proposed for shipment and identify the exact location of the manufacturer's quarry.

Pricing must show limestone cost per ton, freight and trucking cost per ton, and total delivered price per ton on a DDP basis, freight prepaid to Springfield, Illinois. Bids are evaluated on equivalent cost per ton, calculated as delivered cost per ton divided by calcium carbonate percentage. Price adjustment penalties apply to moisture above 4 percent, two-week weighted average calcium carbonate below 94 percent, magnesium carbonate above 3 percent, iron above 0.12 percent, and material passing the #4 sieve above 6 percent. The City reserves the right to award to one or more bidders based on lowest total cost for the entire tonnage.

The City anticipates annual requirements of 30,000 to 80,000 tons, with approximately 60,000 tons expected, but guarantees no minimum; monthly quantities vary with seasonal power demand and maintenance outages. The minimum term runs January 1, 2027 through December 31, 2029. Longer terms will be considered, and year-to-year renewal is available by mutual agreement with three months' notice before expiration. Hauling rates carry a fuel cost adjustment applied bi-monthly on February 1, April 1, June 1, August 1, October 1, and December 1, based on the Midwest Rack Price of #2 fuel oil against a $5.00 per gallon baseline.

Payment is NET 45 days following invoice receipt or final product acceptance, whichever is later. No bid security is required. Questions were due November 2, 2026, with responses by November 4, 2026. The anticipated award date is December 15, 2026.

Opportunity text

Limestone calcium carbonate to be used in the Flue Gas Desulfurization System (FGDS) at the V.Y. Dallman Power Station, Springfield, Illinois. Limestone supply is used to neutralize and remove harmful sulfur dioxide (\(SO_{2}\)) emissions from industrial exhaust gases.