Floral Drive Water Main Replacement Project, CWO# 2026-003
Closed State & local contract opportunity
- Solicitation number
- IFB No. WT-0306
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 912 Construction Services, General, Including Maintenance And Repair Services)
- 91223 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.)
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 968 Public Works And Related Services
- 96891 Water Supply Analysis, Infrastructure Analysis, Water Quality Analysis, And Long Term Planning
- 96892 Water Supply Plant Operating And Monitoring System Services (Including Water Resources Development And Water Quality Management Services)
- 96895 Wastewater Treatment Plant, Operations, And Testing
- 96896 Water And Wastewater Treatment Services
- UNSPSC codes
- 72101515 Subsidence service work
- 72141130 Ornamental fountain construction and or remodelling service
- 70171504 Water resources mapping services
- 70171606 Water resource recovery services
- 83101502 Water resource management
- 83101508 Town water
- 70170000 Water resources development and oversight
- 70171503 Ground or surface water surveying
- 70171505 River basin development
- 70171507 Surface water development
Show all 34
- 70171605 Water rights advisory services
- 83101506 Water treatment services
- 83101507 Desalination services
- 47101579 Fresh/sea water treatment plant
- 72141511 Digging services
- 70171600 Water quality management services
- 83101501 Supply of water
- 12165200 Water treatment
- 72140000 Heavy construction services
- 72101512 Hoist construction service
- 72101513 Offsite construction service
- 72101514 Refuse area construction service
- 72141507 Pile driving service
- 70171500 Water resource development service
- 70171501 Water quality assessment services
- 70171502 Water resources planning services
- 70171506 Ground or surface water modeling services
- 70171601 Water quality management
- 70171603 Floodplain management
- 83101503 Water quality control management
- 83101504 Water distribution management
- 83101505 Water policy advisory services
- 83101509 Service water
- 76121700 Liquid waste treatment
- Point of contact
-
- Katy Fitzgerald kfitzgerald@santacruzca.gov (831) 420-5200
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Santa Cruz Water Department is soliciting bids for a single prime contract through an Invitation for Bids (IFB No. WT-0306) for the Floral Drive Water Main Replacement Project (CWO# 2026-003) located in Santa Cruz County, California. The project scope involves replacement of the public potable water main system on Floral Drive between 34th Avenue and 38th Avenue, including installation of approximately 1,350 linear feet of 6-inch diameter DR 14 C-900 PVC water main with associated valves, fittings, appurtenances, system connections, service reconnections, fire hydrant installation, and pavement restoration meeting County of Santa Cruz standards. Successful bidders must possess a valid State of California Class A or C-34 Contractor's License at time of contract award and maintain it throughout the contract term. The project must be completed within 80 contract working days, defined as any day during which construction work is performed or normal weekdays Monday through Friday, excluding holidays and adverse weather days. Bids must be submitted electronically through the City's e-Procurement Portal at https://procurement.opengov.com/portal/santacruzca by May 29, 2026 at 2:00 PM Pacific Standard Time, with public bid opening held virtually via Microsoft Teams at the same time. The contract will be awarded to the lowest responsible responsive bidder. Site examination is the responsibility of each bidder before submitting a bid, and while no pre-bid conference is scheduled, bidders are encouraged to visit the project site and submit pre-bid questions through the OpenGov portal.
The project is subject to prevailing wage requirements under California Labor Code, with contractors and all subcontractors required to register with the Department of Industrial Relations and comply with electronic certified payroll reporting. Contractors must make good faith efforts to hire qualified residents of Santa Cruz County and employ apprentices from viable apprenticeship programs. Bidders must possess a current City of Santa Cruz Business Tax Certificate if they are located in the City, perform physical work in the City for six or more days annually, or use company vehicles to deliver within the City for six or more days annually. Bid security equal to not less than 10 percent of the bidder's maximum bid price is required in the form of a certified check, cashier's check, or bid bond, valid for 60 days from the bid opening date. Performance and Labor and Material Bonds equal to 100 percent of the contract price are required, and contractors must procure insurance with minimum limits including $2,000,000 per occurrence commercial general liability, $1,000,000 automobile liability, and workers' compensation with statutory limits. The project has an Engineer's estimate of One Million Dollars and includes a liquidated damages clause of $500 per calendar day for failure to complete work on time. Progress payments are subject to 5 percent retention withholding until 35 calendar days after recording the notice of completion.
Opportunity text
Bids will be received for a single prime contract for replacement of the public potable water main system on Floral Drive between 34th Avenue and 38th Avenue in the County of Santa Cruz.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity