Fire Alarm Replacement Project at the Substance Abuse Treatment Facility
Open State & local contract opportunity Posted
- Solicitation number
- PMB202607
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Samantha Brammer samantha.brammer@cdcr.ca.gov (916) 263-8819
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The California Department of Corrections and Rehabilitation is soliciting statements of qualifications from design-build entities to replace the fire alarm system at the Substance Abuse Treatment Facility in Corcoran, California, with a mandatory briefing conference on December 9, 2026 at 11:00 a.m. PT and statements of qualifications due February 1, 2027 at 3:00 p.m. PT. The solicitation mandates a minimum 25 percent Small Business participation and a minimum 3 percent Disabled Veteran Business Enterprise participation of the contract price, and applicants must submit comprehensive utilization plans, including recovery plans.
Eligible design-build entities must be led by a California-licensed general contractor (Class A or Class B) with architect, structural engineer, mechanical engineer, electrical engineer, and fire protection engineer team members. Bidders must show an average experience modification rating of 1.00 or less for the most recent three years and no surety company finishes within the last three years. Firms that prepared the RFQ or RFP criteria, including DLR Group, Vanir Construction Management, and APSI Construction Management, are excluded. The project is subject to prevailing wage requirements, Public Works Contractor Registration with the Department of Industrial Relations, and California Labor Code skilled and trained workforce provisions.
The scope covers complete demolition and replacement of the fire alarm system across all buildings at the 1,682,000-square-foot facility, including detection devices, horns, strobes, control units, annunciator panels, network connections, fiber pathways, conduits, and cabling. It also requires evaluation and repair or replacement of interconnected fire-smoke dampers, fire shutters, suppression system switches, and smoke control components, with coordination of approvals and inspections through the Office of the State Fire Marshal. The stipulated sum for the design-build agreement is estimated between $38 million and $42 million, with project completion expected within 36 months of notice to proceed. CDCR will select no more than three highest-scoring entities to advance to the RFP phase, and each non-awarded entity that submits an acceptable project proposal receives a $30,000 stipend.
Remaining milestones include a proposal manager application deadline of December 15, 2026 at 3:00 p.m. PT, written questions due January 7, 2027, RFP issuance anticipated April 26, 2027, mandatory site visits May 25–27, 2027, proposal interviews August 26–27, 2027, and design-build agreement award anticipated in Quarter 4 of 2027.
Opportunity text
Description: The California Department of Corrections and Rehabilitation is requesting a statement of qualifications from interested design-build entities to provide professional architectural/engineering and construction services for the design and construction of the replacement fire alarm system at the Substance Abuse Treatment Facility located at 900 Quebec Avenue, Corcoran, CA, 93212
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity