This Request for Qualifications (RFQ) is issued by the California Department of Corrections and Rehabilitation (CDCR) for a design-build project to replace the fire alarm system at the Substance Abuse Treatment Facility (SATF) located in Corcoran, California. The project involves complete demolition and replacement of the existing fire alarm system across all buildings at the 1,682,000-square-foot facility, including detection devices, horns, strobes, control units, annunciator panels, network connections, fiber pathways, conduits, and cabling, as well as evaluation and repair or replacement of interconnected systems such as fire-smoke dampers, fire shutters, suppression system switches, and smoke control components. The design-build entity must be a California-licensed general contractor (Class A or Class B) with supporting architect, structural engineer, mechanical engineer, electrical engineer, and fire protection engineer team members. The RFQ process timeline includes a mandatory briefing conference on December 9, 2026, at 11:00 a.m. PT, with the proposal manager application deadline of December 15, 2026, at 3:00 p.m. PT. Written questions must be submitted by January 7, 2027, and the Statement of Qualifications (SOQ) is due February 1, 2027, at 3:00 p.m. PT. CDCR will select no more than three highest-scoring entities to advance to the RFP phase, with RFP issuance anticipated for April 26, 2027, mandatory site visits scheduled for May 25-27, 2027, and proposal interviews on August 26-27, 2027. The design-build agreement award is anticipated in Quarter 4 of 2027, with project completion expected within 36 months of notice to proceed.

The stipulated sum for the design-build agreement is currently estimated between $38 million and $42 million. This project is subject to prevailing wage requirements and Public Works Contractor Registration with the Department of Industrial Relations. CDCR has established mandatory Small Business (SB) participation at a minimum of 25 percent and Disabled Veteran Business Enterprise (DVBE) participation at a minimum of 3 percent of the contract price, with applicants required to submit comprehensive utilization plans including recovery plans. Each non-awarded design-build entity that submits an acceptable project proposal will receive a $30,000 stipend. The project must comply with California Labor Code requirements, including skilled and trained workforce provisions. Prospective bidders must demonstrate acceptable safety records with an average experience modification rating of 1.00 or less for the most recent three-year period and must have no surety company finishes within the last three years. The project requires coordination with the Office of the State Fire Marshal for approvals and inspections, and firms involved in preparing the RFQ or RFP criteria documents, including DLR Group, Vanir Construction Management, and APSI Construction Management, are excluded from participation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION

FACILITY PLANNING, CONSTRUCTION AND MANAGEMENT

PROJECT MANAGEMENT BRANCH

REQUEST FOR QUALIFICATIONS FROM PROSPECTIVE DESIGN-BUILD

ENTITIES

FOR

FIRE ALARM REPLACEMENT

AT

SUBSTANCE ABUSE TREATMENT FACILITY

RFQ NO.: PMB202607

Eprocurement Event ID# 0000040932

1. Part A – Questionnaire

2. Part B – Experience

3. Exhibit A – Design-Build Entity’s Proposal Manager

(Application for Qualification for Design-Build Entities)

November 12, 2026

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

Design–Build Package November 12, 2026Page 2 of 25

Project: Fire Alarm Replacement project Design-Build Entity Substance Abuse Treatment Facility (SATF)

Owner: State of California California Department of Corrections and Rehabilitation

Definitions: The following “terms” are used throughout this request for qualifications (RFQ) and are defined as follows:

"Best Value" is defined as a procurement process whereby a bidder may be selected on the basis of objective criteria for evaluating the qualifications of bidders with the resulting selection representing the best combination of price and qualifications.

"Criteria Architect" is defined as the consultant retained by the California Department of Corrections and Rehabilitation (CDCR) to develop the criteria documents and define functional and aesthetic characteristics establishing the design intent.

"Design-Build" is defined as a project delivery process in which both the design and construction of a project are procured from a single entity.

"Design-Build Entity" (DBE) is defined as a corporation, limited liability company, corporation, partnership, joint venture, or other legal entity, acting as the prime contractor, that is able to provide appropriately licensed contracting and registered architectural and engineering services as needed, pursuant to a design-build contract.

"Design-Build Team" is defined as the DBE itself, and the individuals and other entities identified by the DBE as members of its team.

"Engineer of Record" is defined as the engineer, licensed in the state of California and employed by the DBE who prepares the construction documents (CD) and is responsible for signing and stamping the CDs as well as interpreting the CDs where ambiguities may exist.

"Request For Proposal Design-Build Package" is defined as the performance criteria, any concept drawings, the form of agreement, and all other documents and information that serve as the basis on which proposals will be solicited from the DBEs.

"Enhancements" is defined as a demonstrated benefit accepted by the CDCR that is beyond the minimum requirements established in the request for proposal (RFP).

"Prime Contractor" is defined as a contractor who is responsible for the completion of the whole project, under contract with the CDCR. The obligation of the prime contractor is to complete a project who can hire multiple subcontractors to do the same. The prime contractor on this project will act as the DBE.

"Project Proposal Agreement" is defined as a separate proposal agreement with each pre-qualified proposer for this project. Upon full and complete performance of the proposal agreement and of the RFP, the State will pay the two design-build proposers that were not awarded the design-build agreement a stipend in the amount of $30,000 for the project proposal.

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 3 of 25

"Stipulated Sum" is defined as the amount stated in the Agreement and including authorized adjustments by change order, is the total amount payable by the CDCR to the DBE for performance of the work under the CDs.

The prime contractor, architect of record and the engineer of record shall not be allowed to participate in any capacity with more than one DBE on this project. There are no such participatory restrictions on other members of the design-build team.

The consultant firms and/or individuals who are or have been involved in the preparation of this RFQ and the RFP for the projects, including, but not limited to members of the DLR Group criteria documents team or Vanir Construction Management, APSI Construction Management or their consultant teams, peer review or commissioning consultant teams, shall not be allowed to participate in any Design-Build Team in any capacity.

Each DBE shall designate one individual as its proposal manager who shall be responsible for all communications during the RFQ and RFP process. Upon receipt of this RFQ, the DBE shall complete Exhibit A, Application for Qualification, attached to this RFQ. Design-Build Entity's Proposal Manager, attached to this Application.

The DBE’s proposal manager application must be received by 3:00 P.M., PT on December 15, 2026, at the following address or email:

Facility Planning, Construction and Management

Capital Planning and Project Services Branch ATTN: Samantha Brammer, Contract Analyst

9838 Old Placerville Road, Suite B Sacramento, CA 95827

Samantha.Brammer@cdcr.ca.gov

The DBE’s proposal manager shall be the single point of contact for questions, inquiries, clarifications, and correspondence during the entire RFQ and RFP process.

Any substitution of DBE’s proposal manager for the RFQ and RFP process shall be made in writing to and approved by CDCR.

For this project, CDCR is utilizing a best value, stipulated sum, design-build procurement method under the Public Contract Code Division 2, Part 2, Chapter 1, commencing with Section 10187 under Article 6, whereby CDCR will establish a stipulated sum for the design-build agreement, currently estimated to be between $38 million and $42 million. The actual stipulated sum will be defined in the RFP. CDCR will issue the RFP to no more than the three highest scoring DBEs who shall then present their project proposal which shall meet or exceed all programmatic, elemental, functional, and performance-based criteria requirements set forth in the RFP.

I. Select Future Proposal and Contract Requirements

A. DVBE and SB Participation

The state of California acknowledges the contributions of Small Business (SB) and Disabled Veteran Business Enterprise (DVBE) to California's economy, in part, through the SB

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 4 of 25 participation program and the DVBE participation program. The State is committed to promote and facilitate full participation of these programs.

The state of California has established a mandatory DVBE participation of a minimum of 3% of the contract price and the SB participation goal is a minimum of 25% of the contract price.

The DBE shall be required to prepare and submit an SB/DVBE utilization plan. A SB/DVBE utilization plan is a written commitment to contract with certified SB and certified DVBEs as part of the State's project. Certification through the Department of General Services (DGS) can be found by reviewing:

https://www.caleprocure.ca.gov/

The DBE will be required to develop a comprehensive SB/DVBE utilization plan that fully outlines the DBE's commitments and processes to meet or exceed the established project participation requirements, not simply conduct a good faith effort. The utilization plan shall include a recovery plan for use during the contracting process should the DBE experience difficulties meeting its participation requirements.

The DBE is encouraged to make efforts to attain SB and DVBE participation throughout every phase of the RFQ/statement of qualifications (SOQ) and RFP/proposal processes, but, at a minimum, the successful DBE shall be required to implement the requirements of the SB/DVBE program as stipulated herein after execution of the design-build agreement.

The state will monitor the DBE's continued implementation of the SB/DVBE program requirements throughout performance of the agreement.

B. Contractor Registration

This project is considered a public works project pursuant to Labor Code Section 1720. As such, pursuant to Sections 1725.5 and 1771.1 of the Labor Code, all contractors and subcontractors shall be currently registered with the Department of Industrial Relations (DIR) in order to qualify to bid on; be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code; or engage in the performance of any contract for public work. Limited exceptions for joint ventures may apply pursuant to Section 1771.1 of the Labor Code. Registration process, fees, and related information may be obtained from the DIR website at: http://www.dir.ca.gov/Public-Works/Contractor- Registration.html. The DBE shall comply with the Public Works Contractor Registration Law Labor Code §1770 et seq.

C. Prevailing Wage and Compliance Monitoring

Pursuant to Labor Code Section 1774, the contractor and any subcontractors, regardless of tier, shall pay not less than the specified prevailing wage rates to all workers employed in the execution of the work of the agreement. Copies of the prevailing rate of per diem wages are on file at DGS, which shall be made available to all interested parties; alternatively, wage rates may be accessed at:

http://www.dir.ca.gov/Public-Works/Prevailing-Wage.html

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 5 of 25

This project is also subject to compliance monitoring and enforcement by DIR. All certified payroll records shall be submitted electronically to DIR. Further details will be provided in the RFP/Proposal stage of this procurement process.

D. Skilled and Trained Workforce

As part of the SOQ submittal, the DBE shall be required to prepare a commitment certifying that a skilled and trained workforce consistent with Public Contract Code, Division 2, Part 1, Chapter 2.9, and Sections 2600 et. seq., will be used on the project.

See Part A – Questionnaire, 6.8.

II. Project Introduction and Overview

SATF is located at 900 Quebec Avenue, Corcoran, CA. 93212. The Institution originally opened in 1997 and consists of seven facilities and comprises a variety of housing unit types and various support buildings (refer to Exhibit A below for included facilities). As of May 2025, there are 5,400 incarcerated persons housed at SATF, and it has a total building area of approx. 1,682,000 SF.

This scope of services includes demolition of the existing fire alarm system and complete replacement with new fire alarm equipment (including but not limited to detection devices, horns, strobes, control unit annunciator panels, connection to emergency power supplies, and terminal cabinets) within all buildings as required by code. In addition, this scope of services also includes installation of network connections, new fiber pathways, conduits, and cabling as required within all buildings to provide signal monitoring at the central control, complex control, and onsite fire house. All initiating, monitoring, controlling, and notification appliances shall be replaced. These include interconnection to fire protection and life safety systems as required to make the fire alarm system code compliant and functional. Although some upgrades to fire safety functions have been completed during previous construction projects, all systems requiring interconnection to the fire alarm (including but not limited to fire-smoke dampers, fire shutters, fire suppression system tamper and flow switches) shall be evaluated for repair or replacement in all areas of work. In addition, smoke control/evacuation operation, rated penetrations and head of wall conditions, in areas of work, need to be evaluated for repair and/or replace as well.

The fire alarm control units (FACUs) are the center of a building’s fire alarm and detection system.

Through ethernet cable, fiber optic and wireless networks, the FACUs communicate alarm, supervisory, and trouble conditions to the central control receiver and to the annunciator panel or workstation at each institution’s central control. Central control is a 24-hour staffed custody building that is defined as CDCR’s proprietary central monitoring station from which CDCR staff activate emergency procedures and contact internal emergency notification of an alarm. The delivery method for this project shall be design-build (DB) using personnel when alarms are received.

Further, SATF has a central control, complex control and onsite firehouse that also received or will receive standard monitoring to the annunciator panel or workstation.

A. Objective

The objective of this project is to provide code compliant fire alarm systems throughout the institution and its support buildings, which are fully functioning and maintainable at the completion of the work. The DBE will be required to understand the limits of work as identified in the engineering analysis, meet the requirements of the criteria documents, specifications, and the fire alarm narratives that follow in the RFP.

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 6 of 25

The means and methods of replacing the existing fire alarm system and providing a new fire alarm system, FACUs and devices are not prescribed. The manufacturer of the FACUs are also not prescribed. The DBE shall evaluate existing conditions and provide a design for a fire alarm system that meet the requirements of the building, electrical and fire protection codes, CDCR 2026 design criteria guidelines and can be inspected and accepted by the Office of the State Fire Marshal (OSFM).

B. Reality Capture

It is preferred that firms demonstrate capability and experience in utilizing project point-cloud data as an integral part of the design and documentation process. The intent is to maximize the value of the CDCR reality capture investment by leveraging existing-condition data to improve design accuracy, coordination, documentation, and overall project efficiency. Areas of expertise that would be beneficial are as follows:

1. Expertise in viewing and downloading point clouds that document the as-built conditions of the facility. Comparing the information in the point cloud files for design and construction purposes with all traditional 2D “as-built” documentation that are made available from CDCR and the criteria documents design team.

2. Viewing and translating the point clouds into 2D and 3D drawings and plans that can be used to coordinate and confirm and prepare all detailed design, dimensioned and quantity take offs for the purposes of developing permitting drawings, shop drawings and quantity estimates and take offs for equipment and construction pricing.

3. Using the information in the point clouds for coordination of routing and clash detection to avoid field conflicts with existing conditions or for use in resolving field conditions that may occur during construction that require reiterative coordination.

4. Demonstrated experience utilizing point cloud and/or reality capture data on comparable projects, including examples of how the information was incorporated into the design and documentation process. Firms should identify relevant project experience and describe how point cloud data was used to improve the accuracy and completeness of existing condition documentation, design coordination, quantity takeoffs or construction documentation.

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 7 of 25

Figure 1- Vicinity Maps – SATF Correctional Facility

Figure 2 - Vicinity Maps – SATF Correctional Facility

The picture can't be displayed.

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 8 of 25

C. SUMMARY

The following table is a summary of the events in the RFQ and RFP process. Dates below are subject to change as required by the master schedule:

Step 1: RFQ Process Due Date Due Time

Published RFQ date: Nov. 12, 2026 3:00 P.M., PT

Mandatory RFQ briefing conference: Dec. 9, 2026 11:00 A.M., PT

Deadline for naming proposal manager: Dec. 15, 2026 10:00 A.M., PT

Written questions received no later than: Jan. 7, 2026 3:00 P.M., PT

Submit SOQ package (Parts A & B): Feb. 1, 2027 3:00 P.M., PT

Notify DBEs of rankings (approximately): Mar. 11, 2027 3:00 P.M., PT

Step 2: RFP Process Approximate Date Due Time

RFP issued to no more than the three highest scoring entities (approximately):

Apr. 26, 2027 TBD

Submit site visit clearance information: May 3, 2027 TBD

Mandatory RFP briefing conference: May 10, 2027 TBD

Conduct mandatory site visits (approximately):

May 25-27, 2027 TBD

Confidential meeting #1: Jun. 7, 2027 TBD

Written questions received no later than: Jun. 11, 2027 TBD

Confidential meeting #2 (optional): Jun. 18, 2027 TBD

Submit project proposal: Jul. 13, 2027 TBD

Technical reviews complete: Aug. 11, 2027 TBD

Proposal interviews: Aug. 26-27, 2027 TBD

Step 3: Agreement Award Approximate Date Due Time

Selection: Quarter 3 of 2027 TBD

Agreement execution: Quarter 4 of 2027 TBD

Step 4: Project Completion

Anticipated within 36 months of notice to proceed.

III. Qualification and Proposal Process Overview

A. Step 1: RFQ

Interested DBEs shall submit a SOQ as further defined in this RFQ. The SOQ’s received in accordance with this RFQ will be reviewed and scored. CDCR, assisted by its consultants, will select no more than the three highest scoring DBEs to advance to step 2.

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 9 of 25

B. Step 2: RFP

The DBEs shall attend a mandatory RFQ briefing conference. Remote access to the RFQ briefing conference will be granted using the log in information below.

This conference is intended to review the RFQ/RFP process and submittal requirements, general project scope, the State's SB and DVBE program requirements, and the qualification/proposal process. DBEs may submit questions to CDCR's project team during the conference. Question cards will be distributed at the RFQ briefing conference for those who are physically in attendance. The "meeting chat" feature within Microsoft Teams will be utilized for remote attendees. Only questions submitted in writing will be responded to by CDCR after the meeting in an addendum.

The mandatory pre-proposal conference will be conference at the time and place listed below:

December 9, 2026 at 11:00 AM., PT, at:

Facility Planning, Construction and Management Division

9838 Old Placerville Road, Sacramento, CA. 95827

Participants may also attend remotely via Microsoft Teams. Remote access details are provided below:

https://teams.microsoft.com/meet/2736673582664209?p=AaaGDouHVPX8VnXHXC Meeting ID: 273 667 358 266 420 9

Passcode: pi7BH98A Join with a video conferencing device

Video Conference ID: 119 976 968 6 or call in (audio only)

+1 916-701-9994,,817945686#United States, Sacramento Phone Conference ID: 817 945 686#

This RFQ process consists of three parts:

Part A: Questionnaire Part B: Experience Part C: Selection

No more than the three highest scoring DBEs from the RFQ process will be issued the RFP and project proposal agreement. No communication between the DBE and CDCR shall occur between the submission of the RFQ and the issuance of the RFP. CDCR intends to enter into project proposal agreements with each of the DBEs selected to submit project proposals for the design and construction of the project. In return for submission of a project proposal acceptable to CDCR, CDCR will pay each DBE that is not awarded the design-build agreement the amount of $30,000 for their project proposal. The DBE awarded the design-build agreement shall not be eligible to receive the $30,000.00. In the event a design-build agreement is not awarded, all DBEs that have submitted proposals acceptable to CDCR shall be eligible for the $30,000 payment. CDCR will own each of the project proposals and all materials without limitations.

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 10 of 25

Project proposal agreements shall be signed by the DBEs and submitted prior to, or at the mandatory RFP briefing conference. All DBEs shall attend the mandatory RFP briefing conference. The exact date and time of the RFP briefing conference will be indicated in the

RFP.

The RFP process consists of three parts:

Part A: Project proposal Part B: Proposal interview/presentation Part C: Selection

C. Step 3: Agreement award - Upon full and complete performance and acceptance by CDCR of the project proposal, CDCR intends to enter into a design-build agreement with only one of the DBEs who have submitted a project proposal. CDCR reserves the right to not award a design-build agreement.

D. Step 4: Project completion – Project delivery and completion is anticipated within

36 months of the design-build agreement’s notice to proceed.

IV. Request for Qualifications

A. Step 1 – CDCR requests interested DBEs to submit their SOQs for evaluation in response to this RFQ.

Design-build team members listed in their SOQs shall also be listed by the DBE in their proposals in response to the RFP. Should there be a need for a change in design-build team members at any time during the RFQ or RFP phase, the DBE shall submit requests to substitute team members for good cause to CDCR in writing for approval. Design-build team member substitution requests shall cause CDCR to re-evaluate a DBE's SOQ and may cause the CDCR to rescind a DBE's invitation to participate in the RFP process and to offer an invitation to participate in the RFP process to another DBE.

CDCR does not require a specific form of contractual arrangement among the design-build team members, however the DBE that proposes to become a party to the agreement with CDCR shall be a prime contractor that possesses a California "Class A – General Engineering Contractor" or "Class B – General Building Contractor" license. The DBE shall be required to unconditionally guarantee the due and punctual performance of any and all obligations of the DBE under the design-build agreement.

If the DBE is a privately held corporation, limited liability company, partnership, or joint venture, a listing of all the shareholders, partners, or members who will perform work on the project known at the time of submission shall be provided. In addition, if the proposed DBE is a corporation, limited liability company, partnership, joint venture, or other legal Entity, a copy of the organization documents or agreement committing to form the organization shall be submitted with the SOQ. The information provided shall be certified under penalty of perjury by the DBE and its general partners or joint venture members.

The evaluation criteria that will be employed by CDCR to qualify prospective DBEs shall consist of three RFQ process parts as listed on page 10.

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 11 of 25

All prospective DBEs shall complete Part A - Questionnaire set forth in this RFQ. DBEs not completing and passing Part A – Questionnaire, shall not be evaluated under Part B – Experience, and their SOQ shall not be evaluated further. No more than the three highest scoring DBEs shall then be issued the RFP.

All questions regarding this RFQ must be emailed to Samantha Brammer at Samantha.Brammer@cdcr.ca.gov no later than 3:00 P.M., PT, on January 7, 2027.

Questions received after this time will not be considered. Copies of all the questions and answers will be distributed by an addendum to all DBEs that have officially submitted a DBEs’ Exhibit A, Application for Qualification, and that have attended the mandatory RFQ briefing conference.

Except as outlined above, prospective DBEs or anyone receiving the RFQ, shall not contact, discuss with, or inquire of any CDCR consultant, employee, or elected official on any matter relating to this solicitation process. This requirement is to ensure that identical information and inconsistent, incomplete, or inaccurate information is not communicated. Information not formally issued by CDCR in writing cannot be relied upon as accurate.

The completed SOQ package shall include one original paper version marked "ORIGINAL" in the upper right-hand corner of the front cover; four additional hard copies securely bound, each marked "COPY" in the upper right-hand corner of the cover; and one PDF file (in color on a CD-ROM and also on a flash drive) by 3:00 P.M., PT on February 1, 2027, by mail, courier, or hand delivered to:

Capital Planning and Project Services Branch ATTN: Samantha Brammer, Contract Analyst

9838 Old Placerville Rd., Suite B Sacramento, CA 95827

Phone (279) 223-2803

Submittals received after the specified time and date will not be considered and will be returned to sender. THIS SUBMISSION DEADLINE WILL BE STRICTLY ENFORCED.

B. Part A- Questionnaire

DBEs shall complete and submit qualifications as described in the attached Part A – Questionnaire. The SOQ evaluation team will evaluate and score Part A – Questionnaire for completeness; conformance to project requirements; history of violations, claims, arbitration and/or litigation; and other requirements including:

1. Declaration: The DBE shall declare that the information provided in Part A – Questionnaire and Part B – Experience has been prepared using reasonable diligence and is true and complete to the best of the signer's knowledge. A person who certifies as true any material matter that he or she knows to be false is guilty of a misdemeanor and shall be punished by not more than one year in a county jail, by a fine of not more than $5,000, or by both a fine and imprisonment.

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 12 of 25

If the requested declaration is not provided, then the DBE will receive a score of Fail for this question or possible disqualification from the RFQ process.

2. Design-build team: Identify firms proposed by the DBE. Each responding DBE shall submit qualifications for a prime contractor (Class A – General Engineering Contractor or Class B – General Building Contractor), an engineer of record, architect of record, structural engineer, mechanical engineer, electrical engineer, fire protection engineer, as well as fire alarm, fire protection, and electrical subcontractors, each appropriately licensed in California. These firms are required to be identified as part of the design-build team at a minimum. One shall serve as the project's engineer of record for their particular discipline(s).

If the information requested for the design-build disciplines as listed above is not provided, then the DBE will receive a score of Fail for this question.

3. Licensure: Submission of evidence demonstrating possession of all required registration, credentials or licenses for disciplines listed above in item two shall be required to design and construct the project.

If the license information requested is not provided, or any of them do not possess current California licenses, then the DBE will receive a score of Fail for this question.

4. Financial information: Submission of evidence, including financial statements, that establishes that the DBE has the capacity to perform the work under the project and obtain all required payment and performance bonding.

If the DBE does not demonstrate the financial capacity to perform the work or provide the requested statement from a bonding company, then the DBE will receive a score of Fail for this question.

5. Insurance: Submission of evidence that establishes that the DBE has the capacity to obtain payment and performance bonds, liability insurance, worker's compensation insurance, professional liability-errors and omissions insurance, and other insurance requirements as identified in Part A – Questionnaire.

If the DBE does not provide the requested declaration that the DBE can obtain the requested insurance, then the DBE will receive a score of Fail for this question.

6. Termination/Failure to Complete; Violations; Claims, Arbitration and Litigation:

Submission of declarations, information, and details concerning all of the following:

a. Declaration certifying that applying members of the DBE have not had a surety company finish work on any project within the last three years.

If the requested declaration is not provided, then the DBE will receive a score of Fail for

b. Any construction or design claim or litigation totaling more than $500,000 or 5% of the annual value of work performed, whichever is less, settled against any member of the DBE within the last five years.

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 13 of 25

If the requested information is not provided, then the DBE will receive a score of Fail for

c. Serious violations of the Occupational Safety and Health Act, as provided in Part 1 (commencing with Section 6300) of Division 5 of the Labor Code, settled against any member of the DBE.

If the requested information is not provided, then the DBE will receive a score of Fail for this question.

d. Any violations of Federal or State law, including, but not limited to, those laws governing the payment of wages, benefits, or personal income tax withholding, or of Federal Insurance Contributions Act withholding requirements, CDCR disability insurance withholding, or unemployment insurance payment requirements, settled against any member of the DBE over the last five years. For the purposes of this sub clause, only violations by a DBE member as an employer shall be deemed applicable, unless it is shown that the DBE member, in his or her capacity as an employer, had knowledge of his or her subcontractor's violations or failed to comply with the conditions set forth in subdivision (b) of Section 1775 of the Labor Code.

e. Provide information and details that the DBE or its members, any officer of the DBE or its members, or any employee of the DBE or its members who has a proprietary interest in the DBE, has ever been disqualified, removed, or otherwise prevented from bidding on, or completing a Federal, State, or local government project because of a violation of law or a safety regulation in accordance with Public Contract Code 10162.

f. Violations of the Contractor's State License Law (Chapter 9 [commencing with Section 7000] of Division 3 of the Business and Professions Code), excluding alleged violations or complaints.

If the requested information is not provided, then the DBE will receive a score of Fail for this question.

g. Any conviction of any member of the DBE of submitting a false or fraudulent claim to a public agency over the last 10 years.

If the requested information is not provided or if any member of the DBE was convicted, then the DBE will receive a score of Fail for this question.

h. Provide a declaration that the DBE will comply with all provisions of law applicable to the project and a commitment that the DBE and its subcontractors at every tier will use a skilled and trained workforce to perform all work on the project that falls within an apprentice-able occupation in the building and construction trades in accordance with the Public Contract Code, Division 2, Part 1, Chapter 2.9, sections 2600 et seq.

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 14 of 25

If the requested declaration and commitment is not provided, then the DBE will receive a score of Fail for this question.

7. Safety Record: Submission of evidence that establishes the DBE has an acceptable safety record. An acceptable safety record is when its experience modification rating (EMR) for the most recent three year period is an average of 1.00 or less, and its average total recordable injury or illness rate and average lost work rate for the most recent three-year period does not exceed the applicable statistical standards for the construction industry. See Part A – Questionnaire for specific requirements.

If the DBE's average EMR is above 1.00 for the most recent three year period, then the DBE will receive a score of Fail for this question.

CDCR, when requested by the DBE, will hold in confidence any information required by items C to H above.

In the event a DBE receives the score of Fail for any one question, then the DBE shall be deemed to have failed Part A, and the DBE's SOQ will not be evaluated further.

C. Part B – Experience

The DBE and its team members' experience will be evaluated by the SOQ evaluation team and allocated points for the relative merit of written data and responses to the following sections.

A total of 1,600 points will apply to Part B - Experience, as follows:

1. Design-Build Team: (300 Points)

a. Organization

b. Firm profiles

2. Personnel Resumes: (450 Points)

a. Key DBE management personnel resumes

b. Key design team personnel resumes

c. Key construction team personnel resumes

3. Project Profiles: (300 Points)

a. Design experience

b. Construction experience

4. Project References: (100 Points)

5. Project Approach: (450 Points)

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 15 of 25

The information provided shall clearly identify the relevance of each component of the project approach in regard to the requirements of the project. The DBE shall provide specific project-related experience and individual team member histories in design-build delivery, the relevance of size, scope, complexity, and energy-efficient design. In order for a project to qualify as relevant, the information submitted shall demonstrate that the teams or the individual team member's involvement with the project began at the initial stages and extended through completion and acceptance of the project by the owner. Provide examples of the previous projects the team members have completed as a team in the past.

V. Selection

No more than the three highest scoring DBEs from the RFQ process will be invited to participate in the RFP phase and submit project proposals. The scoring will be based upon the total points (1,600 total points) accumulated from the scoring of Parts A and B.

The SOQ evaluation process will consider and score the following:

A. Design-build team

1. Organization

Provide an organizational chart demonstrating the proposed make-up of the major participants in the Design-Build Team. The organizational chart assists the evaluators in understanding how the team envisions working together. In addition, describe the teaming relationships within the Design-Build Team Prime Contractor, licensed Architect, Structural Engineer, Mechanical Engineer, Electrical Engineer, Fire Protection Engineer, and listed Subcontractors, for whom similar projects have been completed together. Describe how team members have directed or participated in projects with strong team organizations, clear lines of authority and hierarchy. Provide information on how the schedules, budgets and quality have been maintained throughout the Project. Indicate how communication between the various team members and the owner was managed to ensure all project requirements were addressed and met. (The RFP process will include the development of a detailed Project Management Plan.)

If the DBE is a corporation, Limited Liability Company, partnership, or joint venture, a listing of all of the shareholders, partners, or members who will perform work on the Project known at the time of submission shall be provided.

The information provided shall be certified under penalty of perjury by the DBE and its general partners or joint venture members. See PART A – QUESTIONNAIRE, item 1, Declaration, above for certification.

The organization will be scored based upon its clarity in identifying the key team members and firms, and in describing the relationships between the team members on projects of similar size, scope and complexity.

2. Firm profiles

For each design-build team member listed in Part A, Section 2 – Design-build team, submit firm profiles providing evidence that establishes the firm has completed or demonstrates

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 16 of 25 that the firm has the capability to complete projects of similar size, scope and complexity to the proposed project, including experience with OSFM, fire alarm design and construction in existing secure facilities with multiple buildings and design-build delivery method. Include firm's history, significant accomplishments and professional philosophy. The profile for the DBE shall be limited to 15 pages. The profiles for other design-build team members shall be limited to two pages for each profile. The pages shall be double-sided, standard 8-1/2x11 and 11x17 if necessary for schedules and drawings. The minimum acceptable font size is 12-point.

B. Personnel resumes

Submit resumes of key personnel who will be assigned to this project and who will contribute a significant effort. Each resume must include name, qualifications, and the anticipated degree of involvement during each of the design and construction phases of the project. The resumes shall provide evidence that the key personnel have sufficient experience and training to competently manage and complete the design and construction of the project. Personnel resumes shall be limited to two pages in length for each resume. The pages shall be double-sided, standard 8-1/2x11 and 11x17, if necessary for schedules and drawings. The minimum acceptable font size is 12-point. Submit the following resumes:

1. Key DBE management personnel resumes

Key personnel shall include: project executive, design principal, construction principal, and any other management team leaders with key responsibilities for the day-to-day execution of the project.

2. Key design team personnel resumes

Key personnel include professionals who will be assigned to this project to provide quality control and design leadership in architectural, structural, mechanical, electrical, fire alarm, and fire protection disciplines.

3. Key construction team personnel resumes

Key personnel to include professionals from the prime contractor who shall be assigned to this project to provide schedule, quality control, safety, and construction leadership in general. The DBE shall include the following key subcontractors they plan to use for:

a. Fire Alarm (C-10 – Electrical Contractor)

b. Electrical (C-10 – Electrical Contractor)

c. Fire Protection (C-16 – Fire Protection Contractor)

DBEs are encouraged to submit additional resumes as necessary to fully communicate any special knowledge or capabilities to be provided by the team. Additional points will be awarded to project personnel with current Design-Build Institute of America certifications.

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 17 of 25

C. Projects profiles

Each DBE shall provide design and construction project profiles for a combined minimum of two and maximum of five projects completed within the last 10 years. The DBE shall clearly identify the relevance of each project, addressing relevance to the project. Projects shall demonstrate the team's design and construction experience on similar projects in terms of new construction, similar size, scope, complexity, including specific experience in fire alarm, connected systems, working in CDCR or correctional institutions (if any) and design-build experience.

For each project, complete and submit the Project Profile Information Sheet provided in Part B – Experience. Additional information, photos, and other graphic materials may be included. Include a narrative addressing the design/construction reasoning and salient features for each project, as well as a brief statement indicating the relevance of the previous project to this project. Project profiles shall be limited to three pages total per submitted project. The pages may be double-sided, standard 8-1/2x11 and 11x17 if necessary for schedules and drawings.

The minimum acceptable font size is 12-point. When possible, indicate the degree of involvement by key personnel proposed in this SOQ for each project profile. Submit the following project profiles:

1. Design experience

Submit a portfolio of project profiles representative of the engineer of record's ability to provide a high level of quality on similar projects. Describe how your team separates itself from the competition. Submit project profiles for a maximum of five projects completed in the last 10 years. List at least two projects with an overall construction cost each in excess of $20 million dollars (at least one must be in California). List at least two projects using the design-build delivery method, (at least one of which must be in California). List CDCR projects first, if any. Use forms provided herein.

Provide examples of projects completed and describe the design approach. Include information that addresses the architect of record and the engineer of record's ability to design a project that demonstrates:

a. Fire alarm replacements as architect of record and the engineer of record.

b. Illustrate experience with involvement of OSFM.

c. Design that involves multiple buildings and phasing in an active facility.

d. Secure facilities that emphasize security and safety.

e. Efficient operations which are flexible and functional for future needs.

2. Construction Experience

Submit a portfolio of project profiles representative of the prime contractor's ability to construct with a high level of quality on their projects. Submit a description with a maximum of five construction projects completed in the last 10 years by the prime contractor. List at least two projects with an overall construction cost each in excess of $20 million dollars (at

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 18 of 25 least one must be in California). List at least two projects using the design-build delivery method, (at least one of which must be in California). List CDCR or other correctional institution projects first, if any. Use forms provided herein.

D. Project References

Provide project references for each project submitted for Section C – Projects Profiles above.

The reference should be from the project's owner or the project owner's representative. Each reference shall include at least the following information: project name, firm or agency name, contact name, contact's title, phone number, e-mail address, and relationship to the project.

CDCR intends to contact those individuals and firms that are listed as references by the DBE and points will be assigned based upon the references’ verification that the DBE's characterization of its involvement in the project is accurate, and their overall assessment of the quality of those services provided, specifically addressing: project management, cost and schedule control, quality and warranty call-backs, commissioning, functioning of installed equipment, and overall client satisfaction. It is the DBE's responsibility to verify that all references listed can be reached by telephone.

1. Confidentiality

CDCR reserves the right to maintain the confidentiality of the past performance information provided by the references listed by the DBE, as well as references obtained by other means. By submitting a proposal for consideration under this solicitation, the DBE agrees that it shall not seek to discover from any source the contents of such communications.

E. Project Approach

Provide the DBE's approach to addressing design-build projects including the reasoning and approach to the design of fire alarm projects within an institution system requiring access and phasing in multiple areas. This section is limited to five pages. The pages may be double-sided, standard 8-1/2 x 11. The minimum acceptable font size is 12-point. The DBE shall also demonstrate its understanding of design-build projects by identifying those features that are critical to design-build projects, such as fire alarm, security electronics, and communication systems with a description of how those features have been addressed to ensure successful projects.

Project approach with public and private design and construction are acceptable.

CDCR will score the project approach based on the responses to the following items:

1. How the DBE shall ensure a high level of design quality and functionality of the fire alarm and its connected systems. Documentation of how the DBE minimized design errors and omissions in the CDs on previous projects.

2. How the DBE shall achieve a high level of quality and that the intent of the design is fulfilled during construction. The team members' philosophy to producing quality installation and the approach to quality control and the process with the OSFM. Information on the approach to minimizing warranty callbacks and documentation that attests to the success of this

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 19 of 25 approach. How coordination was achieved between design disciplines and how it was communicated to the construction team.

3. Illustrate the DBE's understanding of replacing a fire alarm system in an occupied correctional facility, including the security requirements of the Institution.

4. Illustrate the DBE's approach to phasing in conjunction with schedule while repairing/replacing life-safety systems in an active multi-building facility.

5. How has the DBE limited the impact on occupied buildings and ensured good relations with the owner on previous projects?

6. How has the DBE addressed safety and security during construction?

7. Provide a narrative demonstrating experience and successful partnerships with the OSFM.

8. How shall the DBE ensure fire alarm replacement in the existing facilities shall be designed for durability, maintainability, functionality, longevity, and reliability?

9. Describe the DBE's approach to collaboration with all stakeholders during the design-build process.

10. Explain how the DBE will ensure that work interconnecting with a fully code-compliant fire alarm replacement system be addressed properly, including, but not limited to, electrical systems, fire protection systems, mechanical/HVAC systems, life safety systems, architectural components, security and access control, emergency power, fire rate penetration, heads of wall, fireproofing, smoke control, and testing and commissioning.

11. Describe your experience with project scheduling, including software used, three-week look ahead, baseline scheduling, monthly impact updates and time impact analysis.

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 20 of 25

VI. Step 2 – Request for Proposal, for Reference Only

CDCR intends to enter into a project proposal agreement with up to three DBEs selected to submit project proposals during the RFP Phase as described in Step 2, RFP Qualification and Proposal Process Overview.

DBEs' attendance is mandatory at RFP briefing conference. A signed project proposal agreement shall be submitted to the CDCR before the RFP briefing conference. DBEs shall attend multiple-day site visits to survey the existing conditions.

Should one or more of the selected DBEs decline to execute the project proposal agreement, CDCR reserves the right to invite the next highest scoring DBE or entities from the RFQ process to participate in the RFP phase. Instructions for the RFP process will be discussed at the briefing conference.

A. Part A – Project Proposal

The project proposals shall be responsive to the requirements set forth in the RFP and include but not be limited to the following:

1. Declaration

A declaration that the DBE shall complete the design and construct the project for the sum provided for by CDCR in the project proposal agreement.

2. Designated Subcontractors

CDCR may ask the DBE to name specialty contractors as part of their proposal. All other subcontractors shall be competitively awarded by the DBE in accordance with Public Contract Code, Division 2, Part 2, Chapter 1, Article 3, Sections 10140 et. seq. and Article 6, Section 10193.

3. Proposed Design, Major Elements and Systems Description

A description and conceptual drawings for the project's design and major systems. Submittal requirements may include, without limitation, the following:

a. Design

Prepare written and graphic documents to depict proposer's design in response to CDCR's requirements.

b. Fire Alarm Systems Program Report

Spreadsheet format indicating all proposed in-scope locations for fire alarm replacement with net areas and gross footages, and a descriptive summary of work to be completed in each location.

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 21 of 25

c. Conceptual Design Plans

Prepare conceptual plans and other graphics that illustrate the project's concepts, including conceptual drawings and preliminary performance criteria as necessary to describe the DBE's intent (i.e., site plan, floor plans, network diagrams, and fire alarm system single line diagram).

d. Technical Design Narrative

Narrative detailing the basic approach to the project:

1) Detailed systems operational description, proposed manufactures and component information.

2) Detailed proposed timeline for National Fire Protection Association 25 FACU replacement, and fire alarm system replacement.

3) Detail the approach of aspirating smoke detection retrofit in housing units. Include information on number of detectors, sampling tube lengths, sample time, selectivity and programming, testing and commissioning of the system.

4) Detail the use and application of fire watch.

5) Detail fire alarm system cutover approach.

6) Detail networking approach for the fire alarm reporting to central control and fire house.

e. Detention Components

Provide narrative, conceptual plan and product information as necessary to describe the proposed detention components (i.e., locations and security for FACU, devices, appliances, panels, and equipment).

f. Longevity

Design and construct the fire alarm systems with life expectancy of not less than 25 years with minimal maintenance.

g. Maintainability

Design and construct the fire alarm systems that function and operate according to specifications, and that are easy to maintain, over its expected life.

h. Collaboration

The DBE shall be expected to exhibit and foster ongoing teamwork and collaboration in every aspect of the effort to complete the project design, construction, commissioning, transition, completion, and activation.

REQUEST FOR QUALIFICATIONS

RFQ NO.: PMB202607

November 12, 2026Page 22 of 25

i. Innovation

Use of innovative design solutions and materials to meet architectural and engineering requirements, consistent with…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .