Filter First Water Program RFP
Closed State & local contract opportunity Posted
- Solicitation number
- RFP-TKS-260000000094-1
- State
- Michigan
- Responses due
Opportunity facts
- Jurisdiction
- UNSPSC codes
- 47101528 Water treatment dryers
- 47101541 Ozone water treatment equipment
- 47101545 Rotating biological contactor RBC
- 47101548 Filter control console
- 47101553 Fiber filter
- 47101560 Filter underdrain equipment
- 47101570 Oxidation ditch
- 47101573 Flocculator
- 47101543 Surface aerator
- 47101547 Surface washing device
Show all 40
- 47101562 Drum screen
- 47101564 Waste crusher
- 47101569 Wastewater plane screen
- 47101572 Disc screen
- 47101574 Sequencing batch reactor
- 47101523 Collection tanks
- 47101546 Grit removal system
- 47101549 Gravity filter
- 47101556 Water trough
- 47101563 Wastewater coalescer
- 47101565 Waste gas burner
- 47101567 Electrodialysis machine
- 20142600 Production control system instrumentation
- 47101517 Ultraviolet wastewater disinfection equipment
- 47101522 Packaged water treatment systems
- 47101525 Dewatering equipment
- 47101540 Chemical feeder
- 47101542 Air flotation equipment
- 47101550 Compression filter
- 47101551 Up flow filter
- 47101552 Moving bed filter
- 47101554 Jar tester
- 47101555 Baffle wall
- 47101557 Inclined plate settler
- 47101558 Foam breaker
- 47101559 Scum removal equipment
- 47101561 Adulteration treatment equipment
- 47101566 Multiple media filter
- 47101571 Chlorine gas neutralization unit
- 47101577 Flow arrangement wall
Updated .
About this opportunity
The Filter First Water Program RFP is a procurement initiative by Thornapple Kellogg Schools targeting comprehensive drinking water infrastructure upgrades across five school locations: McFall Elementary, Lee Elementary, Page Elementary, TK Middle School, and TK High School. The project involves procuring and installing filtered bottle-filling stations, single bottle filling stations with fountains, filtered faucets, and specific kitchen equipment like combi-ovens and kettles. Sealed bids are due by 1:00 P.M. on Monday, November 3, 2025, with a mandatory pre-bid meeting scheduled for Monday, October 27, 2025, at 8:30 a.m. at Thornapple Kellogg High School. The project must be completed and invoiced by May 1, 2026, and is funded partially with federal funds, which triggers Davis-Bacon Act prevailing wage requirements. Bidders must provide detailed pricing for demolition, installation, and equipment for each school location, using the provided bid form, and the Board of Education will evaluate bids based on factors including uniformity, delivery time, and preference, not necessarily defaulting to the lowest bid.
The procurement appears to have no specific set-aside designations for disadvantaged enterprises, but requires several mandatory disclosures including a familial relationship affidavit and an Iran Linked Business affidavit. All prices must be F.O.B. in Middleville, Michigan, and must include installation, removal of existing fountains, and securing new drinking water fixtures. While specific budget ranges are not explicitly stated, the comprehensive nature of the project involving multiple school locations suggests a potentially significant investment. The Board of Education reserves the right to accept or reject any bid, indicating flexibility in the procurement process. Prospective bidders should be prepared to demonstrate comprehensive capabilities in water fixture installation, equipment procurement, and compliance with federal funding requirements. The project's scope implies that vendors should have experience in school infrastructure improvements and the technical capability to handle multi-site installations of specialized drinking water equipment.
Files
| File | Type | Posted |
|---|---|---|
| Drinking Fountain RFP - October 2025.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity