Federal Project No. 0657302 Njdot Job No. 7112313 Resurfacing & Safety Improvements Of Griffith & Grant Streets, County Road #657

Closed State & local contract opportunity Posted

Solicitation number
Bid # 26-28
State
New Jersey
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The New Jersey Department of Transportation is soliciting bids for resurfacing and safety improvements on Griffith and Grant Streets (County Road #657) under Federal Project No. 0657302 and NJDOT Job No. 7112313, with bids due November 18, 2026. The project is located in the City of Salem, Salem County, New Jersey, and is funded under the federal STBG program.

Work covers 1.30 miles (+/-) from Front Street (N.J.S.H. Route #49) to the Salem City/Mannington Township line. Scope includes milling the existing HMA surface course to a minimum depth of two inches, repairing and replacing failing HMA sections, and overlaying with HMA Surface Course, Mix Designation 12.5M64. Full-depth reconstruction is required at specific sections, consisting of full-depth milling, new HMA base course, and final HMA surface course. Minor storm drainage work includes installing stormwater-quality debris-reducing cast iron curb pieces and resetting inlet castings. Safety improvements include traffic signs, long-life traffic stripes, and beam guide rail at specified locations, with inlet grates replaced by bicycle-safe grates where required. Proposed grades, structures, and handicap ramps must be laid out by a NJ Licensed Surveyor. No recycled asphalt material is permitted in the HMA surface course mix, and no non-vegetative surface treatment may be constructed within 300 linear feet of any floodplain or wetland area. A Material Transfer Vehicle is not required. The contract includes a fuel price adjustment and an asphalt price adjustment.

Opportunity text

Griffith & Grant Streets, County Road #657, from Front Street, N.J.S.H. Route #49 to the Salem City/Mannington Township line, for a total distance of 1.30 miles (+/-), in the City of Salem, Salem County, New Jersey. Work includes but is not limited to the milling of the existing HMA surface course, repair and replacement of specific failing HMA surface and surface materials, and overlay of the roadway with HMA Surface Course, Mix Designation 12.5M64. Milling shall be a minimum depth of two (2) inches as prescribed by the typical section and as agreed upon in the field by the Engineer. Minor storm drainage work will be done, including the installation of stormwater quality debris reducing cast iron curb pieces and resetting existing inlet castings to achieve positive flow of drainage into the inlets. Proposed pavement grades, including structures, and handicap ramps shall be laid out by the Contractor using a survey level and acceptable survey techniques by a NJ Licensed Surveyor. No recycled asphalt material (RAP) shall be permitted in the HMA surface course mix. A fuel price adjustment and an asphalt price adjustment are provided. No non-vegetative surface treatment shall be constructed within 300 linear feet of any floodplain or wetland area. At specific sections along the various roadway, perform full-depth reconstruction, consisting of full-depthmilling, placement of new HMA Base Course, and followed up with the final HMA Surface Course. This operation will eliminate any areas where the existing asphalt pavement has failed. This contract does not require the use of a Material Transfer Vehicle (MTV). Safety improvements as called for in the plans shall consist of construction of traffic signs, long-life traffic stripes, and and installation of beam guide rail at specific locations along the project. Existing inlet grates shall be replaced with bicycle safe grates where required. All traffic control devices and measures as required shall be in place in a satisfactory manner before construction work begins. All traffic control devices as called for in the plans or specifications shall conform to the Manual on Uniform Traffic Control Devices of the Federal Highway Administration. Successful bidder shall provide two (2) certified traffic directors, flaggers, at all times, controlling both ends of the work zone. During all work, the contractor shall conform to the standard NJDOT traffic control rules & regulations for alternating traffic flow within a maximum work zone length of 2,000 feet. Any item of work that is called for in the plans or specifications that is not covered by a specific construction item, the price thereof shall be included in the cost of the various other bid items listed in the proposal of this contract. Any construction items that are designated "if and where directed," the actual quantity thereof shall be determined in the field by the engineer. The Contractor will be required to submit a progress schedule, which shall be in accordance with the standard specifications. The progress schedule is to be submitted to the County Engineer for approval at or before the required pre-construction meeting. There is no bid item for progress schedule in this contract. The cost for preparation and updating the progress schedule will be included in the cost of various bid items. The Contractor is also required to produce a pre-construction video which documents the existing site conditions within the limits of the project prior to any construction operations. The Contractor is to submit this video to Office prior to beginning any work for the project. The Traffic Control Plan is based on the requirements provided in the current Manual on Uniform Traffic Control Devices (MUTCD) and in the 2019 NJDOT Standard Roadway Construction Traffic Control Bridge Construction Details booklet. The Traffic Control Plan is based on the requirements provided in the current Manual on Uniform Traffic Control Devices (MUTCD) and in the 2019 NJDOT Standard Roadway Construction Traffic Control Bridge Construction Details booklet. It shall be the responsibility of the Contractor to have the utilities located before any excavation takes place and to exercise caution when excavating. Any damage to existing utilities caused by construction shall be repaired by the Contractor at his expense. The milling and paving operation shall be performed in such a manner to limit the milled surface exposure to 48 hours at any given time. Therefore, the paving shall be performed in echelon, with a maximum length to the total possible length of milling in a single eight (8) hour work day, thus allowing enough time to clean, repair, level, and resurface the roadway within two (2) days. The limits of reconstruction may exceed those limits shown on the contract plans, and the Contractor shall perform roadway reconstruction, on a 'if and where directed basis as required by the owner and his or her engineer, with no negotiations in the contract prices. Driveway access shall be maintained at all times during construction. If it becomes necessary to close a driveway for a short period of time, the property owner shall be notified well in advance of the closure and must be agreeable to the time frame. Any driveway disturbed must be restored to usable condition by the end of the workday. Prior to the construction of any HMA material on the existing pavement, the surface shall be swept clean of all dirt and debris and any other material that would be detrimental to the construction of the new pavement surface. There is no bid item for sweeping; the cost thereof shall be included in the cost of the various otherbid items. The existing pavement and surface paving shall be tack coated after it is cleaned just prior to construction of the new surface. Tack coat shall be applied immediately before the placement of leveling course HMA, and immediately before the final overlay of the entire roadway surface. Tack coat shall mean RS-1 Tack Coat unless otherwise directed; Emulsion shall be prohibited. Any areas in which the new edge of sidewalk, edge of pavement, or top of curb is greater in height than 1/2" above the existing ground surface, the proposed turf repair strip as called for in this contract shall be constructed as soon as possible after the overlay has been constructed. This work shall be done concurrently with the overlay work, not as a separate phase after the overlay work has been completed. The Contractor shall utilize a mechanical plate tamper during the turf repair strip operation along the shoulder of the road in order to satisfactorily compact the soil to an elevation equal to the new pavement surface. Any settled areas shall be filled in and re-compacted by the Contractor. The Contractor shall finish one (1) section of roadway at a time completely before starting the next section. Roadway sections shall not exceed the total possible length of milling in a single 8-hour workday as designated in these supplemental specifications under scope of work. There will be no deviation from this procedure without the express permission of the County Engineer. It shall be the responsibility of the Contractor to prepare a letter to the bus transportation department, local offices, all adjacent property owners on the project indicating the type of work to be done and the approximate time it will take to complete the work; this shall include any tree or hedge trimming required or mailbox resetting to perform the contracted work. The letter shall be submitted to the County Engineer for approval. After approval by the County gineer, the Contractor shall deliver the letters a minimum of three (3) days prior to the start of construction. The Contractor shall maintain the flow of traffic through this area to the maximum extent possible. Nighttime work is not permitted. In the case of any schools located within the project limits, the Contractor shall make contact with the appropriate school officials a minimum of one (1) week prior to the start of construction and discuss anyimpacts that the project will have on their school bus routes. Every effort shall be made to accommodate construction time restrictions that the schools might require due to bus schedules, special events, etc. The Train Method shall be used in milling and paving the roadway, thus requiring full mobilization of both the milling and level-paving crews, starting and lagging each other, by no more than four (4)crew hours. The top course shall not be placed upon one (1) lane before the entire roadway surfaceis milled and leveled. The sloped plate-paving operation shall be used at all times for the final course of paving, with no deviations.