F. M. 741 Water Meter Vault
Closed State & local contract opportunity Posted
- Solicitation number
- 2025-103
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 031 Air Conditioning, Heating, And Ventilating Equipment, Parts And Accessories
- 495 Laboratory And Field Equipment And Supplies: Biology, Botany, Geology, Microbiology, Zoology, Etc.
- 890 Water Supply, Groundwater, Sewage Treatment, And Related Equipment, Not For Air Conditioning, Steam Boiler, Or Laboratory Reagent Water
- 910 Building Maintenance, Installation And Repair Services
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 998 Sale Of Surplus And Obsolete Items
- UNSPSC codes
- 10101900 Insects
- 40000000 Distribution and Conditioning Systems and Equipment and Components
- 30121722 PE rainwater and sewer separation walls
- 72000000 Building and Facility Construction and Maintenance Services
- 76000000 Industrial Cleaning Services
- 72140000 Heavy construction services
- 40100000 Heating and ventilation and air circulation
- 31250000 Pneumatic and hydraulic and electric control systems
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The City of Mesquite, located in Dallas County, Texas, is seeking bids for the F.M. 741 Water Meter Vault Project (Contract No. 2025-103), a critical water infrastructure improvement initiative. The procurement involves the installation of a tapping sleeve and valve on a 24-inch Heartland water line, including a precast concrete water meter box with an electromagnetic flow meter, new electrical service, and a flow meter control panel. Key project deliverables include a 90-calendar day contract period with substantial completion expected by September 13, 2025. Bidders must submit a 5% bid bond or cashier's/certified check and provide performance and payment bonds for 100% of the contract price. Qualified bidders are required to submit comprehensive qualification information within 48 hours of the bid opening, including financial statements and references. The bid is scheduled to be opened on April 23, 2025, with a pre-bid conference on April 15, 2025, and anticipated City Council award on May 19, 2025, with a notice to proceed and construction start date of June 16, 2025.
The procurement includes provisions for disadvantaged business enterprises (DBE) participation and requires compliance with various state and local regulations, including prohibitions on contracts with companies boycotting Israel. Bidders must adhere to prevailing wage rate requirements and provide detailed documentation of their business qualifications. The project will be funded through the City of Mesquite's Public Works Department - Engineering Division, with the full scope involving approximately 10,300 linear feet of water infrastructure improvements. While no specific incumbent vendors are mentioned, the project requires integration with existing utility infrastructure and will involve coordination with local utility companies and property owners. Although a precise award value is not explicitly stated, the comprehensive nature of the project, including multiple technical components such as pipeline installation, utility crossings, and electrical systems, suggests a significant municipal infrastructure investment. Interested contractors must demonstrate technical expertise in municipal water infrastructure projects and comply with all specified regulatory and documentation requirements.
Opportunity text
Project consists of the installation of a tapping sleeve and valve of a 24-inch Heartland water line, the installation of the precast concrete water meter box with electromagnetic flow meter, installation of the new electrical service and flow meter control panel.
Files
| File | Type | Posted |
|---|---|---|
| 2025-103adn1.pdf | ||
| 2025-103plans.pdf | ||
| 2025-103specs.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity