EXT DPW | PW 887 Ptrr Tnnt Imprv & Fire
Open State & local contract opportunity Posted
- Solicitation number
- SFGOV-0000012033
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Joe Chin joe.chin@sfdpw.org
Opportunity details come from sfcitypartner.sfgov.org. Updated .
About this opportunity
The San Francisco Department of Public Works is soliciting bids for tenant improvement and fire alarm control unit replacement at the Mental Health Rehabilitation Center, 887 Potrero Avenue, on the San Francisco Zuckerberg General Hospital campus, with a mandatory pre-bid meeting on November 4, 2026 at 1:00 p.m. and bids due December 2, 2026 at 2:30 p.m. The solicitation indicates no set-asides, and no LBE subcontracting participation requirement or good faith efforts are mandated.
Bidders must hold a California Class "B" contractor license and be registered with the California Department of Industrial Relations under Labor Code section 1725.5, with limited exceptions for bid purposes under section 1771.1(a). Bidders must also comply with the Healthcare Security Ordinance, the Paid Sick Leave Ordinance, prevailing wage requirements from both the state Department of Industrial Relations and the federal Secretary of Labor under the Copeland Act, San Francisco Labor and Employment Code Article 111 minimum compensation, Clean Construction requirements under San Francisco Administrative Code Section 6.25 and Environment Code Chapter 25, and Partnering Level 2 elements.
Scope includes nurse call communication upgrades; conversion of isolation rooms to locked, ligature-resistant seclusion rooms at select locations; accessibility improvements to restrooms, kitchenettes, drinking fountains, and paths of travel to ground-level exits; leveling of the main entry threshold and adjacent sidewalk; card readers at select locations; and facility-wide fire alarm control unit replacement. The fire alarm work specifies new Edwards EST-4 control units, with replacement of remote annunciators, fire alarm boxes, smoke and duct smoke detectors, addressable modules, and elevator shunt trip and heat detectors.
The estimated construction cost is approximately $5.4 million, with 460 consecutive calendar days allowed for completion. The contract is awarded as lump sum bid items with progressive payments and includes liquidated damages. The City and County of San Francisco funds the project. Awards are subject to Controller certification of fund availability and Contract Monitoring Division certification of Equal Benefits Provisions compliance within two weeks of award notification.
Pre-bid attendees must arrive in front of the building by 12:50 p.m., are escorted inside at 1:00 p.m., and must wear face masks inside the building. A guided site walk follows the formal presentation. Bids are submitted online via ShareFile, and bid opening is conducted live via Microsoft Teams. Addenda and bid changes are distributed by email and posted on the DPW Electronic Bid Documents Download Site, where bid documents are available at no cost. Project inquiries go to Project Manager Joe Chin at (628) 206-7177 or Joe.Chin@sfdpw.org.
Opportunity text
887 Potrero Tenant Improvement and Fire Alarm Control Unit Replacement The Scope of Work: This project involves multiple upgrades to the Mental Health Rehabilitation Center (MHRC) at the San Francisco Zuckerberg General Hospital campus intended to expand and improve MHRC's capacity to serve adult patients requiring intensive mental health treatment and care. The work includes upgrades to the facility's nurse call communication system for use between nursing staff and patients requiring assistance; conversion of isolation rooms to locked seclusion rooms with ligature-resistant features at select locations; accessibility improvements at restrooms, kitchenettes, drinking fountains, and paths of travel to ground-level exits; leveling of the main entry threshold and nearby sidewalk for accessibility compliances; and installation of card readers at select locations to control access to sensitive areas. Additionally, the project includes a facility-wide fire alarm control unit replacement to replace the outdated facility-wide fire alarm components with like-for-like, new Edwards EST-4 fire alarm control units and select fire alarm devices. The system components to be replaced include remote annunciators, fire alarm boxes, smoke detectors, duct smoke detectors, and addressable modules along with new elevator shunt trip and heat detectors added to the elevator system. The time allowed for completion is 460 consecutive calendar days. The estimated construction cost is approximately $5,400,000. For more information, contact the Project Manager Joe Chin by phone: (628) 206-7177 or email: Joe.Chin@sfdpw.org. A pre-bid meeting has been scheduled at the project site on Wednesday, November 4, 2026, at 1:00 PM. Located at 887 Potrero Avenue, San Francisco. All attendees that will be attending the pre-bid meeting shall arrive and meet in front of the building by no later than 12:50 PM. All attendees will be escorted by City staff promptly at 1:00 PM to the meeting location inside the building. Any attendees that arrive late will need to wait for the next available City staff to escort them inside the building and to the meeting. All attendees will also be required to wear a face mask while inside the building. After the formal pre-bid presentation by the City Team, attendees will be escorted on a guided site walk by City staff through the project work area. During the site walk, photos of the facility and work area will be allowed but neither the residents at the facility nor any personal information of the residents may be photographed. Class "B" license is required to bid. 1. DPWs Contracts & Bid Opportunities, https://bidopportunities.apps.sfdpw.org/: to obtain Advertisements, Tabulation of Bids, and Awards information. 2. DPW Electronic Bid Documents Download Site, https://bsm.sfdpw.org/ContractAdmin/Login.aspx to obtain Bid Documents, Plan Holders Lists and Addendum information; may be downloaded at no cost. 3. OLSE, http://sfgsa.org/index.aspx?page=391: Office of Labor Standards Enforcement (OLSE) website to obtain documents distributed at the pre-bid conference and other information. Documents include: -Healthcare Security Ordinance -Pre-bid and pre-construction information -Paid Sick Leave Ordinance Fact Sheet Effective March 1, 2015, no contractor or subcontractor may be listed in a bid for a public works project unless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. DISCLAIMER: The information provided below is a summary of the project. Addenda and other bid changes will be distributed by email only to Plan Holders with email addresses, and will be posted on the DPW Electronic Bid Documents Download Site. DPW is not liable for damages or costs incurred in connection with the use of, or any reliance upon, any information contained on this website. The bid information is subject to typographical error.
Files
| File | Type | Posted |
|---|---|---|
| EXT_DPW___PW_887_Ptrr_Tnnt_Imprv___Fire.pdf | ||
| 0000012033_-_Legal_Notice.pdf | ||
| EXT_DPW___PW_887_Ptrr_Tnnt_Imprv___Fire.xml | XML file |
On GovTribe