0000012033_-_Legal_Notice.pdf

PDF 109 KB Posted

Attached to
EXT DPW | PW 887 Ptrr Tnnt Imprv & Fire
Solicitation number
SFGOV-0000012033
Issued by
San Francisco County, San Francisco City, California

About this file

This legal notice is an Invitation for Quotations issued by the City and County of San Francisco, Department of Public Works, for a tenant improvement and fire alarm control unit replacement project at 887 Potrero Avenue. The project scope includes upgrades to the Mental Health Rehabilitation Center at San Francisco Zuckerberg General Hospital, encompassing improvements to the nurse call communication system, conversion of isolation rooms to locked seclusion rooms with ligature-resistant features, accessibility upgrades to restrooms, kitchenettes, drinking fountains and paths of travel, leveling of the main entry threshold and sidewalk, installation of card readers for access control, and a facility-wide replacement of fire alarm components including Edwards EST-4 control units, remote annunciators, fire alarm boxes, smoke detectors, duct smoke detectors, addressable modules, elevator shunt trip devices, and heat detectors. Quotations must be submitted online via ShareFile by 2:30 p.m. on December 2, 2026, with bid opening conducted live via Microsoft Teams. A pre-bid meeting is scheduled for November 4, 2026, at 1:00 p.m. at the project site, with attendees required to arrive by 12:50 p.m. for escort into the building. The project completion timeline is 460 consecutive calendar days, and the estimated construction cost is approximately $5,400,000.

The contract is awarded on a Lump Sum Bid Items basis with progressive payments. Bidders must hold a Class "B" license and comply with California Labor Code Section 1725.5 registration requirements with the Department of Industrial Relations. The project requires compliance with prevailing wage determinations from both the State Department of Industrial Relations and federal Secretary of Labor under the Copeland Act, as well as San Francisco Labor and Employment Code Article 111 minimum compensation requirements. Clean Construction is mandated per San Francisco Administrative Code Section 6.25 and Chapter 25 of the Environment Code. Partnering Level 2 elements are required, and the contract includes liquidated damages provisions. No LBE subcontracting participation requirement or good faith efforts are mandated for this contract. Bid documents and plan holder lists are available without cost from the Public Works Electronic Bid Documents Download site. Contract awards are subject to certification by the Controller regarding fund availability and by the Contract Monitoring Division regarding Equal Benefits Provisions compliance within two weeks of award notification.

View the file

Other files

File Type Posted
EXT_DPW___PW_887_Ptrr_Tnnt_Imprv___Fire.xml XML file
EXT_DPW___PW_887_Ptrr_Tnnt_Imprv___Fire.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR QUOTATIONS

CITY & COUNTY OF SAN FRANCISCO

SAN FRANCISCO PUBLIC WORKS

SOURCING EVENT ID: 0000012033

887 POTRERO TENANT IMPROVEMENT AND FIRE ALARM CONTROL UNIT REPLACEMENT

PW 887 PTRR TNNT IMPRV & FIRE

Quotations shall be submitted online via ShareFile until 2:30:00 p.m. on December 2, 2026, after which the bid opening will be conducted live online via Microsoft Teams. Contract Administration will email the Microsoft Teams meeting information to all Plan Holders approximately 24 hours prior to Bid Opening

Digital files of Bid Documents, Plan Holders Lists, and Addenda may be downloaded at no cost from the Public Works Electronic Bid Documents Download site at https://bsm.sfdpw.org/ContractAdmin/Login.aspx. Please visit the Contracts, Quotes and Payments webpage at https://bidopportunities.apps.sfdpw.org for more information. Notices regarding Addenda and other bid changes will be distributed by email to Plan Holders.

The Scope of Work: This project involves multiple upgrades to the Mental Health Rehabilitation Center (MHRC) at the San Francisco Zuckerberg General Hospital campus intended to expand and improve MHRC’s capacity to serve adult patients requiring intensive mental health treatment and care. The work includes upgrades to the facility’s nurse call communication system for use between nursing staff and patients requiring assistance; conversion of isolation rooms to locked seclusion rooms with ligature-resistant features at select locations; accessibility improvements at restrooms, kitchenettes, drinking fountains, and paths of travel to ground-level exits; leveling of the main entry threshold and nearby sidewalk for accessibility compliances; and installation of card readers at select locations to control access to sensitive areas. Additionally, the project includes a facility-wide fire alarm control unit replacement to replace the outdated facility-wide fire alarm components with like-for-like, new Edwards EST-4 fire alarm control units and select fire alarm devices. The system components to be replaced include remote annunciators, fire alarm boxes, smoke detectors, duct smoke detectors, and addressable modules along with new elevator shunt trip and heat detectors added to the elevator system.

The time allowed for completion is 460 consecutive calendar days. The estimated construction cost is approximately $5,400,000. For more information, contact the Project Manager Joe Chin by phone: (628) 206-7177 or email: Joe.Chin@sfdpw.org.

On July 1, 2014, the registration program under section 1725.5 of the California Labor Code went into effect. The program requires that all contractors and subcontractors who bid or work on a public works project register and pay an annual fee to the California Department of Industrial Relations (“DIR”).

No contractor or subcontractor may be listed in a bid or awarded a contract for a public works project unless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

This Project shall incorporate the required partnering elements for Partnering Level 2. Refer to Section 01 31 33 - Partnering Procedures for more details.

Pursuant to San Francisco Administrative Code (“Administrative Code”) Section 6.25 and Chapter 25 of the Environment Code, “Clean Construction” is required for the performance of all work.

The Specifications include liquidated damages. Contract will be on a Lump Sum Bid Items basis.

Progressive payments will be made.

https://bsm.sfdpw.org/ContractAdmin/Login.aspx https://bidopportunities.apps.sfdpw.org/ mailto:Joe.Chin@sfdpw.org

A quote may be rejected if the City determines that any of the bid item prices are materially unbalanced to the potential detriment of the City.

The LBE Subcontracting Participation Requirement and Good Faith Efforts are not required for this contract.

A pre-bid meeting has been scheduled at the project site on Wednesday, November 4, 2026, at 1:00 PM.

Located at 887 Potrero Avenue, San Francisco. All attendees that will be attending the pre-bid meeting shall arrive and meet in front of the building by no later than 12:50 PM. All attendees will be escorted by City staff promptly at 1:00 PM to the meeting location inside the building. Any attendees that arrive late will need to wait for the next available City staff to escort them inside the building and to the meeting. All attendees will also be required to wear a face mask while inside the building. After the formal pre-bid presentation by the City Team, attendees will be escorted on a guided site walk by City staff through the project work area. During the site walk, photos of the facility and work area will be allowed but neither the residents at the facility nor any personal information of the residents may be photographed.

For information on the City’s Contractor Development Program, call (415) 986-3999 or email cdp@imwis.com

Class "B" license is required to bid.

Minimum wage rates for this project must comply with the current General Prevailing Wage as determined by the State Department of Industrial Relations and the Federal General Prevailing Wage Determinations of the Secretary of Labor under the Copeland Act. Minimum wage rates other than applicable to General Prevailing Wage must comply with San Francisco Labor and Employment Code Article 111: Minimum Compensation.

Pursuant to Charter Section 3.105, all contract awards are subject to certification by the Controller as to the availability of funds.

Bidders are hereby advised that the Contractor to whom the Contract is awarded must be certified by the Contract Monitoring Division as being in compliance with the Equal Benefits Provisions of Article 131 of the San Francisco Labor and Employment Code within two weeks after notification of award.

If a bidder objects on any ground to any bid specification or legal requirement imposed by this Advertisement for Bids, the bidder shall, no later than the 10th working day prior to the date of Bid Opening, provide written notice to the Contract Administration Division, San Francisco Public Works, setting forth with specificity the grounds for the objection.

Right reserved to reject any or all quotations and waive any minor irregularities.

mailto:cdp@imwis.com

File details come from the government source that posted it. Updated .